2013-07151. Drawbridge Operation Regulations; Saugus River, Saugus and Lynn, MA  

  • Start Preamble Start Printed Page 18849

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Notice of temporary deviation from regulations.

    SUMMARY:

    The Coast Guard has issued a temporary deviation from the regulation governing the operation of the Route 107 temporary bridge across the Saugus River, mile 2.5, between Saugus and Lynn, Massachusetts. The bridge will not open for vessel traffic during the installation of the moveable span. This deviation allows the bridge to remain closed for six days.

    DATES:

    This deviation is effective from April 1, 2013, until April 6, 2013.

    ADDRESSES:

    Documents mentioned in this preamble as being available in the docket are part of docket USCG-2013-0176 and are available online at www.regulations.gov, inserting USCG-2013-0176 in the “Keyword” and then clicking “Search”. They are also available for inspection or copying at the Docket Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE., Washington, DC, 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    If you have questions on this rule, call or email Mr. John McDonald, Project Officer, First Coast Guard District, telephone (617) 223-8364, john.w.mcdonald@uscg.mil. If you have questions on viewing the docket, call Barbara Hairston, Program Manager, Docket Operations, telephone 202-366-9826.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The Route 107 temporary bridge, across the Saugus River, mile 2.5, between Saugus and Lynn, Massachusetts, has a vertical clearance in the closed position of 6 feet above mean high water and 15 feet above mean low water. The bridge is required to open on signal at all times in accordance with 33 CFR 117.5.

    The waterway is transited by recreational and commercial fishing boats.

    The lift span at the new bridge will be installed between April 1, 2013, and April 6, 2013. During that time period the span will be in the closed position. Once the construction of the lift span is completed the draw will be placed in the full open position until all the operating machinery is installed.

    The upstream facilities and the fishermen were advised regarding the six day closure. No objections were received.

    Under this temporary deviation the Route 107 temporary bridge may remain in the closed position from April 1, 2013 through April 6, 2013.

    In accordance with 33 CFR 117.35(e), the bridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35.

    Start Signature

    Dated: March 18, 2013.

    Gary Kassof,

    Bridge Program Manager, First Coast Guard District.

    End Signature End Supplemental Information

    [FR Doc. 2013-07151 Filed 3-27-13; 8:45 am]

    BILLING CODE 9110-04-P

Document Information

Comments Received:
0 Comments
Effective Date:
4/1/2013
Published:
03/28/2013
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of temporary deviation from regulations.
Document Number:
2013-07151
Dates:
This deviation is effective from April 1, 2013, until April 6, 2013.
Pages:
18849-18849 (1 pages)
Docket Numbers:
Docket No. USCG-2013-0176
PDF File:
2013-07151.pdf
CFR: (1)
33 CFR 117