2021-24874. Streamlining Electric Program Procedures; Correction

  • Start Preamble

    AGENCY:

    Rural Utilities Service, Department of Agriculture (USDA).

    ACTION:

    Final rule; correcting amendment.

    SUMMARY:

    On July 9, 2021, Rural Development's Rural Utilities Service referred to as “the Agency” or “Agency” published a document to streamline its procedures for the Electric Program borrowers, including its loan application requirements, approval of construction work plans, contract bidding procedures, contact approval procedures, system operation and maintenance reviews, long-range engineering plans and system design procedures. That document inadvertently published the incorrect accounting information. This document corrects the final regulations.

    DATES:

    Effective November 16, 2021.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    For information specific to this notice contact Michele Brooks, Director, Regulations Management, Rural Development Innovation Center—Regulations Management, USDA, 1400 Independence Avenue SW, STOP 1522, Room 4266, South Building, Washington, DC 20250-1522. Telephone: (202) 690-1078. Email michele.brooks@usda.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The Rural Development's Rural Utilities Service is issuing a correction to the final rule that published July 9, 2021, at 86 FR 36199. In that rule, an inadvertent error provided the incorrect information in the Special Equipment section of part 119 § 1767.41. This correcting amendment provides the proper information.

    Start List of Subjects

    List of Subjects in 7 CFR Part 1767

    • Electric power
    • Loan programs—energy
    • Rural areas
    • Uniform System of Accounts
    End List of Subjects

    For the reasons stated in the preamble, the Rural Utilities Service corrects 7 CFR part 1767 with the following correcting amendment:

    Start Part

    PART 1767—ACCOUNTING REQUIREMENTS FOR RUS ELECTRIC BORROWERS

    End Part Start Amendment Part

    1. The authority citation for part 1767 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 7 U.S.C. 901 et seq., 1921 et seq., 6941 et seq.

    End Authority Start Amendment Part

    2. In § 1767.41, amend entry 119 by revising entry 3 to read as follows:

    End Amendment Part
    Accounting methods and procedures required of all RUS borrowers.
    * * * * *

    119 Special Equipment

    * * * * *
    Start Amendment Part

    3. Meters, Meter Sockets, current and potential transformers, and other metering equipment recorded in Account 370, Meters.

    End Amendment Part
    * * * * *
    Start Signature

    Christopher A. McLean,

    Acting Administrator, Rural Utilities Service, U.S. Department of Agriculture.

    End Signature End Supplemental Information

    [FR Doc. 2021-24874 Filed 11-15-21; 8:45 am]

    BILLING CODE P

Document Information

Effective Date:
11/16/2021
Published:
11/16/2021
Department:
Rural Utilities Service
Entry Type:
Rule
Action:
Final rule; correcting amendment.
Document Number:
2021-24874
Dates:
Effective November 16, 2021.
Pages:
63308-63308 (1 pages)
Docket Numbers:
Docket No. RUS-21-ELECTRIC-0019
RINs:
0572-AC53: Streamlining and Improving RUS Electric Program Procedures--7 CFR 1710, 1714, 1717, 1718, 1721, 1726, 1730 and 1767
RIN Links:
https://www.federalregister.gov/regulations/0572-AC53/streamlining-and-improving-rus-electric-program-procedures-7-cfr-1710-1714-1717-1718-1721-1726-1730-
Topics:
Electric power, Loan programs-energy, Rural areas, Uniform System of Accounts
PDF File:
2021-24874.pdf
Supporting Documents:
» Streamlining Electric Program Procedures; Correction
CFR: (1)
7 CFR 1767.41