2017-19725. PJM Interconnection, L.L.C.; Notice of Institution of Section 206 Proceeding and Refund Effective Date
-
Start Preamble
On September 8, 2017, an order was issued in Docket No. EL17-84-000, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e (2012), instituting an investigation into the justness and reasonableness of Hudson Transmission Partners, L.L.C. (HTP) being unable to convert its Firm Transmission Withdrawal Rights to Non-Firm Transmission Withdrawal Rights.[1]
The refund effective date in Docket No. EL17-84-000, established pursuant to section 206(b) of the FPA, will be the date of publication of this notice in the Federal Register.
Any interested person desiring to be heard in Docket No. EL17-84-000 must file a notice of intervention or motion to intervene, as appropriate, with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rule 214 of the Commission's Rules of Practice and Procedure, 18 CFR 385.214, within 21 days of the date of issuance of the order.
Start SignatureDated: September 8, 2017.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
Footnotes
1. PJM Interconnection, L.L.C., 160 FERC 61,056 (2017).
Back to Citation[FR Doc. 2017-19725 Filed 9-15-17; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 09/18/2017
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2017-19725
- Pages:
- 43535-43535 (1 pages)
- Docket Numbers:
- Docket No. EL17-84-000
- PDF File:
- 2017-19725.pdf