2015-13411. Drawbridge Operation Regulation; Columbia River, Vancouver, WA  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Notice of deviation from drawbridge regulation.

    SUMMARY:

    The Coast Guard has issued a temporary deviation from the operating schedule that governs the Interstate 5 (I-5) Bridges across the Columbia River, mile 106.5, between Portland, Oregon, and Vancouver, Washington. The deviation is necessary to facilitate the movement of heavier than normal roadway traffic associated with the Independence Day fireworks show near the I-5 Bridges. This deviation allows the bridges to remain in the closed-to-navigation position during the event.

    DATES:

    This deviation is effective from 9 p.m. to 11:59 p.m. on July 4, 2015.

    ADDRESSES:

    The docket for this deviation, [USCG-2015-0460] is available at http://www.regulations.gov. Type the docket number in the “SEARCH” box and click “SEARCH.” Click on Open Docket Folder on the line associated with this deviation. You may also visit the Docket Management Facility in Room W12-140 on the ground floor of the Department of Transportation West Building, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    If you have questions on this temporary deviation, call or email Mr. Steven Fischer, Bridge Administrator, Thirteenth Coast Guard District; telephone 206-220-7282, email d13-pf-d13bridges@uscg.mil. If you have questions on viewing the docket, call Cheryl Collins, Program Manager, Docket Operations, telephone 202-366-9826.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The Oregon Department of Transportation has requested that the I-5 Bridges across the Columbia River remain closed to vessel traffic to facilitate heavier than normal roadway traffic volume associated with a fireworks show on July 4, 2015 near the bridges. The I-5 Bridges cross the Columbia River at mile 106.5, and provide three designated navigation channels with vertical clearances ranging from 39 to 72 feet above Columbia River Datum 0.0 while the lift spans are in the closed-to-navigation position.

    The normal operating schedule for the I-5 Bridges are in accordance with 33 CFR 117.869, which states that the draws shall open on signal except that the draws need not open 6:30 a.m. to 9 a.m. and from 2:30 p.m. to 6 p.m. Monday through Friday, excluding federal holidays.

    This deviation period is from 9 p.m. to 11:59 p.m. on July 4, 2015. The deviation allows the lift spans of the I-5 Bridges across the Columbia River, mile 106.5, to remain in the closed-to-navigation position and need not open for maritime traffic from 9 p.m. to 11:59 p.m. on July 4, 2015.

    The bridge shall operate in accordance with 33 CFR 117.869 at all other times. Waterway usage on this part of the Columbia River includes vessels ranging from commercial tug and tow vessels to recreational pleasure craft.

    Vessels able to pass through the bridge in the closed positions may do so at anytime. The bridge will be able to open for emergencies and there is no immediate alternate route for vessels to pass. The Coast Guard will also inform the users of the waterways through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so that vessels can arrange their transits to minimize any impact caused by the temporary deviation.

    In accordance with 33 CFR 117.35(e), the drawbridges must return to their regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35.

    Start Signature

    Dated: May 28, 2015.

    Steven M. Fischer,

    Bridge Administrator, Thirteenth Coast Guard District.

    End Signature End Supplemental Information

    [FR Doc. 2015-13411 Filed 6-2-15; 8:45 am]

    BILLING CODE 9110-04-P

Document Information

Effective Date:
7/4/2015
Published:
06/03/2015
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of deviation from drawbridge regulation.
Document Number:
2015-13411
Dates:
This deviation is effective from 9 p.m. to 11:59 p.m. on July 4, 2015.
Pages:
31466-31466 (1 pages)
Docket Numbers:
Docket No. USCG-2015-0460
PDF File:
2015-13411.pdf
CFR: (1)
33 CFR 117