-
Start Preamble
AGENCY:
Coast Guard, DHS.
ACTION:
Notice of temporary deviation from regulations.
SUMMARY:
The Commander, First Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Upper Hack Bridge at mile 6.9, across the Hackensack River, at Secaucus, New Jersey. The deviation is necessary to facilitate electrical repairs. This deviation will allow the bridge to remain in the closed position for two days.
DATES:
This deviation is effective from 4 a.m. on March 10, 2011 through 11 p.m. on March 11, 2011.
ADDRESSES:
Documents mentioned in this preamble as being available in the docket are part of docket USCG-2011-0093 and are available online at http://www.regulations.gov, inserting USCG-2011-0093 in the “Keyword” and then clicking “Search”. They are also available for inspection or copying at the Docket Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
If you have questions on this rule, call or e-mail Mr. Joe Arca, Project Officer, First Coast Guard District, telephone (212) 668-7165. If you have questions on viewing the docket, call Renee V. Wright, Program Manager, Docket Operations, telephone 202-366-9826.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
The Upper Hack Bridge, across the Hackensack River at mile 6.9 has a vertical clearance in the closed position of 8 feet at mean high water and 13 feet at mean low water. The existing drawbridge operation regulations are listed at 33 CFR 117.723(d).
The waterway has commercial vessels of various sizes.
The owner of the bridge, New Jersey Transit, requested a temporary deviation to facilitate electrical system rehabilitation at the bridge.
Under this temporary deviation the Upper Hack Bridge, mile 6.9, across the Hackensack River may remain in the Start Printed Page 13289closed position from 4 a.m. on March 10, 2011 through 11 p.m. on March 11, 2011. Vessels that can pass under the bridge without a bridge opening may do so at all times.
In accordance with 33 CFR 117.35(e), the bridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35.
Start SignatureDated: February 28, 2011.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. 2011-5671 Filed 3-10-11; 8:45 am]
BILLING CODE 9110-04-P
Document Information
- Effective Date:
- 3/10/2011
- Published:
- 03/11/2011
- Department:
- Coast Guard
- Entry Type:
- Rule
- Action:
- Notice of temporary deviation from regulations.
- Document Number:
- 2011-5671
- Dates:
- This deviation is effective from 4 a.m. on March 10, 2011 through 11 p.m. on March 11, 2011.
- Pages:
- 13288-13289 (2 pages)
- Docket Numbers:
- Docket No. USCG-2011-0093
- PDF File:
- 2011-5671.pdf
- CFR: (1)
- 33 CFR 117