2012-22184. Oliver Hydro LLC; Notice Soliciting Scoping Comments  

  • Start Preamble

    Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.

    a. Type of Application: Original Major License.

    b. Project No.: P-13005-003.

    c. Date filed: December 14, 2011.

    d. Applicant: Oliver Hydro LLC.

    e. Name of Project: William Bacon Oliver Lock and Dam Hydroelectric Project

    f. Location: At the U.S. Army Corps of Engineers' (Corps) William Bacon Oliver Lock and Dam on the Black Warrior River, in Tuscaloosa County, Alabama. The project would occupy 8.7 acres of United States lands administered by the Corps' Mobile District.

    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).

    h. Applicant Contact: Brent Smith, Symbiotics LLC, 371 Upper Terrace, Suite 2, Bend, OR 97702; (541) 330-8779; or email at brent.smith@symbioticsenergy.com.

    i. FERC Contact: Allan Creamer at (202) 502-8365, or via email at allan.creamer@ferc.gov.

    j. Deadline for filing scoping comments: October 4, 2012.

    All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site http://www.ferc.gov/​docs-filing/​efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/​docs-filing/​ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, or toll free at 1-866-208-3676, or for TTY, (202) 502-8659. Although the Commission strongly encourages electronic filing, documents may also be Start Printed Page 55469paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426.

    The Commission's Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.

    k. This application is not ready for environmental analysis at this time.

    l. The proposed project would utilize the Corps' existing William Bacon Oliver Lock and Dam, and would consist of the following new facilities: (1) A forebay; (2) an intake structure; (3) a powerhouse containing two generating units with a total capacity of 11.72 megawatts (MW); (4) a 150-foot-long, 68-foot-wide tailrace; (5) a proposed 1.7-mile-long, 25 kilovolt (kV) transmission line; (6) a switchyard; and (7) appurtenant facilities. The proposed project would have an average annual generation of 42.6 GWh, and operate in a run-of-river mode utilizing surplus water from the William Bacon Oliver Lock and Dam, as directed by the Corps.

    m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov,, using the “eLibrary” link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above.

    n. You may also register online at http://www.ferc.gov/​docs-filing/​esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.

    o. Scoping Process

    The Commission staff intends to prepare a single Environmental Assessment (EA) for the William Oliver Bacon Lock and Dam Hydroelectric Project in accordance with the National Environmental Policy Act. The EA will consider both site-specific and cumulative environmental impacts and reasonable alternatives to the proposed action.

    Commission staff does not propose to conduct any on-site scoping meetings at this time. Instead, we are soliciting comments, recommendations, and information, on the Scoping Document (SD) issued on August 31, 2012.

    Copies of the SD outlining the subject areas to be addressed in the EA were distributed to the parties on the Commission's mailing list and the applicant's distribution list. Copies of the SD may be viewed on the web at http://www.ferc.gov using the “eLibrary” link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, call 1-866-208-3676 or for TTY, (202) 502-8659.

    Start Signature

    Dated: September 4, 2012.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2012-22184 Filed 9-7-12; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Comments Received:
0 Comments
Published:
09/10/2012
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2012-22184
Pages:
55468-55469 (2 pages)
Docket Numbers:
Project No. 13005-003
PDF File:
2012-22184.pdf