2014-16301. Approval and Promulgation of Air Quality Implementation Plans; Maryland; Section 110(a)(2) Infrastructure Requirements for the 2010 Nitrogen Dioxide National Ambient Air Quality Standards  

  • Start Preamble

    AGENCY:

    Environmental Protection Agency (EPA).

    ACTION:

    Final rule.

    SUMMARY:

    The Environmental Protection Agency (EPA) is approving a State Implementation Plan (SIP) revision submitted by the State of Maryland pursuant to the Clean Air Act (CAA). Whenever new or revised National Ambient Air Quality Standards (NAAQS) are promulgated, the CAA requires states to submit a plan for the implementation, maintenance, and enforcement of such NAAQS. The plan is required to address basic program elements, including, but not limited to regulatory structure, monitoring, modeling, legal authority, and adequate resources necessary to assure attainment and maintenance of the standards. These elements are referred to as infrastructure requirements. The State of Maryland has made a submittal addressing the infrastructure requirements for the 2010 nitrogen dioxide (NO2) NAAQS.

    DATES:

    This final rule is effective on August 13, 2014.

    ADDRESSES:

    EPA has established a docket for this action under Docket ID Number EPA-R03-OAR-2013-0649. All documents in the docket are listed in the www.regulations.gov Web site. Although listed in the electronic docket, some information is not publicly available, i.e., confidential business information (CBI) or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in hard copy form. Publicly available docket materials are available either electronically through www.regulations.gov or in hard copy for public inspection during normal business hours at the Air Protection Division, U.S. Environmental Protection Agency, Region III, 1650 Arch Street, Philadelphia, Pennsylvania 19103. Copies of the State submittal are available at the Maryland Department of the Environment, 1800 Washington Boulevard, Suite 705, Baltimore, Maryland 21230.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Ruth Knapp, (215) 814-2191, or by email at knapp.ruth@epa.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    I. Background

    On February 9, 2010 (75 FR 6474), EPA established a new 1-hour primary NAAQS for NO2 at a level of 100 parts per billion (ppb), based on a 3-year average of the 98th percentile of the yearly distribution of 1-hour daily maximum concentrations. Section 110(a) of the CAA requires states to submit SIPs to provide for the implementation, maintenance, and enforcement of a new or revised NAAQS. Specifically, section 110(a)(1) requires states to submit SIPs meeting the applicable requirements of section 110(a)(2) within three years following the promulgation of such NAAQS, or within such shorter period as EPA may prescribe, and section 110(a)(2) requires states to address specific elements for monitoring, basic program requirements and legal authority that are designed to assure attainment and maintenance of the newly established or revised NAAQS.

    The contents of a SIP submission may vary depending upon the data and analytical tools available to the state, as well as the provisions already contained in the state's SIP at the time in which the state develops and submits the submission for a new or revised NAAQS. States were required to submit such SIPs for the 2010 NO2 NAAQS to EPA no later than January 2013.

    II. Summary of SIP Revision

    On April 15, 2014 (79 FR 21173), EPA published a notice of proposed rulemaking (NPR) for the State of Start Printed Page 40665Maryland proposing approval of Maryland's August 14, 2013 submittal to satisfy several requirements of section 110(a)(2) of the CAA for the 2010 NO2 NAAQS. In the NPR, EPA proposed approval of the following infrastructure elements: Sections 110(a)(2)(A), (B), (C), (D), (E), (F), (G), (H), (J), (K), (L), and (M), or portions thereof. This action does not include any action on section 110(a)(2)(I) of the CAA which pertains to the nonattainment requirements of part D, Title I of the CAA, because this element is not required to be submitted by the 3-year submission deadline of CAA section 110(a)(1), and will be addressed in a separate process if necessary. The rationale which supports EPA's proposed action, including the scope of infrastructure SIPs in general, is explained in the NPR and the technical support document (TSD) accompanying the NPR and will not be restated here. The TSD is available online at www.regulations.gov,, Docket ID Number EPA-R03-OAR-2013-0649.

    III. Final Action

    EPA is approving as a revision to the Maryland SIP the following infrastructure elements in Maryland's August 14, 2013 submittal for the 2010 NO2 NAAQS: Sections 110(a)(2)(A), (B), (C), (D), (E), (F), (G), (H), (J), (K), (L), and (M). This rulemaking action does not include section 110(a)(2)(I) of the CAA which pertains to the nonattainment requirements of part D, Title I of the CAA, since this element is not required to be submitted by the three year submission deadline of section 110(a)(1), and will be addressed in a separate process.

    IV. Statutory and Executive Order Reviews

    A. General Requirements

    Under the CAA, the Administrator is required to approve a SIP submission that complies with the provisions of the CAA and applicable Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, EPA's role is to approve state choices, provided that they meet the criteria of the CAA. Accordingly, this action merely approves state law as meeting Federal requirements and does not impose additional requirements beyond those imposed by state law. For that reason, this action:

    • Is not a “significant regulatory action” subject to review by the Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993);
    • Does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.);
    • Is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.);
    • Does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4);
    • Does not have Federalism implications as specified in Executive Order 13132 (64 FR 43255, August 10, 1999);
    • Is not an economically significant regulatory action based on health or safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997);
    • Is not a significant regulatory action subject to Executive Order 13211 (66 FR 28355, May 22, 2001);
    • Is not subject to requirements of Section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the CAA; and
    • Does not provide EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, under Executive Order 12898 (59 FR 7629, February 16, 1994).

    In addition, this rule does not have tribal implications as specified by Executive Order 13175 (65 FR 67249, November 9, 2000), because the SIP is not approved to apply in Indian country located in the state, and EPA notes that it will not impose substantial direct costs on tribal governments or preempt tribal law.

    B. Submission to Congress and the Comptroller General

    The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. EPA will submit a report containing this action and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. A major rule cannot take effect until 60 days after it is published in the Federal Register. This action is not a “major rule” as defined by 5 U.S.C. 804(2).

    C. Petitions for Judicial Review

    Under section 307(b)(1) of the CAA, petitions for judicial review of this action must be filed in the United States Court of Appeals for the appropriate circuit by September 12, 2014. Filing a petition for reconsideration by the Administrator of this final rule does not affect the finality of this action for the purposes of judicial review nor does it extend the time within which a petition for judicial review may be filed, and shall not postpone the effectiveness of such rule or action. This action, addressing infrastructure requirements of section 110(a)(2)(A), (B), (C), (D), (E), (F), (G), (H), (J), (K), (L), and (M) of the CAA for the 2010 NO2 NAAQS for the State of Maryland, may not be challenged later in proceedings to enforce its requirements. (See section 307(b)(2).)

    Start List of Subjects

    List of Subjects in 40 CFR Part 52

    • Environmental protection
    • Air pollution control
    • Incorporation by reference
    • Nitrogen dioxide
    • Reporting and recordkeeping requirements
    End List of Subjects Start Signature

    Dated: June 25, 2014.

    W.C. Early,

    Acting Regional Administrator, Region III.

    End Signature

    40 CFR part 52 is amended as follows:

    Start Part

    PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS

    End Part Start Amendment Part

    1. The authority citation for part 52 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 42 U.S.C. 7401 et seq.

    End Authority

    Subpart V—Maryland

    Start Amendment Part

    2. In § 52.1070, the table in paragraph (e) is amended by adding the entry for “Section 110(a)(2) Infrastructure Requirements for the 2010 Nitrogen Dioxide NAAQS” at the end of the table to read as follows:

    End Amendment Part
    Identification of plan.
    * * * * *

    (e) * * *Start Printed Page 40666

    Name of non- regulatory SIP revisionApplicable geographic areaState submittal dateEPA approval dateAdditional explanation
    *         *         *         *         *         *         *
    Section 110(a)(2) Infrastructure Requirements for the 2010 Nitrogen Dioxide NAAQSStatewide.8/14/20137/14/2014 [Insert Federal Register citation]This action addresses the following CAA elements: 110(a)(2) (A), (B), (C), (D), (E), (F), (G), (H), (J), (K), (L), and (M).
    End Supplemental Information

    [FR Doc. 2014-16301 Filed 7-11-14; 8:45 am]

    BILLING CODE 6560-50-P

Document Information

Effective Date:
8/13/2014
Published:
07/14/2014
Department:
Environmental Protection Agency
Entry Type:
Rule
Action:
Final rule.
Document Number:
2014-16301
Dates:
This final rule is effective on August 13, 2014.
Pages:
40664-40666 (3 pages)
Docket Numbers:
EPA-R03-OAR-2013-0649, FRL-9913-41-Region-3
Topics:
Air pollution control, Environmental protection, Incorporation by reference, Nitrogen dioxide, Reporting and recordkeeping requirements
PDF File:
2014-16301.pdf
Supporting Documents:
» Technical Support Document
» EPA Guidance on Infrastructure State Implementation Plan (SIP) Elements Under Clean Air Act Sections 110(a)(1) and 110(a)(2)
» State Submittal - Transmittal Letter and Enclosures
» Completeness Letter
CFR: (1)
40 CFR 52.1070