2017-21250. Proposed Extension of Information Collection; Training Plan Regulations and Certificate of Training [OMB Control No. 1219-0009]  

  • Start Preamble

    AGENCY:

    Mine Safety and Health Administration, Labor.

    ACTION:

    Request for public comments.

    SUMMARY:

    The Department of Labor, as part of its continuing effort to reduce paperwork and respondent burden, conducts a pre-clearance consultation program to provide the general public and Federal agencies with an opportunity to comment on proposed collections of information in accordance with the Paperwork Reduction Act of 1995. This program helps to assure that requested data can be provided in the desired format, reporting burden (time and financial resources) is minimized, collection instruments are clearly understood, and the impact of collection requirements on respondents can be properly assessed. Currently, the Mine Safety and Health Administration (MSHA) is soliciting comments on the information collection for Training Plan Regulations and Certificate of Training.

    DATES:

    All comments must be received on or before December 4, 2017.

    ADDRESSES:

    Comments concerning the information collection requirements of this notice may be sent by any of the methods listed below.

    • Federal E-Rulemaking Portal: http://www.regulations.gov. Follow the on-line instructions for submitting comments for docket number MSHA-2017-0029.
    • Regular Mail: Send comments to USDOL-MSHA, Office of Standards, Regulations, and Variances, 201 12th Street South, Suite 4E401, Arlington, VA 22202-5452.
    • Hand Delivery: USDOL-Mine Safety and Health Administration, 201 12th Street South, Suite 4E401, Arlington, VA 22202-5452. Sign in at the receptionist's desk on the 4th floor via the East elevator.
    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Sheila McConnell, Director, Office of Standards, Regulations, and Variances, MSHA, at MSHA.information.collections@dol.gov (email); (202) 693-9440 (voice); or (202) 693-9441 (facsimile).

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    I. Background

    Section 103(h) of the Federal Mine Safety and Health Act of 1977 (Mine Act), 30 U.S.C. 813(h), authorizes MSHA to collect information necessary to carry out its duty in protecting the safety and health of miners. Further, section 101(a) of the Mine Act, 30 U.S.C. 811, authorizes the Secretary of Labor Start Printed Page 46092(Secretary) to develop, promulgate, and revise as may be appropriate, improved mandatory health or safety standards for the protection of life and prevention of injuries in coal or other mines.

    The Mine Act, as amended, 30 U.S.C. 801 et seq., recognizes that education and training is an important element of federal efforts to make the nation's mines safe. Title 30, CFR Sections 48.3 and 48.23 require training plans for underground and surface mines, respectively. The standards are intended to assure that miners will be effectively trained in matters affecting their health and safety, with the ultimate goal being the reduction of injuries and illness in the nation's mines. Training plans are required to be submitted for approval to the MSHA District Manager for the area in which the mine is located. Plans must contain the company name, mine name, and MSHA identification number of the mine; the name and position of the person designated by the operator who is responsible for health and safety training at the mine; a list of MSHA approved instructors with whom the operator proposes to make arrangements to teach the courses and the courses each instructor is qualified to teach; the location where training will be given for each course; a description of the teaching methods and the course materials which are to be used in training; the approximate number of miners employed at the mine and the maximum number who will attend each session of training; the predicted time or periods of time when regularly scheduled refresher training will be given including the titles of courses to be taught, the total number of instruction hours for each course, and the predicted time and length of each session of training; and for new task training, a complete list of task assignments, the titles of personnel conducting the training, the outline of training procedures used, and the evaluation procedures used to determine the effectiveness of the training. Records of training are required for underground and surface mines under sections 48.9 and 48.29.

    II. Desired Focus of Comments

    MSHA is soliciting comments concerning the proposed information collection related to Training Plan Regulations and Certificate of Training. MSHA is particularly interested in comments that:

    • Evaluate whether the collection of information is necessary for the proper performance of the functions of the agency, including whether the information has practical utility;
    • Evaluate the accuracy of MSHA's estimate of the burden of the collection of information, including the validity of the methodology and assumptions used;
    • Suggest methods to enhance the quality, utility, and clarity of the information to be collected; and
    • Minimize the burden of the collection of information on those who are to respond, including through the use of appropriate automated, electronic, mechanical, or other technological collection techniques or other forms of information technology, e.g., permitting electronic submission of responses.

    The information collection request will be available on http://www.regulations.gov. MSHA cautions the commenter against providing any information in the submission that should not be publicly disclosed. Full comments, including personal information provided, will be made available on www.regulations.gov and www.reginfo.gov.

    The public may also examine publicly available documents at USDOL-Mine Safety and Health Administration, 201 12th South, Suite 4E401, Arlington, VA 22202-5452. Sign in at the receptionist's desk on the 4th floor via the East elevator.

    Questions about the information collection requirements may be directed to the person listed in the FOR FURTHER INFORMATION section of this notice.

    III. Current Actions

    This request for collection of information contains provisions for Training Plan Regulations and Certificate of Training. MSHA has updated the data with respect to the number of respondents, responses, burden hours, and burden costs supporting this information collection request.

    Type of Review: Extension, without change, of a currently approved collection.

    Agency: Mine Safety and Health Administration.

    OMB Number: 1219-0009.

    Affected Public: Business or other for-profit.

    Number of Respondents: 1,526.

    Frequency: On occasion.

    Number of Responses: 123,186.

    Annual Burden Hours: 13,964 hours.

    Annual Respondent or Recordkeeper Cost: $371,118.

    MSHA Forms: MSHA Form 5000-23, Certificate of Training.

    Comments submitted in response to this notice will be summarized and included in the request for Office of Management and Budget approval of the information collection request; they will also become a matter of public record.

    Start Signature

    Sheila McConnell,

    Certifying Officer.

    End Signature End Supplemental Information

    [FR Doc. 2017-21250 Filed 10-2-17; 8:45 am]

    BILLING CODE 4510-43-P

Document Information

Published:
10/03/2017
Department:
Mine Safety and Health Administration
Entry Type:
Notice
Action:
Request for public comments.
Document Number:
2017-21250
Dates:
All comments must be received on or before December 4, 2017.
Pages:
46091-46092 (2 pages)
PDF File:
2017-21250.pdf
Supporting Documents:
» Supporting Statement for Training Plans and Records of Training, for Underground Miners and Miners Working at Surface Mines and Surface Areas of Underground Mines