00-1241. Implementing Foreign Proposals to NASA Research Announcements on a No-Exchange-of-Funds Basis  

  • Start Preamble

    AGENCY:

    National Aeronautics and Space Administration (NASA).

    ACTION:

    Interim rule adopted as final with changes.

    SUMMARY:

    This is a final rule amending the NASA FAR Supplement (NFS) to conform the handling of foreign proposals under NASA Research Announcements (NRAs) with that under Announcements of Opportunity (AOs).

    EFFECTIVE DATE:

    January 20, 2000.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Celeste Dalton, NASA Headquarters, Code HK, Washington, DC 20546, (202) 358-1645, email: celeste.dalton@hq.nasa.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    A. Background

    NASA is adopting as final, with changes, the interim rule published in the Federal Register (64 FR 48560-48562, September 7, 1999) that revised NFS Parts 1852, Solicitation Provisions and Contract Clauses, and 1872, Acquisition of Investigations. One comment, addressing submission requirements, was received in response to the interim rule, and was considered in the development of the final rule. Editorial and administrative changes are included in the final rule. Included in these changes is a revision to the proposal submission requirements to be consistent with internal procedures. All the revisions in this final rule are considered administrative or editorial and do not involve a significant change in Agency policy.

    B. Regulatory Flexibility Act

    NASA certifies that this final rule will not have a significant economic impact on a substantial number of small business entities within the meaning of the Regulatory Flexibility Act, (5 U.S.C. 601, et seq.), because it only affects small business entities in the rare circumstance when such entities team with a foreign entity in response to a NRA.

    C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because the changes to the NFS do not impose any recordkeeping or information collection requirements, or collections of information from offerors, contractors, or members of the public that require the approval of the Office of Management and Budget under 44 U.S.C. 3501, et seq.

    Start List of Subjects

    List of Subjects in 48 CFR Parts 1806, 1813, 1815, 1835, 1852, and 1872

    • Government procurement
    End List of Subjects Start Signature

    Tom Luedtke,

    Associate Administrator for Procurement.

    End Signature

    Interim Rule Adopted as Final With Changes

    Start Amendment Part

    Accordingly, the interim rule published at 64 FR 48560-48562, September 7, 1999, is hereby adopted as final with the following changes:

    End Amendment Part Start Amendment Part

    1. The authority citation for 48 CFR Parts 1806, 1813, 1815, 1835, 1852, and 1872 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 42 U.S.C. 2473(c)(1).

    End Authority Start Part

    PART 1852—SOLICITATION PROVISIONS AND CONTRACT CLAUSES

    End Part Start Amendment Part

    2. In section 1852.235-72, revise the date of the provision; delete paragraphs (l)(2) and (l)(3); redesignate paragraphs (l)((4) through (l)(6) as (l)(2) through (l)(4), respectively; in newly designated paragraph (l)(4) delete (l)(4)(i), redesignate paragraphs (l)(4)(ii) and (l)(4)(iii) as (l)(4)(i) and (l)(4)(ii), respectively; and revise to read as follows.

    End Amendment Part
    Instructions for Responding to NASA Research Announcements.
    * * * * *

    Instructions for Responding to NASA Research Announcements—January 2000

    * * * * *

    (l) Additional Guidelines Applicable to Foreign Proposals and Proposals Including Foreign Participation

    (1) NASA welcomes proposals from outside the U.S. However, foreign entities are generally not eligible for funding from NASA. Therefore, unless otherwise noted in the NRA, proposals from foreign entities should not include a cost plan unless the proposal involves collaboration with a U.S. institution, in which case a cost plan for only the participation of the U.S. entity must be included. Proposals from foreign entities and proposals from U.S. entities that include foreign participation must be endorsed by the respective government agency or funding/sponsoring institution in the country from which the foreign entity is proposing. Such endorsement should indicate that the proposal merits careful consideration by NASA, and if the proposal is selected, sufficient funds will be made available to undertake the activity as proposed.

    (2) All foreign proposals must be typewritten in English and comply with all other submission requirements stated in the NRA. All foreign proposals will undergo the same evaluation and selection process as those originating in the U.S. All proposals must be received before the established closing date. Those received after the closing date will be treated in accordance with Start Printed Page 3154paragraph (g) of this provision. Sponsoring foreign government agencies or funding institutions may, in exceptional situations, forward a proposal without endorsement if endorsement is not possible before the announced closing date. In such cases, the NASA sponsoring office should be advised when a decision on endorsement can be expected.

    (3) Successful and unsuccessful foreign entities will be contacted directly by the NASA sponsoring office. Copies of these letters will be sent to the foreign sponsor. Should a foreign proposal or a U.S. proposal with foreign participation be selected, NASA's Office of External Relations will arrange with the foreign sponsor for the proposed participation on a no-exchange-of-funds basis, in which NASA and the non-U.S. sponsoring agency or funding institution will each bear the cost of discharging their respective responsibilities.

    (4) Depending on the nature and extent of the proposed cooperation, these arrangements may entail:

    (i) An exchange of letters between NASA and the foreign sponsor; or

    (ii) A formal Agency-to-Agency Memorandum of Understanding (MOU).

    * * * * *
    Start Part

    PART 1872—ACQUISITION OF INVESTIGATIONS

    End Part Start Amendment Part

    3. In section 1872.705-2, amend the Management Plan and Cost Plan by deleting paragraph (a)(3)(viii)(A); redesignating paragraphs (a)(3)(viii)(B) and (a)(3)(viii)(C) as (a)(3)(viii)(A) and (a)(3)(viii)(B), respectively; and revising paragraphs (a)(3)(i), (a)(3)(iv), (a)(3)(vi) and (a)(3)(viii) to read as follows.

    End Amendment Part
    Appendix B: Guidelines for Proposal Preparation
    * * * * *

    Management Plan and Cost Plan

    (a) * * *

    (3) * * *

    (i) Where a “Notice of Intent” to propose is requested, prospective foreign proposers should write directly to the NASA official designated in the AO.

    * * * * *

    (iv) Proposals including the requested number of copies and letters of endorsement from the foreign governmental agency must be forwarded to NASA in time to arrive before the deadline established for each AO.

    * * * * *

    (vi) Shortly after the deadline for each AO, the Program Office will advise the appropriate sponsoring agency which proposals have been received and when the selection process should be completed. A copy of this acknowledgment will be provided to each proposer.

    * * * * *

    (viii) NASA's Office of External Relations will then begin making the arrangements to provide for the selectee's participation in the appropriate NASA program. Depending on the nature and extent of the proposed cooperation, these arrangements may entail:

    (A) An exchange of letters between NASA and the sponsoring foreign governmental agency.

    (B) An agreement or Memorandum of Understanding between NASA and the sponsoring foreign governmental agency.

    * * * * *
    End Supplemental Information

    [FR Doc. 00-1241 Filed 1-19-00; 8:45 am]

    BILLING CODE 7510-01-P

Document Information

Published:
01/20/2000
Department:
National Aeronautics and Space Administration
Entry Type:
Rule
Action:
Interim rule adopted as final with changes.
Document Number:
00-1241
Dates:
January 20, 2000.
Pages:
3153-3154 (2 pages)
Topics:
Government procurement
PDF File:
00-1241.pdf
CFR: (2)
48 CFR 1852.235-72
48 CFR 1872.705-2