-
Start Preamble
AGENCY:
Coast Guard, DHS.
ACTION:
Notice of deviation from drawbridge regulation.
SUMMARY:
The Coast Guard has issued a temporary deviation from the operating schedule that governs the Tower Drawbridge across the Sacramento River, mile 59.0, at Sacramento, CA. The deviation is necessary to allow the community to participate in the FroYo Run event. This deviation allows the bridge to remain in the closed-to-navigation position during the deviation period.
DATES:
This deviation is effective from 7:30 a.m. to 10 a.m. on August 20, 2016.
ADDRESSES:
The docket for this deviation, [USCG-2016-0729] is available at http://www.regulations.gov. Type the docket number in the “SEARCH” box and click “SEARCH.” Click on Open Docket Folder on the line associated with this deviation.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
If you have questions on this temporary deviation, call or email David H. Sulouff, Chief, Bridge Section, Eleventh Coast Guard District; telephone 510-437-3516, email David.H.Sulouff@uscg.mil.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
California Department of Transportation has requested a temporary change to the operation of the Tower Drawbridge, mile 59.0, over Sacramento River, at Sacramento, CA. The vertical lift bridge navigation span provides a vertical clearance of 30 feet above Mean High Water in the closed-to-navigation position. The draw operates as required by 33 CFR 117.189(a). Navigation on the waterway is commercial and recreational.
The drawspan will be secured in the closed-to-navigation position from 7:30 a.m. to 10 a.m. on August 20, 2016, to allow the community to participate in the FroYo Run event. This temporary deviation has been coordinated with the waterway users. No objections to the proposed temporary deviation were raised.
Vessels able to pass through the bridge in the closed position may do so at any time. The bridge will be able to open for emergencies and there is no immediate alternate route for vessels to pass. The Coast Guard will also inform the users of the waterway through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so that vessels can arrange their transits to minimize any impact caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35.
Start SignatureStart Printed Page 56506End Signature End Supplemental InformationDated: Aug 17, 2016.
D.H. Sulouff,
District Bridge Chief, Eleventh Coast Guard District.
[FR Doc. 2016-20019 Filed 8-19-16; 8:45 am]
BILLING CODE 9110-04-P
Document Information
- Effective Date:
- 8/20/2016
- Published:
- 08/22/2016
- Department:
- Coast Guard
- Entry Type:
- Rule
- Action:
- Notice of deviation from drawbridge regulation.
- Document Number:
- 2016-20019
- Dates:
- This deviation is effective from 7:30 a.m. to 10 a.m. on August 20, 2016.
- Pages:
- 56505-56506 (2 pages)
- Docket Numbers:
- Docket No. USCG-2016-0729
- PDF File:
- 2016-20019.pdf
- CFR: (1)
- 33 CFR 117