-
Start Preamble
Docket Nos. Duke Energy Beckjord Storage, LLC EG15-11-000 Samchully Power & Utilities 1 LLC EG15-12-000 Chief Conemaugh Power, LLC EG15-15-000 Chief Keystone Power, LLC EG15-16-000 Kay Wind, LLC EG15-17-000 Spinning Spur Wind Three, LLC EG15-18-000 Green Pastures Wind, II, Inc EG15-19-000 Briscoe Wind Farm, LLC EG15-20-000 Sierra Solar Greenworks LLC EG15-21-000 Rising Tree Wind Farm III LLC EG15-22-000 NiGen, LLC EG15-23-000 Stephens Ranch Wind Energy II, LLC EG15-24-000 Milo Wind Project, LLC EG15-25-000 Roosevelt Wind Project, LLC EG15-26-000 KMC Thermo, LLC EG15-27-000 Verso Bucksport Power LLC EG15-31-000 Verso Bucksport LLC EG15-32-000 Alterna Springerville LLC EG15-33-000 LDVF1 TEP LLC EG15-34-000 Los Vientos Windpower III, LLC EG15-35-000 Start Printed Page 14370 Enbridge Massif du Sud Wind Project GP Inc FC15-2-000 Enbridge Saint Robert Bellarmin Wind Project GP I FC15-3-000 FuelCell Energy, Ltd FC15-4-000 Take notice that during the months of January and February 2015, the status of the above-captioned entities as Exempt Wholesale Generators or Foreign Utility Companies became effective by operation of the Commission's regulations. 18 CFR 366.7(a).
Start SignatureDated: March 12, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-06205 Filed 3-18-15; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 03/19/2015
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2015-06205
- Pages:
- 14369-14370 (2 pages)
- PDF File:
- 2015-06205.pdf