2019-13560. Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NESHAP for Area Sources: Primary Copper Smelting, Secondary Copper Smelting, and Primary Nonferrous Metals-Zinc, Cadmium, and Beryllium (Renewal)  

  • Start Preamble

    AGENCY:

    Environmental Protection Agency (EPA).

    ACTION:

    Notice.

    SUMMARY:

    The Environmental Protection Agency (EPA) has submitted an information collection request (ICR), NESHAP for Area Sources: Primary Copper Smelting, Secondary Copper Smelting, and Primary Nonferrous Metals-Zinc, Cadmium, and Beryllium (EPA ICR Number 2240.06, OMB Control Number 2060-0596), to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act. This is a proposed extension of the ICR, which is currently approved through June 30, 2019. Public comments were previously requested, via the Federal Register on May 30, 2018 during a 60-day comment period. This notice allows for an additional 30 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An agency may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

    DATES:

    Additional comments may be submitted on or before July 26, 2019.

    ADDRESSES:

    Submit your comments, referencing Docket ID Number EPA-HQ-OECA-2012-0702, to: (1) EPA online using www.regulations.gov (our preferred method), or by email to docket.oeca@epa.gov, or by mail to: EPA Docket Center, Environmental Protection Agency, Mail Code 28221T, 1200 Pennsylvania Ave. NW, Washington, DC 20460; and (2) OMB via email to oira_submission@omb.eop.gov. Address comments to OMB Desk Officer for EPA.

    EPA's policy is that all comments received will be included in the public docket without change, including any personal information provided, unless the comment includes profanity, threats, information claimed to be Confidential Business Information (CBI), or other information whose disclosure is restricted by statute.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Patrick Yellin, Monitoring, Assistance, and Media Programs Division, Office of Compliance, Mail Code 2227A, Environmental Protection Agency, 1200 Pennsylvania Ave. NW, Washington, DC 20460; telephone number: (202) 564-2970; fax number: (202) 564-0050; email address: yellin.patrick@epa.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Supporting documents which explain in detail the information that the EPA will be collecting are available in the public docket for this ICR. The docket can be viewed online at www.regulations.gov,, or in person at the EPA Docket Center, WJC West, Room 3334, 1301 Constitution Ave. NW, Washington, DC. The telephone number for the Docket Center is 202-566-1744. For additional information about EPA's public docket, visit: http://www.epa.gov/​dockets.

    Abstract: The National Emission Standards for Hazardous Air Pollutants (NESHAP) for Area Sources: Primary Copper Smelting, Secondary Copper Smelting, and Primary Nonferrous Metals-Zinc, Cadmium, and Beryllium (40 CFR part 63, subparts EEEEEE, FFFFFF, and GGGGGG) were proposed on October 6, 2006, and promulgated on January 23, 2007. These regulations apply to both new and existing primary copper smelting facilities (subpart EEEEEE), new secondary copper smelting facilities (subpart FFFFFF), and both new and existing primary zinc or beryllium production facilities (subpart GGGGGG) that are an area source of hazardous air pollutant (HAP) emissions. New facilities include those that commenced construction or reconstruction after the date of proposal. This information is being collected to assure compliance with 40 CFR part 63, subparts EEEEEE, FFFFFF, and GGGGGG.

    In general, all NESHAP standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NESHAP.

    Form Numbers: None.

    Respondents/affected entities: Primary copper smelting facilities, secondary copper smelting facilities, and primary zinc or beryllium production facilities.

    Respondent's obligation to respond: Mandatory (40 CFR part 63).

    Estimated number of respondents: Five (total).

    Frequency of response: Semiannual.

    Total estimated burden: 74 hours (per year). Burden is defined at 5 CFR 1320.3(b).

    Total estimated cost: $8,380 (per year), which includes $0 for annualized capital/startup and/or operation & maintenance costs.

    Changes in the estimates: There is no change in the burden in this ICR compared to the previous ICR. This is due to two considerations. First, the regulations have not changed over the past three years and are not anticipated to change over the next three years. Secondly, the growth rate for the industry is very low, negative or non-existent, so there is no significant Start Printed Page 30111change in the overall burden. There is an adjustment increase in the labor costs in this ICR compared to the previous ICR.

    Start Signature

    Courtney Kerwin,

    Director, Regulatory Support Division.

    End Signature End Supplemental Information

    [FR Doc. 2019-13560 Filed 6-25-19; 8:45 am]

    BILLING CODE 6560-50-P

Document Information

Published:
06/26/2019
Department:
Environmental Protection Agency
Entry Type:
Notice
Action:
Notice.
Document Number:
2019-13560
Dates:
Additional comments may be submitted on or before July 26, 2019.
Pages:
30110-30111 (2 pages)
Docket Numbers:
EPA-HQ-OECA-2012-0702, FRL-9995-12-OMS
PDF File:
2019-13560.pdf