Start Preamble
Take notice that on November 14, 2018, Midship Pipeline Company, LLC (Midship), 700 Milam Street, Suite 1900, Houston, Texas 77002, filed an application pursuant to section 7(c) of the Natural Gas Act and Parts 157 and 284 of the Commission's regulations requesting authorization to amend its Certificate of Public Convenience and Necessity issued on August 13, 2018, in Docket No. CP17-458-000 [1] in order to allow for a minor re-route on its Midcontinent Supply Header Interstate Pipeline Project (MIDSHIP Project). Specifically, Midship requests an estimated 0.8-mile pipeline reroute in Bryan County, Oklahoma, located approximately 400-feet southwest of the certificated pipeline route to avoid a sensitive feature and mitigate stakeholder concerns. Midship states that the proposed route modification would not result in any changes to the estimated project costs of the MIDSHIP Project and that no shippers would be adversely affected, all as more fully set forth in the application, which is on file with the Commission and open to public inspection.
The filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's website web at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208-3676 or TYY, (202) 502-8659.
Any questions regarding the proposed amendment should be directed to Karri Mahmoud, Director, Regulatory Project Development, 700 Milam Street, Suite 1900, Houston, Texas 77002, by telephone at (713) 375-5000, or by email at karri.mahmoud@cheniere.com.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9, within 90 days of this Notice, the Commission staff will either: Complete its environmental analysis (EA) and place it into the Commission's public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff's issuance of the EA for this proposal. The filing of the EA in the Commission's public record for this proceeding or the issuance of a Notice of Schedule will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff's EA.
There are two ways to become involved in the Commission's review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below, file with the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 3 copies of filings made with the Commission and must provide a copy to the applicant and to every other party in Start Printed Page 61626the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding.
However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission's rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest.
Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission's environmental mailing list and will be notified of any meetings associated with the Commission's environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission and will not have the right to seek court review of the Commission's final order.
As of the February 27, 2018 date of the Commission's order in Docket No. CP16-4-001, the Commission will apply its revised practice concerning out-of-time motions to intervene in any new Natural Gas Act section 3 or section 7 proceeding.[2] Persons desiring to become a party to a certificate proceeding are to intervene in a timely manner. If seeking to intervene out-of-time, the movant is required to “show good cause why the time limitation should be waived,” and should provide justification by reference to factors set forth in Rule 214(d)(1) of the Commission's Rules and Regulations.[3]
The Commission strongly encourages electronic filings of comments, protests, and interventions in lieu of paper using the “eFiling” link at http://www.ferc.gov. Persons unable to file electronically should submit an original and 3 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426.
Comment Date: 5:00 p.m. Eastern Time on December 14, 2018.
Start SignatureDated: November 23, 2018.
Kimberly D. Bose,
Secretary.
Footnotes
1. Midship Pipeline Company, LLC, 164 FERC ¶ 61,103 (2018).
Back to Citation2. Tennessee Gas Pipeline Company, L.L.C., 162 FERC ¶ 61,167 at ¶ 50 (2018).
Back to Citation[FR Doc. 2018-25985 Filed 11-29-18; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 11/30/2018
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2018-25985
- Dates:
- 5:00 p.m. Eastern Time on December 14, 2018.
- Pages:
- 61625-61626 (2 pages)
- Docket Numbers:
- Docket No. CP19-17-000
- PDF File:
- 2018-25985.pdf