-
Start Preamble
Start Printed Page 35018
In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47879), the Office of Energy Projects has reviewed the application for exemption from licensing for the Cheshire Mills Hydroelectric Project, to be located on Nubanusit Brook, in the town of Harrisville, Cheshire County, New Hampshire, and has prepared an Environmental Assessment (EA). In the EA, Commission staff analyzes the potential environmental effects of the project and concludes that issuing an exemption for the project, with appropriate environmental measures, would not constitute a major federal action significantly affecting the quality of the human environment.
A copy of the EA is on file with the Commission and is available for public inspection. The EA may also be viewed on the Commission's Web site at http://www.ferc.gov using the “eLibrary” link. Enter the docket number, excluding the last three digits in the docket number field, to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.
For further information, contact Brandon Cherry at (202) 502-8328 or brandon.cherry@ferc.gov.
Start SignatureDated: June 4, 2013.
Kimberly D. Bose,
Secretary.
[FR Doc. 2013-13808 Filed 6-10-13; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Comments Received:
- 0 Comments
- Published:
- 06/11/2013
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2013-13808
- Pages:
- 35018-35018 (1 pages)
- Docket Numbers:
- Project No. 14332-000-NH
- PDF File:
- 2013-13808.pdf