2019-10695. Standards for Business Practices and Communication Protocols for Public Utilities  

  • Start Preamble

    AGENCY:

    Federal Energy Regulatory Commission, DOE.

    ACTION:

    Notice of proposed rulemaking.

    SUMMARY:

    The Federal Energy Regulatory Commission (Commission) proposes to amend its regulations to incorporate by reference, with certain enumerated exceptions, the latest version (Version 003.2) of certain Standards for Business Practices and Communication Protocols for Public Utilities adopted by the Wholesale Electric Quadrant (WEQ) of the North American Energy Standards Board (NAESB). The Commission proposes to use this latest version instead of WEQ Version 003.1, which was the subject of an earlier notice of proposed rulemaking. The revisions made by NAESB in this version of the standards are designed to aid public utilities with the consistent and uniform implementation of requirements promulgated by the Commission as part of the pro forma Open Access Transmission Tariff.

    DATES:

    Comments are due July 23, 2019.

    ADDRESSES:

    Comments, identified by Docket No. RM05-5-027, may be filed electronically at http://www.ferc.gov in acceptable native applications and print-to-PDF, but not in scanned or picture format. For those unable to file electronically, comments may be filed by mail or hand-delivery to: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE, Washington, DC 20426. The Comment Procedures Section of this document contains more detailed filing procedures.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Michael P. Lee (technical issues), Office of Energy Policy and Innovation, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, (202) 502-6548

    Michael A. Chase (legal issues), Office of the General Counsel, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426, (202) 502-6205

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Table of Contents

    Paragraph Nos.
    I. Overview1
    II. Background3
    III. Discussion11
    A. Revisions and Modifications to Earlier Versions of Standards Made in the WEQ Version 003.2 Standards12
    B. Treatment of Requests for Redirects14
    1. Background14
    2. WEQ Standards in Versions 003.1 and 003.216
    3. Request for Comments in WEQ Version 003.1 NOPR17
    4. Comments on Redirect Filed in Response to WEQ Version 003.1 NOPR18
    5. Discussion27
    IV. Notice of Use of Voluntary Consensus Standards28
    V. Incorporation by Reference29
    VI. Information Collection Statement49
    VII. Environmental Analysis56
    VIII. Regulatory Flexibility Act Certification57
    IX. Comment Procedures61
    X. Document Availability65
    Start Printed Page 24051

    I. Overview

    1. The Commission has issued a notice of proposed rulemaking [1] regarding the Version 003.1 business practice standards (WEQ Version 003.1 Standards) adopted by the Wholesale Electric Quadrant (WEQ) of the North American Energy Standards Board (NAESB) and has received comments on that NOPR in Docket No. RM05-5-025; however, the Commission has not taken any final action on those standards. NAESB has now adopted its Version 003.2 WEQ Business Practice Standards (WEQ Version 003.2 Standards).[2] The WEQ Version 003.2 Standards include, in their entirety, the WEQ Version 003.1 Standards, with the addition of certain revisions and corrections. The NAESB WEQ Version 003.2 Report concludes from this that, as “WEQ Version 003.2 includes the entirety of modifications submitted to the Commission in WEQ Version 003.1, action on the previously submitted version is unnecessary should the Commission choose.” [3] We find this suggestion has merit and, thus, in the interest of efficiency we will issue this notice of proposed rulemaking inviting comment on the revisions and corrections NAESB made in the WEQ Version 003.2 Standards and then take final action on the WEQ Version 003.2 WEQ Standards, which include the revisions made by NAESB in the WEQ Version 003.1 Standards and carried forward as part of the WEQ Version 003.2 Standards. Comments already filed on the revisions made by NAESB in the WEQ Version 003.1 Standards will be given full consideration and need not be replicated in response to this NOPR.

    2. Further, as announced in the WEQ Version 003.1 NOPR, we will address separately NAESB's WEQ-023 Modeling Business Practice Standards, which concern technical issues affecting the calculation of Available Transfer Capability for wholesale electric transmission services.[4] We also have issued a separate notice of proposed rulemaking proposing to retire and remove the incorporation by reference of the WEQ-006 Time Error Correction Business Practice Standards.[5] Thus, we are not proposing any actions on those topics here.

    II. Background

    3. NAESB is a non-profit standards development organization established in late 2001 (as the successor to the Gas Industry Standards Board (GISB), which was established in 1994) and serves as an industry forum for the development of business practice standards and communication protocols for the wholesale and retail natural gas and electricity industry sectors. Since 1995, NAESB, and its predecessor GISB, have been accredited members of the American National Standards Institute (ANSI), complying with ANSI's requirements that its standards reflect a consensus of the affected industries.[6]

    4. NAESB's standards include business practices intended to standardize and streamline the transactional processes of the natural gas and electric industries, as well as communication protocols and related standards designed to improve the efficiency of communication within each industry. NAESB supports all three quadrants of the gas and electric industries—wholesale gas, wholesale electric, and retail markets quadrant.[7] All participants in the gas and electric industries are eligible to join NAESB and participate in standards development.

    5. NAESB develops its standards under a consensus process so that the standards draw support from a wide range of industry members. NAESB's procedures are designed to ensure that all persons choosing to participate can have input into the development of a standard, regardless of whether they are members of NAESB, and each standard NAESB adopts is supported by a consensus of the relevant industry segments. Standards that fail to gain consensus support are not adopted. NAESB's consistent practice has been to submit a report to the Commission after it has made revisions to existing business practice standards or has developed and adopted new business practice standards. NAESB's standards are voluntary standards, which become mandatory for public utilities upon incorporation by reference by the Commission.

    6. On July 21, 2016, the Commission issued a notice of proposed rulemaking in Docket No. RM05-5-025 (WEQ Version 003.1 NOPR) that proposed to incorporate by reference Version 003.1 of certain Standards for Business Practices and Communication Protocols for Public Utilities adopted by the Wholesale Electric Quadrant of the North American Energy Standards Board. In response to the WEQ Version 003.1 NOPR, comments were filed by eight commenters.[8] A number of comments expressed general support for the Commission's proposals in the WEQ Version 003.1 NOPR and no comments were received opposing the basic direction of the NOPR, although comments did make suggestions on several specific details of the NOPR proposals. The issue that elicited the most comments was on the treatment of requests for redirects.

    7. On December 8, 2017, NAESB filed a reported with the Commission informing the Commission that it had adopted and published the WEQ Version 003.2 Business Practice Standards for Public Utilities. It reports that the WEQ Version 003.2 Standards include newly created standards as well as modifications to existing standards developed through the NAESB standards development or minor correction processes. It further reports that these standards build upon WEQ Version 003.1 Standards, filed with the Commission on October 26, 2015, but not yet the subject of final Commission action. As the WEQ Version 003.2 Standards include all the modifications submitted to the Commission in the WEQ Version 003.1 Standards, NAESB suggests that action on the previously submitted version is unnecessary should the Commission choose.

    8. NAESB's WEQ Version 003.2 Business Practice Standards include modifications, reservations, and/or additions to the following set of existing standards:

    Start Printed Page 24052
    WEQBusiness Practice Standards
    000Abbreviations, Acronyms, and Definition of Terms
    001Open Access Same-Time Information System (OASIS)
    002OASIS Standards and Communication Protocols (S&CP)
    003OASIS S&CP Data Dictionaries
    004Coordinate Interchange
    006Manual Time Error Corrections
    008Transmission Loading Relief (TLR)—Eastern Interconnection Business Practice Standards
    013OASIS Implementation Guide
    015Measurement and Verification of Wholesale Electricity Demand Response Business Practice Standards
    018Specifications for Wholesale Standard Demand Response Signals Business Practice Standards
    020Smart Grid Standards Data Elements Table Business Practice Standards
    022Electric Industry Registry (EIR) Business Practice Standards

    9. Over the course of years, the OASIS Suite of Standards has been revised several times to support directives contained in Order Nos. 888 [9] and 890.[10] The WEQ Version 003.2 Standards include modifications and reservations to existing standards and newly developed standards made to support the short-term preemption process (WEQ-001-25) and the merger of like transmission reservations (WEQ-001-24) prescribed in the OASIS Suite of Standards.[11]

    10. The WEQ Version 003.2 Standards also included other changes that were made to support consistency with the North American Electric Reliability Corporation (NERC) Reliability Standards. NAESB made these changes as a result of direct coordination with NERC on issues regarding dynamic tagging and pseudo-ties, and the finalization of the transition of the industry registry tool from NERC to NAESB. NAESB also made additional changes to seven suites of the WEQ Business Practices to ensure the standards accurately reflect revisions to the NERC Reliability Standards. In addition, NAESB made changes to support market operator functionalities to support the full use of the market operator as a separate role within the EIR, a NAESB managed industry tool, and on electronic tags (e-Tags). NAESB also made changes to support consistency by revising certain Abbreviations, Acronyms, and Definitions of Terms in WEQ-000. Finally, the standards were revised to make minor corrections to six standards.

    III. Discussion

    11. As discussed below, with certain enumerated exceptions, we propose to incorporate by reference (into the Commission's regulations at 18 CFR 38.1(b) (2018)) the NAESB WEQ Version 003.2 Business Practice Standards.[12] The WEQ Version 003.2 Business Practice Standards will replace the WEQ Version 003 Business Practice Standards currently incorporated by reference into the Commission's regulations. As explained above, comments have already been filed on the NAESB WEQ Version 003.1 Business Practice Standards and we will fully take those comments into account when we consider our determination on the WEQ Version 003.2 Standards. Thus, parties have no need to replicate the comments on the WEQ Version 003.1 Standards in response to this NOPR. The standards addressed in this NOPR are consistent with the Commission's findings in Order No. 676-H [13] and do not appear to be inconsistent with any Commission directives or findings in other orders.

    A. Revisions and Modifications to Earlier Versions of Standards Made in the WEQ Version 003.2 Standards

    12. As explained above, the WEQ Version 003.2 Business Practice Standards include:

    • Modifications and reservations to existing standards and newly developed standards to support the short-term preemption process and the merger of like transmission reservations;
    • Changes to support consistency with NERC Reliability Standards;
    • Changes to support market operator functionalities;
    • Changes to support consistency in the use of abbreviations, acronyms, and definitions in WEQ-000; and
    • Minor corrections to six standards.

    13. The Commission specifically invites interested persons to submit comments on all these revisions and changes from prior versions of the WEQ Business Practice Standards and on whether the Commission should incorporate by reference into its regulations, as enforceable mandatory requirements, the latest version of these standards (i.e., the WEQ Version 003.2 Business Practice Standards).

    B. Treatment of Requests for Redirects

    1. Background

    14. In Dynegy Power Marketing, Inc.,[14] the Commission established its policy on a customer's right to keep its contractual rights to firm transmission service it had reserved while the customer's request for a redirect was “pending” as required in section 22.2 of Start Printed Page 24053the Pro Forma OATT.[15] In Dynegy, the Commission held that “unconditional acceptance” would not terminate a transmission customer's right to its original path while the redirect request still can be preempted by a competing reservation up to the following conditional reservation deadline in section 13.2 of the Pro Forma OATT. The Commission clarified that a transmission customer submitting a redirect request does not lose its rights to its original path until the redirect request satisfies all of the following criteria: (1) It is accepted by the transmission provider; (2) it is confirmed by the transmission customer; and (3) it passes the conditional reservation deadline under section 13.2 of the transmission provider's OATT.[16] The Commission's concern was that a redirecting customer whose redirect request had been confirmed under step 2 nonetheless could lose its rights to the original parent path if the transmission provider later preempted the requested redirect in favor of a competing request prior to step 3.[17]

    15. In its filing of version 3.0, NAESB proposed WEQ Standards 001-9.5 and 001-10.5. Under these standards, a customer would lose its parent transmission rights when the transmission operator confirmed the redirect request even though the customer would still be at risk for preemption by a competing transmission request. In Order No. 676-H, in consideration of the comments, the Commission declined to incorporate WEQ Version 003.1 Standards 001-9.5 and 001-10.5, stating that the standards are inconsistent with the Commission's redirect policy in Dynegy.[18] Additionally, the Commission requested that NAESB revisit WEQ Version 003.1 Standards 001-9.5 and 001-10.5 and any other affected standards. NAESB's revisions contained in the Version 003.1 standards purport to reflect this effort.

    2. WEQ Standards in Versions 003.1 and 003.2

    16. Version 003.1 of the WEQ-001-9 business practice standards (repeated again in version 003.2) attempts to implement a standard that is consistent with the Commission's policy on redirects as outlined in Dynegy. Proposed Version 3.1 WEQ-001-9.5.4 states

    The Transmission Provider shall ensure the Transmission Customer's rights to take firm PTP on the original unconditional Parent Reservation's reserved POR and POD are preserved until such time that the confirmed Redirect on a firm basis has reached its conditional reservation deadline as defined in Section 13.2 of the pro forma tariff.

    The preamble to WEQ Version 003.1 Standard 001-9, however, contains a clause that might be interpreted to permit a transmission operator to establish a different policy if it posts that information as a “Transmission Provider specific business practice.” [19] WEQ Version 003.1 Standard 001-10.5 completes NAESB's proposed implementation of the Commission's Dynegy redirect policy by requiring revisions to Uncommitted Capacity of the Parent Reservation. WEQ Version 003.1 Standard 001-10.5 requires the Transmission Provider to reduce the amount of the redirected capacity granted for the time period of that Redirect upon confirmation by the Transmission Customer of the request to Redirect on a non-firm basis.

    3. Request for Comments in WEQ Version 003.1 NOPR

    17. In the NOPR pertaining to WEQ 003.1, we invited comment on whether the Commission should extend the Dynegy policy to both conditional parent reservations for firm transmission service and non-firm transmission service.[20] The Commission explained that the negative effects associated with the potential loss of a customer's parent path when the parent reservation is conditional and subject to competition is arguably less compelling than when the parent reservation is unconditional.[21] To aid the Commission's consideration of this issue, the Commission referenced four redirect issues in the NOPR on which NAESB stakeholders were unable to reach consensus, and invited comments on whether the Commission should adopt regulations governing the business practices to be followed for requests for redirects from conditional parent reservations for short-term firm transmission service and for non-firm transmission service proposed—and invited comments on this proposal. These issues are: (1) The treatment of a firm redirect for transmission service following the preemption of the conditional parent reservation; (2) the circumstances under which a firm redirect for transmission service may return to the conditional parent reservation; (3) the number of subsequent firm redirects for transmission service that can stem from the original firm redirect for transmission service; and (4) the proper treatment of requests to redirect requests for non-firm transmission service.[22]

    4. Comments on Redirect Filed in Response to WEQ Version 003.1 NOPR

    18. Virtually all the comments received on this subject oppose the option of extending the Dynegy redirect policy to either conditional parent reservations for short-term firm transmission service or non-firm transmission service.[23] As a result, most commenters express support for NAESB's proposed redirect standards for unconditional parent reservations.[24] Most commenters did not explicitly support the proposed language provided Start Printed Page 24054within the WEQ-001-9 preamble that would also allow transmission providers the option of implementing alternative practices for redirects from conditional reservations.[25] However, some commenters state that they recommend or could support a future NAESB proposal for a separate policy to provide transmission customers with the ability to redirect from conditional parent reservations.[26]

    19. Various commenters note that, under the Dynegy redirect policy, the transmission provider must hold Available Transfer Capability (ATC) for the original firm reservation on the original path and simultaneously hold ATC on the redirect reservation's path until the redirect reaches the conditional deadline, and, at such time, capacity on the original (parent) path may then be released.[27] Several commenters contend that this allows the transmission customer to hold priority of service options on two or more transmission paths at the same time.[28] Joint Commenters ask the Commission if there may be benefits to revisiting specifics of the Dynegy/Entergy orders since the requirement that a redirect's parent passes the conditional reservation deadline sacrifices system efficiency.[29]

    20. Several commenters oppose the proposal to extend the Dynegy policy beyond an application to unconditional parent reservations. These commenters point out that prior to the conditional reservation deadline, when the parent reservation is still conditional and subject to competition, there is no guarantee that firm service will be provided to the transmission customer on either the original transmission path or the requested redirect path since the reservation remains subject to competition until the conditional period expires.[30] Commenters observe that the transmission customer's expectation as to the certainty of service is different in the conditional and unconditional cases.[31] Edison Institute references sections of the Commission's pro forma OATT to support its conclusion that a firm capacity reservation under which the transmission customer is already taking service must already exist, and a reservation for service must be unconditional before it may be redirected.[32] Bonneville notes that a customer with a conditional parental service has no reasonable expectation of service, since a later-queued, higher-priority request may preempt or compete with that customer's conditional parent reservation, and since this expectation of service is different from a customer's expectation of service with an unconditional firm reservation, Bonneville argues it is inappropriate to extend the protections afforded by Dynegy to unconditional parent reservations.[33]

    21. Commenters also contend that there may be many difficulties in administering scenarios with multiple conditional, confirmed reservations consuming more transmission capacity than available, since capacity would be retained on both the parent path and all the redirected paths.[34] Some commenters advise that, if transmission customers are able to redirect from conditional parent reservations, it could result in potentially troublesome administrative, billing, and liability issues.[35]

    22. Specifically, Joint Commenters and Southern argue that a transmission customer should only be permitted to redirect transmission service from unconditional parent reservations.[36] However, Edison Institute would also allow individual transmission providers the option to also permit redirects from conditional parent reservations by moving firm capacity to the redirect path upon confirmation.[37] Snohomish/Tacoma suggests that the Commission should either: (1) Allow individual transmission providers to craft specific tariff provisions for how redirects from conditional parent reservations will be addressed; or (2) explicitly not apply the Dynegy redirect policy, nor any other restriction on redirects from conditional parent reservations.[38] OATI comments that it is generally not in favor of adopting standards that allow for options to implement transmission provider alternative practices to the NAESB standards.[39]

    23. OATI notes that, while it supports the application of Dynegy to redirects on a firm basis where the parent reservation is confirmed but still within the conditional reservation period (prior to the conditional reservation deadline),[40] it could also support a NAESB standard where the capacity held on the conditional firm parent reservation is released immediately and lost on the parent path upon confirmation of the redirect on a firm basis.[41] Other commenters agree and prefer such a NAESB standard for conditional parent reservations.

    24. With respect to the Commission implementing a policy where a transmission customer redirects from a conditional parent reservation and the transmission customer loses the rights to the parent reservation once the redirect is confirmed, Bonneville advises that transmission providers will have a straightforward solution that is implementable and that can leverage technical capabilities that currently exist in most of the industry, and will not be burdened with accounting for capacity on multiple conditional paths.[42]

    25. As to requests for redirects of requests for non-firm transmission service, all the commenters who addressed this issue oppose extending the Dynegy redirect policy to non-firm transmission service. Commenters note that the Commission's pro forma OATT only permits transmission customers taking firm point-to-point service to make modifications to points of receipt (POR) and points of delivery (POD), and the OATT does not state transmission customers may modify PORs and PODs on a non-firm basis.[43] OATI states that non-firm (secondary) redirect is the lowest priority service under the OATT and would be subject to preemption or interruption at any time to process either a request to reserve or schedule an existing reservation for either firm or non-firm transmission service.[44]

    26. Commenters also believe that a request to redirect firm transmission service on a non-firm basis should not be allowed or should be limited to be from an unconditional, firm parent reservation.[45] Edison Institute advises that the potential for gaming, the impact on queue positions and processing, and the problem of undertaking ATC/AFC (Available Flowgate Capability) calculations, outweigh any potential benefits given that a customer can just as easily submit a new request for non-firm transmission service with a modified POR and/or POD.[46] Commenters also state that it is unnecessary to adopt changes to these Start Printed Page 24055standards, since a customer can relinquish a capacity reservation associated with a non-firm redirect back to the parent reservation.[47]

    5. Discussion

    27. The changes to NAESB WEQ Version 003.1 Standards 001-9.5.4 and 001-10.5 appear consistent with the policy established in Dynegy, and we propose to incorporate these standards by reference. We agree with the majority of commenters that the Dynegy policy providing for retention of parent rights when the transmission owner confirms a redirect request (but while the request remains conditional) applies only when the parent reservation is firm and unconditional and, hence, should not apply to conditional parent reservations or non-firm transmission service. However, we propose to reject the preamble to WEQ 001-9 because it leaves the implication that a transmission operator could adopt a “Transmission Provider specific Business Practice” that is at odds with the reason for establishing common business practices standards under the NAESB standards development process. We therefore disagree with Edison Institute and Snohomish/Tacoma who argue that the Commission should allow redirects from a conditional parent reservation on a case-by-case basis as antithetical to the NAESB standards development process. The NAESB standards development process is designed to provide for uniform methods of doing business with different transmission providers. Business transactions can involve a number of different transmission providers and establishing a uniform set of procedures and communication protocols help make such transactions more efficient and facilitates the ability to participate in multiple markets.

    IV. Notice of Use of Voluntary Consensus Standards

    28. Office of Management and Budget Circular A 119 (section 11) (February 10, 1998) provides that Federal Agencies should publish a request for comment in a NOPR when the agency is seeking to issue or revise a regulation proposing to adopt a voluntary consensus standard or a government-unique standard. In this NOPR, the Commission is proposing to incorporate by reference into its regulations voluntary consensus business practice standards developed by the WEQ of NAESB.

    V. Incorporation by Reference

    29. The Office of the Federal Register requires agencies incorporating material by reference to discuss, in the preamble of the proposed rule, the ways that the materials it incorporates by reference are reasonably available to interested parties and how interested parties can obtain the materials.[48] The regulations also require agencies to summarize in the preamble of the proposed rule the material it incorporates by reference. The standards we are proposing to incorporate by reference in this NOPR consist of fourteen suites of business practice standards applicable to public utilities that own, operate, or control facilities used for the transmission of electric energy in interstate commerce or for the sale of electric energy at wholesale in interstate commerce and any non-public utility that seeks voluntary compliance with jurisdictional transmission tariff reciprocity conditions. These can be summarized as follows:

    30. The WEQ-000 Abbreviations, Acronyms, and Definition of Terms Business Practice Standards provide a single location for all abbreviations, acronyms, and defined terms referenced in the WEQ Business Practice Standards. These standards provide common nomenclature for terms within the wholesale electric industry, thereby reducing confusion and opportunities for misinterpretation or misunderstandings among industry participants.

    31. The OASIS suite of business practice standards (WEQ-001 Open Access Same-Time Information Systems (OASIS), WEQ-002 OASIS Standards and Communication Protocols, WEQ-003 OASIS Data Dictionary, and WEQ-013 OASIS Implementation Guide) support the FERC posting and reporting requirements that provide information about each transmission provider's performance of its pro forma OATT. The OASIS system is used for scheduling transmission on the bulk electric power grid, comprises the computer systems and associated communications facilities that public utilities are required to provide for the purpose of making available to all transmission users comparable interactions, and provides transmission service information and any back-end supporting systems or user procedures that collectively perform the transaction processing functions for handling requests on OASIS. These standards establish business practices and communication protocols that provide for consistent implementation across OASIS sites as well as consistent methods for posting to OASIS.

    32. The WEQ-001 OASIS Business Practice Standards define the general and specific transaction processing requirements and related business processes required for OASIS. The standards detail requirements related to standard terminology for transmission and ancillary services, attribute values defining transmission service class and type, ancillary and other services definitions, OASIS registration procedures, procurement of ancillary and other services, path naming, next hour market service, identical transmission service requests, redirects, resales, transfers, OASIS postings, procedures for addressing ATC or AFC methodology questions, rollover rights, conditional curtailment option reservations, auditing usage of Capacity Benefit Margin, coordination of requests for service across multiple transmission systems, consolidation, preemption and right-of-first refusal process, and Network Integration Transmission Service (NITS) requests.

    33. The WEQ-002 OASIS Standards and Communication Protocols Business Practice Standards define the technical standards for OASIS. These standards detail network architecture requirements, information access requirements, OASIS and point-to-point interface requirements, implementation, and NITS interface requirements.

    34. The WEQ-003 OASIS Data Dictionary Business Practice Standards define the data element specifications for OASIS.

    35. The WEQ-004 Coordinate Interchange Business Practice Standards define the commercial processes necessary to facilitate interchange transactions via Request for Interchange (RFI) and specify the arrangements and data to be communicated by the entity responsible for authorizing the implementation of such transactions (the entities responsible for balancing load and generation).

    36. The WEQ-005 Area Control Error (ACE) Equation Special Cases Business Practice Standards define commercial based requirements regarding the obligations of a balancing authority to manage the difference between scheduled and actual electrical generation within its control area. Each balancing authority manages its ACE in accordance with the NERC Reliability Standards. These standards detail requirements for jointly owned utilities, supplemental regulation service, and load or generation transfer by telemetry.

    37. The WEQ-006 Manual Time Error Correction Business Practice Standards Start Printed Page 24056define the commercial based procedures to be used for reducing time error to within acceptable limits of true time. These standards have subsequently been marked reserved by NAESB.[49]

    38. The WEQ-007 Inadvertent Interchange Payback Business Practice Standards define the methods in which inadvertent energy is paid back, mitigating the potential for financial gain through the misuse of paybacks for inadvertent interchange. Inadvertent interchange is interchange that occurs when a balancing authority cannot fully balance generation and load within its area. The standards allow for the repayment of any imbalances through bilateral in-kind payback, unilateral in-kind payback, or other methods as agreed to.

    39. The WEQ-008 Transmission Loading Relief—Eastern Interconnection Business Practice Standards define the business practices for cutting transmission service during a TLR event. These standards detail requirements for the use of interconnection-wide TLR procedures, interchange transaction priorities for use with interconnection-wide TLR procedures, and the Eastern Interconnection procedure for physical curtailment of interchange transactions.

    40. The WEQ-011 Gas/Electric Coordination Business Practice Standards define communication protocols intended to improve coordination between the gas and electric industries in daily operational communications between transportation service providers and gas-fired power plants. The standards include requirements for communicating anticipated power generation fuel for the upcoming day as well as any operating problems that might hinder gas-fired power plants from receiving contractual gas quantities.

    41. The WEQ-012 Public Key Infrastructure (PKI) Business Practice Standards establish the cybersecurity framework for parties partaking in transactions via a transmission provider's OASIS or e-Tagging system. The NAESB PKI framework secure wholesale electric market electronic commercial communications via encryption of data and the electronic authentication of parties to a transaction through the use of a digital certificate issued by a NAESB certified certificate authority. The standards define the requirements for parties utilizing the digital certificates issued by the NAESB certificate authorities.

    42. The WEQ-013 OASIS Implementation Guide Business Practice Standards detail the implementation of the OASIS Business Practice Standards. The standards detail requirements related to point-to-point OASIS transaction processing, OASIS template implementation, preemption and right-of-first-refusal processing, NITS application and modification of service processing, and secondary network transmission service.

    43. The WEQ-015 Measurement and Verification of Wholesale Electricity Demand Response Business Practice Standards define a common framework for transparency, consistency, and accountability applicable to the measurement and verification of wholesale electric market demand response practices. The standards describe performance evaluation methodology and criteria for the use of equipment, technology, and procedures to quantify the demand reduction value—the measurement of reduced electrical usage by a demand resource.

    44. The WEQ-021 Measurement and Verification of Energy Efficiency Products Business Practice Standards define a common framework for transparency, consistency, and accountability applicable to the measurement and verification of wholesale electric market energy efficiency practices. The standards establish energy efficiency measurement and verification criteria and define requirements for energy efficiency resource providers for the measurement and verification of energy efficiency products and services offered in the wholesale electric markets.

    45. The WEQ-022 EIR Business Practice Standards define the business requirements for entities utilizing the NAESB managed EIR, a wholesale electric industry tool that serves as the central repository for information needed in the scheduling of transmission through electronic transactions. The standards describe the roles within EIR, registration requirements, and cybersecurity.

    46. In addition, NAESB has adopted an additional eight suites of standards that, consistent with our past decisions, we are not proposing to incorporate by reference.[50] Additionally, as mentioned above, we are addressing NAESB's WEQ-023 ATC Modeling Standards as well NAESB's WEQ-006 Manual Time Error Correction Standards in separate rulemakings.

    47. Our regulations provide that copies of the standards incorporated by reference may be obtained from the North American Energy Standards Board, 801 Travis Street, Suite 1675, Houston, TX 77002, Phone: (713) 356-0060. NAESB's website is located at http://www.naesb.org/​. Copies of the standards may be inspected at the Federal Energy Regulatory Commission, Public Reference and Files Maintenance Branch, 888 First Street NE, Washington, DC 20426, Phone: (202) 502-8371, http://www.ferc.gov.[51]

    48. NAESB is a private consensus standards developer that develops voluntary wholesale and retail standards related to the energy industry. The procedures used by NAESB make its standards reasonably available to those affected by the Commission regulations, which generally is comprised of entities that have the means to acquire the information they need to effectively participate in Commission proceedings.[52] NAESB provides a free electronic read-only version of the standards for a three business day period or, in the case of a regulatory comment period, through the end of the comment period.[53] Participants can join NAESB, for an Start Printed Page 24057annual membership cost of $7,500, which entitles them to full participation in NAESB and enables them to obtain these standards at no additional cost.[54] Non-members may obtain a complete set of Standards Manuals, Booklets, and Contracts on CD for $2,000 and the Individual Standards Manual or Booklets for each standard by email for $250 per manual or booklet.[55] In addition, NAESB considers requests for waivers of the charges on a case by case basis based on need.

    VI. Information Collection Statement

    49. The collection of information contained in this proposed rule is subject to review by the Office of Management and Budget (OMB) under section 3507(d) of the Paperwork Reduction Act of 1995, 44 U.S.C. 3507(d).[56] OMB's regulations require approval of certain information collection requirements imposed by agency rules.[57] Upon approval of a collection(s) of information, OMB will assign an OMB control number and an expiration date. Respondents subject to the filing requirements of this rule will not be penalized for failing to respond to these collections of information unless the collections of information display a valid OMB control number.

    50. The Commission solicits comments on the Commission's need for this information, whether the information will have practical utility, the accuracy of the provided burden estimates, ways to enhance the quality, utility, and clarity of the information to be collected, and any suggested methods for minimizing respondents' burden, including the use of automated information techniques.

    51. The following estimates for burden and cost [58] are based on the projected costs for the industry to implement the new and revised business practice standards adopted by NAESB and proposed to be incorporated by reference in this NOPR.

    Revisions in NOPR in RM05-5-027

    Number of respondentsAnnual number of responses per respondentTotal number of responsesAverage burden (hours) and cost ($) per responseTotal annual burden hours and total annual cost ($)
    (1)(2)(1) * (2) = (3)(4)(3) * (4) = (5)
    FERC-516E 59 60 (tariff filing)16511656 hrs.; $474990 hrs.; $78,210
    FERC-717 (compliance with standards) 61165116530 hrs.;62 $2,3704,950 hrs.; $391,050
    Total3305,940 hrs.; $469,260

    The one-time burden for the FERC-516E information collection will be averaged over three years:

    • 990 hours ÷ 3 = 330 hours/year over three years
    • The number of one-time responses for the FERC-725B information collection is also averaged over three years: 165 responses ÷ 3 = 55 responses/year

    Costs to Comply with Paperwork Requirements: The estimated annual costs are as follows:

    • FERC-516E: 55 entities * 1 response/entity * (6 hours/response * $79/hour) = $26,070.
    • FERC-717: 165 entities * 1 response/entity * (30 hours/response * $79/hour) = $391,050.

    Titles: Electric Rate Schedule Filing (FERC-516E); Open Access Same Time Information System and Standards for Business Practices and Communication Protocols for Public Utilities (FERC-717).

    Action: Proposed collection.

    OMB Control Nos.: 1902-0290 (FERC-516E); 1902-0173 (FERC-717).

    Respondents: Business or other for profit (Public Utilities—Generally not applicable to small businesses).

    Frequency of Responses: FERC-516E—One-time implementation (business procedures, capital/start-up); FERC-717—ongoing compliance filings.

    52. Necessity of the Information: This proposed rule, if implemented would upgrade the Commission's current business practice and communication standards and protocols modifications to support compliance with requirements established by the Commission in Order Nos. 890, 890-A, 890-B, and 890-C, as well as modifications to the OASIS-related standards to support Order Nos. 676, 676-A, 676-E, and 717 and would make additional revisions for clarity and consistency.

    53. Internal Review: The Commission has reviewed the revised business practice standards and has made a preliminary determination that the proposed revisions that we propose here to incorporate by reference are both necessary and useful. In addition, the Commission has assured itself, by means of its internal review, that there is specific, objective support for the burden estimate associated with the information requirements.

    54. Interested persons may obtain information on the reporting requirements by contacting the Federal Energy Regulatory Commission, Office of the Executive Director, 888 First Start Printed Page 24058Street NE, Washington, DC 20426 [Attn: Ellen Brown, email: DataClearance@ferc.gov, phone: (202) 502-8663, fax: (202) 273-0873].

    55. Comments concerning the information collections proposed in this NOPR and the associated burden estimates should be sent to the Commission at this docket and by email to the Office of Management and Budget, Office of Information and Regulatory Affairs [Attention: Desk Officer for the Federal Energy Regulatory Commission]. For security reasons, comments should be sent by email to OMB at the following email address: oira_submission@omb.eop.gov. Please refer to the docket number of this Notice of Proposed Rulemaking (Docket No. RM05-5-27) and OMB Control Nos. 1902-0290 (FERC-516E) and 1902-0173 (FERC-717) in your submission to OMB.

    VII. Environmental Analysis

    56. The Commission is required to prepare an Environmental Assessment or an Environmental Impact Statement for any action that may have a significant adverse effect on the human environment.[63] The Commission has categorically excluded certain actions from these requirements as not having a significant effect on the human environment.[64] The actions proposed here fall within categorical exclusions in the Commission's regulations for rules that are clarifying, corrective, or procedural, for information gathering, analysis, and dissemination, and for sales, exchange, and transportation of electric power that requires no construction of facilities.[65] Therefore, an environmental assessment is unnecessary and has not been prepared in this NOPR.

    VIII. Regulatory Flexibility Act Certification

    57. The Regulatory Flexibility Act of 1980 (RFA) [66] generally requires a description and analysis of proposed rules that will have significant economic impact on a substantial number of small entities. The RFA does not mandate any particular outcome in a rulemaking. It only requires consideration of alternatives that are less burdensome to small entities and an agency explanation of why alternatives were rejected.

    58. The Small Business Administration (SBA) size standards for electric utilities is based on the number of employees, including affiliates. Under SBA's standards, some transmission owners will fall under the following category and associated size threshold: Electric bulk power transmission and control, at 500 employees.[67]

    59. The Commission's estimate for small and large entities is not yet complete. The Commission preliminarily estimates that 72 of the 165 respondents (or ~44 percent) are small. The Commission estimates that the impact on each entity (large and small) is:

    • Year One: $474 (one-time cost for tariff filing) + 2,370 (ongoing compliance cost) = $2,844
    • Year Two and Ongoing: $2,370 (ongoing compliance cost)

    These annual estimates are consistent with the paperwork burden of $2,844/entity used above.[68] The Commission does not consider $2,844 to be a significant economic impact.

    60. Based on the above, the Commission certifies that implementation of the proposed Business Practice Standards will not have a significant impact on a substantial number of small entities. Accordingly, no initial regulatory flexibility analysis is required.

    IX. Comment Procedures

    61. The Commission invites interested persons to submit comments on the matters and issues proposed in this notice to be adopted, including any related matters or alternative proposals that commenters may wish to discuss. Comments are due July 23, 2019. Comments must refer to Docket No. RM05-5-027, and must include the commenter's name, the organization they represent, if applicable, and their address in their comments.

    62. The Commission encourages comments to be filed electronically via the eFiling link on the Commission's website at http://www.ferc.gov. The Commission accepts most standard word processing formats. Documents created electronically using word processing software should be filed in native applications or print-to-PDF format and not in a scanned format. Commenters filing electronically do not need to make a paper filing.

    63. Commenters that are not able to file comments electronically must send an original of their comments to: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE, Washington, DC 20426.

    64. All comments will be placed in the Commission's public files and may be viewed, printed, or downloaded remotely as described in the Document Availability section below. Commenters on this proposal are not required to serve copies of their comments on other commenters.

    X. Document Availability

    65. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission's Home Page (http://www.ferc.gov) and in the Commission's Public Reference Room during normal business hours (8:30 a.m. to 5:00 p.m. Eastern time) at 888 First Street NE, Room 2A, Washington, DC 20426.

    66. From the Commission's Home Page on the internet, this information is available on eLibrary. The full text of this document is available on eLibrary in PDF and Microsoft Word format for viewing, printing, and/or downloading. To access this document in eLibrary, type the docket number excluding the last three digits of this document in the docket number field.

    67. User assistance is available for eLibrary and the Commission's website during normal business hours from the Commission's Online Support at 202-502-6652 (toll free at 1-866-208-3676) or email at ferconlinesupport@ferc.gov, or the Public Reference Room at (202) 502-8371, TTY (202) 502-8659. Email the Public Reference Room at public.referenceroom@ferc.gov.

    Start List of Subjects

    List of Subjects in 18 CFR Part 38

    • Electric power plants
    • Electric utilities
    • Incorporation by reference
    • Reporting and recordkeeping requirements
    End List of Subjects Start Signature

    By direction of the Commission.

    Issued: May 16, 2019.

    Nathaniel J. Davis, Sr.,

    Deputy Secretary.

    End Signature

    In consideration of the foregoing, the Commission proposes to amend part 38, chapter I, title 18, Code of Federal Regulations, as follows.

    Start Part

    PART 38—STANDARDS FOR PUBLIC UTILITY BUSINESS OPERATIONS AND COMMUNICATIONS

    End Part Start Amendment Part

    1. The authority citation for part 38 continues to read as follows:

    End Amendment Part Start Authority

    Start Printed Page 24059 Authority: 16 U.S.C. 791-825r, 2601-2645; 31 U.S.C. 9701; 42 U.S.C. 7101-7352.

    End Authority Start Amendment Part

    2. Amend § 38.1 by revising paragraph (b) to read as follows:

    End Amendment Part
    Incorporation by reference of North American Energy Standards Board Wholesale Electric Quadrant standards.
    * * * * *

    (b) The business practice and electronic communication standards the Commission incorporates by reference are as follows:

    (1) WEQ-000, Abbreviations, Acronyms, and Definition of Terms (Version 003.2, Dec. 8, 2017);

    (2) WEQ-001, Open Access Same-Time Information System (OASIS), OASIS Version 2.2 (Version 003.2, Dec. 8, 2017) with the exception of Standards 001-9 (preamble), 001-14.1.3, 001-15.1.2 and 001-106.2.5);

    (3) WEQ-002, Open Access Same-Time Information System (OASIS) Business Practice Standards and Communication Protocols (S&CP), OASIS Version 2.2 (Version 003.2, Dec. 8, 2017);

    (4) WEQ-003, Open Access Same-Time Information System (OASIS) Data Dictionary Business Practice Standards, OASIS Version 2.2 (Version 003.2, Dec. 8, 2017);

    (5) WEQ-004, Coordinate Interchange (Version 003.2, Dec. 8, 2017);

    (6) WEQ-005, Area Control Error (ACE) Equation Special Cases (Version 003.2, Dec. 8, 2017);

    (7) (Reserved)

    (8) WEQ-007, Inadvertent Interchange Payback (Version 003.2, Dec. 8, 2017);

    (9) WEQ-008, Transmission Loading Relief (TLR)—Eastern Interconnection (Version 003.2, Dec. 8, 2017);

    (10) WEQ-011, Gas/Electric Coordination (Version 003.2, Dec. 8, 2017);

    (11) WEQ-012, Public Key Infrastructure (PKI) (Version 003.2, Dec. 8, 2017);

    (12) WEQ-013, Open Access Same-Time Information System (OASIS) Implementation Guide, OASIS Version 2.2 (Version 003.2, Dec. 8, 2017);

    (13) WEQ-015, Measurement and Verification of Wholesale Electricity Demand Response (Version 003.2, Dec. 8, 2017);

    (14) WEQ-021, Measurement and Verification of Energy Efficiency Products (Version 003.2, Dec. 8, 2017); and

    (15) WEQ-022, Electric Industry Registry Business Practice Standards (Version 003.2, Dec. 8, 2017).

    End Supplemental Information

    Footnotes

    1.  Standards for Business Practices and Communication Protocols for Public Utilities, Notice of Proposed Rulemaking, 81 FR 49580 (July 28, 2016), 156 FERC ¶ 61,055 (2016), (WEQ Version 003.1 NOPR).

    Back to Citation

    2.  See Docket No. RM05-5-027, Report of the North American Energy Standards Board on Wholesale Electric Quadrant Business Practice Standards Version 003.2 under RM05-5 (Dec. 8, 2017) (NAESB WEQ Version 003.2 Report).

    Back to Citation

    3.  NAESB WEQ Version 003.2 Report at 4. We note that, in the past, the Commission followed this same procedure in Order No. 676-E, wherein the Commission incorporated changes made by NAESB in both the WEQ Version 002.0 Standards and in the WEQ Version 002.1 Standards without taking separate action on the WEQ Version 002.0 Standards. See Standards for Business Practices and Communication Protocols for Public Utilities, Order No. 676-E, 129 FERC ¶ 61,162, at P 7 (2009).

    Back to Citation

    4.  See WEQ Version 003.1 NOPR, 156 FERC ¶ 61,055 at P 42.

    Back to Citation

    5.  Standards for Business Practices and Communication Protocols for Public Utilities, Notice of Proposed Rulemaking, 83 FR 51654 (Oct. 12, 2018), 165 FERC ¶ 61,007 (2018).

    Back to Citation

    6.  Prior to the establishment of NAESB in 2001, the Commission's development of business practice standards for the wholesale electric industry was aided by two ad hoc industry working groups established during the rulemaking proceeding that resulted in issuance of Order No. 889 and the creation of the OASIS, while GISB's efforts involved the development of business practice standards for the wholesale natural gas industry. Once formally established, NAESB took over the standards development previously handled by GISB and by the electric working groups.

    Back to Citation

    7.  The retail gas quadrant and the retail electric quadrant were combined into the retail markets quadrant. NAESB continues to refer to these working groups as “quadrants” even though there are now only three quadrants.

    Back to Citation

    8.  These commenters are identified infra note 23.

    Back to Citation

    9.  Promoting Wholesale Competition Through Open Access Non-Discriminatory Transmission Services by Public Utilities; Recovery of Stranded Costs by Public Utilities and Transmitting Utilities, Order No. 888, 61 FR 21540 (May 10, 1996), FERC Stats. & Regs. ¶ 31,036 (1996) (cross-referenced at 77 FERC ¶ 61,080), order on reh'g, Order No. 888-A, 62 FR 12274 (Mar. 14, 1997), FERC Stats. & Regs. ¶ 31,048 (cross-referenced at 78 FERC ¶ 61,220), order on reh'g, Order No. 888-B, 81 FERC ¶ 61,248 (1997), order on reh'g, Order No. 888-C, 82 FERC ¶ 61,046 (1998), aff'd in relevant part sub nom. Transmission Access Policy Study Group v. FERC, 225 F.3d 667 (D.C. Cir. 2000), aff'd sub nom. New York v. FERC, 535 U.S. 1 (2002).

    Back to Citation

    10.  Preventing Undue Discrimination and Preference in Transmission Service, Order No.890, 118 FERC ¶ 61,119, order on reh'g, Order No. 890-A, 121 FERC ¶ 61,297 (2007), order on reh'g, Order No. 890-B, 123 FERC ¶ 61,299 (2008), order on reh'g, Order No. 890-C, 126 FERC ¶ 61,228, order on clarification, Order No. 890-D, 129 FERC ¶ 61,126 (2009).

    Back to Citation

    11.  WEQ-001-25 addresses the preemption of previously queued short-term requests or reservations by a valid competing request. WEQ-001-24 addresses the combination of multiple firm PTP Parent Reservations for which they are the owner into a single reservation.

    Back to Citation

    12.  Consistent with our past practice, we do not propose to incorporate by reference into the Commission's regulations the following standards: Standards of Conduct for Electric Transmission Providers (WEQ-009); Contracts Related Standards (WEQ-010); and WEQ/WGQ eTariff Related Standards (WEQ-014). We also do not propose to incorporate by reference at this time the WEQ-023 Modeling Business Practice Standards. We do not propose to incorporate by reference standard WEQ-009 because it contains no substantive standards and merely serves as a placeholder for future standards. We do not propose to incorporate by reference standard WEQ-010 because this standard contains an optional NAESB contract regarding funds transfers and the Commission does not require utilities to use such contracts.

    Back to Citation

    13.  Standards for Business Practices and Communication Protocols for Public Utilities, Order No. 676-H, 79 FR 56,939 (Sept. 24, 2014), 148 FERC ¶ 61,205, as modified, errata notice, 149 FERC ¶ 61,014 (2014), order on reh'g, 151 FERC ¶ 61,046 (2015).

    Back to Citation

    14.  99 FERC ¶ 61,054 (2002) (Dynegy). This policy was retained and clarified in Entergy Services, Inc., 143 FERC ¶ 61,143, at P 25 & n.68 (2013) (Entergy).

    Back to Citation

    15.  Section 22.2 states: “[a]ny request by a Transmission Customer to modify Receipt and Delivery Points on a firm basis shall be treated as a new request for service in accordance with Section 17 hereof, except that such Transmission Customer shall not be obligated to pay any additional deposit if the capacity reservation does not exceed the priority for service at the existing firm Receipt and Delivery Points specified.”

    Back to Citation

    16.  Dynegy, 99 FERC ¶ 61,054 at P 9.

    Back to Citation

    17.  This result could occur if the transmission customer does not wish to match the price or term of a competing request of equal or longer duration on the redirect path.

    Back to Citation

    18.  Order No. 676-H, 148 FERC ¶ 61,205 at PP 47, 48.

    Back to Citation

    19.  The preamble to WEQ Version 003.1 Standard 001-9 reads: “[t]he Business Practice Standard WEQ-001-9 is defined in order to enhance consistency of the reservation process that applies to Redirects on a firm basis from Parent Reservations that are unconditional, as defined in Section 13.2(iii) of the pro forma tariff. The Transmission Provider shall specify any reservation process that applies to Redirects on a firm basis from Parent Reservations that are conditional, as defined in Section 13.2(iii) of the pro forma tariff in its Business Practices that are posted in accordance with Business Practice Standard WEQ-001-13.1.4.” (Emphasis added).

    Proposed cross-referenced Standard 001-13.1.4 reads: “[t]he Transmission Provider shall post information related to (1) any Transmission Provider specific Business Practices, (2) any waivers or exemptions granted from any of the OASIS requirements or Business Practice Standards, and (3) any other pertinent information related to the conduct of business with the Transmission Provider.” (Emphasis added).

    Back to Citation

    20.  WEQ Version 003.1 NOPR, 156 FERC ¶ 61,055 at P 25.

    Back to Citation

    21.  Id. P 24.

    Back to Citation

    22.  Id. P 25.

    Back to Citation

    23.  Bonneville Power Administration (Bonneville) at 5; Edison Electric Institute (Edison Institute) at 5; Idaho Power Company (Idaho Power) at 2; Southwest Power Pool, Inc. and Midwest Independent System Operator, Inc. (collectively, Joint Commenters) at 6; Open Access Technology International (OATI) at 3; Public Utility District No. 1 of Snohomish County, Washington and the City of Tacoma, Department of Public Utilities, Light Division (collectively, Snohomish/Tacoma) at 1; and Southern Company Services, Inc. (Southern) at 4. California Independent System Operator Corporation was the sole commenter who did not address this issue.

    Back to Citation

    24.  NAESB's redirect standards require a reservation for service to be unconditional before it may be redirected.

    Back to Citation

    25.  Bonneville at 4, 7; Idaho Power at 2; Joint Commenters at 6; OATI at 3; and Southern at 4.

    Back to Citation

    26.  Bonneville at 6; OATI at 4.

    Back to Citation

    27.  OATI at 2-3.

    Back to Citation

    28.  See, e.g., Edison Institute at 7; OATI at 3.

    Back to Citation

    29.  Joint Commenters at 8-9.

    Back to Citation

    30.  See, e.g., Edison Institute at 6; OATI at 3; and Southern at 5.

    Back to Citation

    31.  See, e.g., Bonneville at 5; Edison Institute at 6.

    Back to Citation

    32.  Edison Institute at 5-6.

    Back to Citation

    33.  Bonneville at 4-5.

    Back to Citation

    34.  Southern at 5.

    Back to Citation

    35.  Idaho Power at 2; Southern at 5-6.

    Back to Citation

    36.  Joint Commenters at 5; Southern at 4.

    Back to Citation

    37.  Edison Institute at 4.

    Back to Citation

    38.  Snohomish/Tacoma at 1.

    Back to Citation

    39.  OATI at 4.

    Back to Citation

    40.  Id. at 3.

    Back to Citation

    41.  Id. at 4.

    Back to Citation

    42.  Bonneville at 6.

    Back to Citation

    43.  Edison Institute at 10; Joint Commenters at 7; Southern at 7.

    Back to Citation

    44.  OATI at 6.

    Back to Citation

    45.  Edison Institute at 11; Idaho Power at 4; OATI at 6.

    Back to Citation

    46.  Edison Institute at 11.

    Back to Citation

    47.  Bonneville at 7; Idaho Power at 4.

    Back to Citation

    48.  1 CFR 51.5 (2018). See Incorporation by Reference, 79 FR 66267 (Nov. 7, 2014).

    Back to Citation

    49.  As explained above, in a separate proceeding (in Docket No. RM05-5-026) the Commission has proposed to retire the standards on manual time error correction. Final action on that proposal remains pending.

    Back to Citation

    50.  The suites of NAESB business practice standards we are not proposing to incorporate by reference in this NOPR are: (1) The WEQ-009 Standards of Conduct for Electric Transmission Providers, which NASESB has now eliminated as they duplicate the Commission's regulations; (2) the WEQ-010 Contracts Related Business Practice Standards that establish model contracts for the wholesale electric industry, and which the Commission has not incorporated as they are not mandatory; (3) the WEQ-014 WEQ/WGQ eTariff Related Business Practice Standards, which provide an implementation guide describing the various mechanisms, data tables, code values/reference tables, and technical specifications used in the submission of electronic tariff filings to the Commission, which the Commission has not incorporated as these submittals are governed by the Commission's eTariff regulations; (4) the WEQ-023 Modeling Business Practice Standards, which the Commission is addressing in a separate rulemaking; and (5) the WEQ-016, WEQ-017, WEQ-018, WEQ-019, and WEQ-020 Business Practice Standards that were developed as part of the Smart Grid implementation and which the Commission adopted as non-mandatory guidance in 18 CFR 2.27 (2018). See Order No. 676-H, 148 FERC ¶ 61,205.

    Back to Citation

    52.  As a private, consensus standards developer, NAESB needs the funds obtained from its membership fees and sales of its standards to finance the organization. The parties affected by these Commission regulations generally are highly sophisticated and have the means to acquire the information they need to effectively participate in Commission proceedings.

    Back to Citation

    53.  Procedures for non-members to evaluate work products before purchasing are available at https://www.naesb.org/​misc/​NAESB_​Nonmember_​Evaluation.pdf. See Incorporation by Reference, 79 FR at 66271, n.51 & 53 (Nov. 7, 2014) (citing to NAESB's procedure of providing “no-cost, no-print electronic access,” NAESB Comment at 1, http://www.regulations.gov/​#!documentDetail;​D=​OFR-2013-0001-0023).

    Back to Citation

    54.  North American Energy Standards Board Membership Application, https://www.naesb.org/​pdf4/​naesbapp.pdf.

    Back to Citation

    58.  The Commission staff estimates that industry is similarly situated in terms of hourly cost (for wages plus benefits). Based on the Commission's FY (Fiscal Year) 2018 average cost (for wages plus benefits), $79.00/hour is used.

    Back to Citation

    59.  This burden category is intended for FERC-516, the Commission's identifier that corresponds to OMB Control No. 1902-0096 (Electric Rate Schedules and Tariff Filings). However, another unrelated item is pending OMB review using this OMB Control No. and only one item per OMB Control No. may be pending at a time. Therefore, to ensure timely submission, Commission staff is using FERC-516E (OMB Control No. 1902-0290), a temporary collection number.

    60.  These information collection requirements are one-time burden estimates. After implementation in Year 1, the revision proposed in this NOPR would be complete.

    61.  FERC-717 is the Commission's identifier that corresponds to OMB control no. 1902-0173 that identifies the information collection associated with Standards for Business Practices and Communication Protocols for Public Utilities.

    62.  The 30-hour estimate was developed in Docket No. RM05-5-013, when the Commission prepared its estimate of the scope of work involved in transitioning to the NAESB Version 002.1 Business Practice Standards. See Order No. 676-E, 129 FERC ¶ 61,162 at P 134. We have retained the same estimate here, because the scope of the tasks involved in the transition to Version 003.2 of the Business Practice Standards is very similar to that for the transition to the Version 003 Standards.

    Back to Citation

    63.  Regulations Implementing the National Environmental Policy Act, Order No. 486, FERC Stats. & Regs. ¶ 30,783 (1987) (cross-referenced at 41 FERC ¶ 61,284).

    Back to Citation

    67.  13 CFR 121.201 (2018), Sector 22 (Utilities), NAICS code 221121 (Electric Bulk Power Transmission and Control).

    Back to Citation

    68.  36 hours/entity (6 hours/entity for tariff filing + 30 hours/entity for compliance with standards) at $79/hour = $2,844.

    Back to Citation

    [FR Doc. 2019-10695 Filed 5-23-19; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
05/24/2019
Department:
Federal Energy Regulatory Commission
Entry Type:
Proposed Rule
Action:
Notice of proposed rulemaking.
Document Number:
2019-10695
Dates:
Comments are due July 23, 2019.
Pages:
24050-24059 (10 pages)
Docket Numbers:
Docket No. RM05-5-027
Topics:
Electric power plants, Electric utilities, Incorporation by reference, Reporting and recordkeeping requirements
PDF File:
2019-10695.pdf
CFR: (1)
18 CFR 38.1