2011-6965. Southern Nuclear Operating Company, Inc.; Notice of Availability of the Final Supplemental Environmental Impact Statement for Vogtle Electric Generating Plant Units 3 and 4; Combined License Application Review
-
Start Preamble
Notice is hereby given that the U.S. Nuclear Regulatory Commission (NRC) has published a final supplemental environmental impact statement (FSEIS), NUREG-1947, Final Supplemental Environmental Impact Statement for Combined Licenses (COLs) at the Vogtle Electric Generating Plant Units 3 and 4: Final Report.”
The draft supplemental EIS was published in September 2010; a notice of availability appeared in the Federal Register on September 3, 2010 (75 FR 54146). The purpose of this notice is to inform the public that the FSEIS is available for public inspection. The FSEIS may be viewed online at: http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1947. In addition, the FSEIS is available for inspection in the NRC Public Document Room (PDR) located at One White Flint North, 11555 Rockville Pike, Rockville, MD 20852 or from the NRC Agency-wide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html,, which provides access through the NRC Electronic Reading Room (ERR) link. The ADAMS accession number for the FSEIS is ML11076A010. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the PDR reference staff by telephone at 1-800-397-4209/1-301-415-4737 or by e-mail to pdr.resource@nrc.gov.
In addition, the Burke County Library located at 130 Highway 24 So., Waynesboro, GA 30830-4572 has also agreed to make the FSEIS available to the public.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Ms. Mallecia Sutton, Project Manager, Environmental Projects Branch 1, Division of Site and Environmental Reviews, Office of New Reactors, U.S. Nuclear Regulatory Commission, Mail Stop T7103, Washington, DC 20555. Ms. Sutton may also be contacted at 301-415-0673 or via e-mail to Mallecia.Sutton@nrc.gov.
Start SignatureDated at Rockville, Maryland this 18th day of March 2011.
For the Nuclear Regulatory Commission.
Nilesh Chokshi,
Deputy Director, Division of Site and Environmental Reviews, Office of New Reactors.
[FR Doc. 2011-6965 Filed 3-23-11; 8:45 am]
BILLING CODE 7590-01-P
Document Information
- Published:
- 03/24/2011
- Department:
- Nuclear Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2011-6965
- Pages:
- 16645-16645 (1 pages)
- Docket Numbers:
- Docket Nos. 52-025 and 52-026, NRC-2008-0252
- PDF File:
- 2011-6965.pdf
- Supporting Documents:
- » Southern Nuclear Operating Company Inc; Vogtle Electric Generating Plant Units 3 and 4
- » Southern Nuclear Operating Company Inc; Vogtle Electric Generating Plant Units 3 and 4
- » Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Inspections, Tests, Analyses, and Acceptance Criteria
- » Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Main Control Room Emergency Habitability System Changes
- » Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; PXS/ADS Line Resistance Changes
- » Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 3 and 4; Pipe Rupture Hazard and Flooding Analysis
- » Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Station, Units 3 and 4; Addition of a Residual Heat Removal Suction Relief Valve for Low-Temperature Overpressure Protection; Exemption and Combined License Amendment; Issuance
- » Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; Clarification of Raceway and Raceway System Designations; Issuance of Exemption and Combined License Amendment
- » Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Units 3 and 4; Central Chilled Water System Optimization Changes; Issuance of Exemption and Combined License Amendment
- » Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant, Units 3 and 4, Inspections, Tests, Analyses, and Acceptance Criteria; Determination of Successful Completion of Inspections, Tests, and Analyses