2013-17289. Birch Power Company; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests  

  • Start Preamble

    Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.

    a. Type of Application: Major License (5 Megawatts or less).

    b. Project No.: 13102-003.

    c. Date filed: July 2, 2013.

    d. Applicant: Birch Power Company.

    e. Name of Project: Demopolis Lock and Dam Hydroelectric Project.

    f. Location: At the U.S. Army Corps of Engineers' Demopolis Lock and Dam, on the Tombigbee River, west of the city of Demopolis in Marengo and Sumter Counties, Alabama. Lands managed by the Federal government are located within the project boundary.

    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).

    h. Applicant Contact: Nicholas E. Josten, GeoSense, 2742 Saint Charles Ave, Idaho Falls, ID 83404, (208) 528-6152.

    i. FERC Contact: Michael Spencer, (202) 502-6093, michael.spencer@ferc.gov.

    j. Cooperating agencies: Federal, state, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues that wish to cooperate in the preparation of the environmental document should follow the instructions for filing such requests described in item l below. Cooperating agencies should note the Commission's policy that agencies that cooperate in the preparation of the environmental document cannot also intervene. See, 94 FERC ¶ 61,076 (2001).

    k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's regulations, if any resource agency, Indian Tribe, or person believes that an additional scientific study should be conducted in order to form an adequate factual basis for a complete analysis of the application on its merit, the resource agency, Indian Tribe, or person must file a request for a study with the Commission not later than 60 days from the date of filing of the application, and serve a copy of the request on the applicant.

    l. Deadline for filing additional study requests and requests for cooperating agency status: September 2, 2013.

    All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site http://www.ferc.gov/​docs-filing/​efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/​docs-filing/​ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY, (202) 502-8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and five copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426.

    m. The application is not ready for environmental analysis at this time.

    n. The proposed project would utilize the existing U.S. Army Corps of Engineers' Demopolis Lock and Dam and Reservoir, and would consist of the following new facilities: (1) A 900-foot-long intake channel; (2) a powerhouse adjacent to the north end of the existing dam containing two turbine-generator units for a total installed capacity of 48,000 kilowatts; (3) a 200-foot-long tailrace channel; and (4) a 4.4 mile-long 115 kilo-Volt transmission line. The project is estimated to generate an average of 213,000 megawatt-hours annually.

    o. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above.

    You may also register online at http://www.ferc.gov/​docs-filing/​esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.

    p. With this notice, we are initiating consultation with the Alabama State Historic Preservation Officer (SHPO), as required by section 106 of the National Historic Preservation Act and the regulations of the Advisory Council on Historic Preservation, 36 CFR 800.4.

    q. Procedural schedule: The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate.

    Issue Notice of AcceptanceOctober 2013.
    Issue Scoping Document 1 for commentsNovember 2013.
    Comments on Scoping Document 1December 2013.
    Issue Scoping Document 2February 2014.
    Issue notice of ready for environmental analysisFebruary 2014.
    Commission issues EA, draft EA, or draft EISAugust 2014.
    Comments on EA or draft EA or draft EISSeptember 2014.
    Start Printed Page 43190
    Commission issues final EA or final EISNovember 2014.
    Start Signature

    Dated: July 11, 2013.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2013-17289 Filed 7-18-13; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
07/19/2013
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2013-17289
Pages:
43189-43190 (2 pages)
Docket Numbers:
Project No. 13102-003
PDF File:
2013-17289.pdf