98-29776. Public Telecommunications Facilities Program: Closing Date  

  • [Federal Register Volume 63, Number 215 (Friday, November 6, 1998)]
    [Notices]
    [Pages 60192-60197]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-29776]
    
    
    
    [[Page 60191]]
    
    _______________________________________________________________________
    
    Part VII
    
    
    
    
    
    Department of Commerce
    
    
    
    
    
    _______________________________________________________________________
    
    
    
    National Telecommunications and Information Administration
    
    
    
    _______________________________________________________________________
    
    
    
    Public Telecommunications Facilities Program: Closing Date; Notice
    
    Federal Register / Vol. 63, No. 215 / Friday, November 6, 1998 / 
    Notices
    
    [[Page 60192]]
    
    
    
    DEPARTMENT OF COMMERCE
    
    National Telecommunications and Information Administration
    [Docket No. 981028269-8269-01]
    RIN 0660-ZA05
    
    
    Public Telecommunications Facilities Program: Closing Date
    
    AGENCY: National Telecommunications and Information Administration 
    (NTIA), Commerce.
    
    ACTION: Notice of availability of funds.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The National Telecommunications and Information Administration 
    (NTIA), U.S. Department of Commerce, announces the solicitation of 
    applications for planning and construction grants for public 
    telecommunications facilities under the Public Telecommunications 
    Facilities Program (PTFP).
        Applicants for matching grants under the PTFP must file their 
    applications on or before January 14, 1999. NTIA anticipates making 
    grant awards by September 30, 1999. NTIA shall not be liable for any 
    proposal preparation costs.
        Approximately $21 million is available for FY 1999 for PTFP grants 
    pursuant to P.L. 105-277, the ``Department of Commerce and Related 
    Agencies Appropriations Act, 1999.'' The amount of a grant award by 
    NTIA will vary, depending on the approved project. For fiscal year 
    1998, NTIA awarded $19.8 million in funds to 115 projects. The awards 
    ranged from $3,000 to $978,033.
        The applicable Rules for the PTFP were published on November 8, 
    1996. These rules, 15 CFR Part 2301 et seq. will be in effect for FY 
    1999 PTFP applications. Certain requirements of the PTFP at 15 CFR Part 
    2301 are modified in this Notice. Copies of the 1996 Rules will be 
    distributed as part of the PTFP Application Kit and applicants are 
    cautioned not to use older versions of the PTFP Rules which were 
    published in 1991.
        Parties interested in applying for financial assistance should 
    refer to these rules and to the authorizing legislation (47 U.S.C. 
    Secs. 390-393, 397-399b) for additional information on the program's 
    goals and objectives, eligibility criteria, evaluation criteria, and 
    other requirements.
    
    DATES: Pursuant to 15 CFR Sec. 2301.8(b), the Administrator of NTIA 
    hereby establishes the closing date for the filing of applications for 
    grants under the PTFP. The closing date selected for the submission of 
    applications for 1999 is January 14, 1999. Applications must be 
    received prior to 8 p.m. on or before January 14, 1999. Applicants 
    sending an application should submit an original and five copies to the 
    place indicated in the Address section below. Applicants sending 
    applications by the United States Postal Service or commercial delivery 
    services must ensure that the carrier will be able to guarantee 
    delivery of the application by the Closing Date and Time. NTIA will not 
    accept mail delivery of applications posted on the Closing Date or 
    later and received after the above deadline. However, if an application 
    is received after the Closing Date due to (1) carrier error, when the 
    carrier accepted the package with a guarantee for delivery by the 
    Closing Date, or (2) significant weather delays or natural disasters, 
    NTIA will, upon receipt of proper documentation, consider the 
    application as having been received by the deadline. Applicants 
    submitting applications by hand delivery are notified that, due to 
    security procedures in the Department of Commerce, all packages must be 
    cleared by the Department's security office. Entrance to the Department 
    of Commerce Building for security clearance is on the 15th Street side 
    of the building. Applicants whose applications are not received by the 
    deadline are hereby notified that their applications will not be 
    considered in the current grant cycle and will be returned to the 
    applicant. See 15 CFR Sec. 2301.8(c); but see also 15 CFR Sec. 2301.26. 
    NTIA will also return any application which is substantially 
    incomplete, or when the Agency finds that either the applicant or 
    project is ineligible for funding under 15 CFR Sec. 2301.3 or 
    Sec. 2301.4. The Agency will inform the applicant of the reason for the 
    return of any application.
    
    ADDRESSES: To obtain an application package, submit completed 
    applications, or send any other correspondence, write to: NTIA/PTFP, 
    Room H-4625, U.S. Department of Commerce, 14th Street and Constitution 
    Avenue, N.W., Washington, DC 20230.
    
    FOR FURTHER INFORMATION CONTACT: Dennis R. Connors, Director, Public 
    Broadcasting Division, telephone: (202) 482-5802; fax: (202) 482-2156. 
    Information about the PTFP can also be obtained electronically via 
    Internet (http://www.ntia.doc.gov).
    
    SUPPLEMENTARY INFORMATION:
    
    I. Application Forms and Regulations
    
        To apply for a PTFP grant, an applicant must file an original and 
    five copies of a timely and complete application on a current form 
    approved by the Agency. The current application form will be provided 
    to applicants as part of the application package. This form expires on 
    November 30, 2000, and no previous versions of the form may be used. 
    (In accordance with the Paperwork Reduction Act, the current 
    application form has been cleared under OMB control no. 0660-0003.) 
    Applications submitted by facsimile or electronic means are not 
    acceptable.
        All persons and organizations on the PTFP's mailing list will be 
    sent a copy of the current application form and the Final Rules. Those 
    not on the mailing list may obtain copies by contacting the PTFP at the 
    telephone and fax numbers or at the Internet or mailing addresses noted 
    above. Prospective applicants should read the Final Rules carefully 
    before submitting applications. Applicants whose applications were 
    deferred in FY 1998 will be mailed pertinent PTFP materials and 
    instructions for requesting reactivation of their applications.
        Based upon NTIA's experience in implementing the PTFP during the 
    1998 grant round, NTIA has determined that it is in the best interests 
    of NTIA and applicants to modify or waive certain requirements 
    contained in the PTFP regulations at 15 CFR Part 2301. These changes, 
    which are applicable to the FY 1999 PTFP applications and resulting 
    awards only, are indicated in italics below. Dependent upon the 
    effectiveness of these changes, amendments may be made to the PTFP 
    regulations to implement these changes.
    
    Section 2301.10  Applications Resulting From Catastrophic Damage or 
    Emergency Situations
    
        Section 2301.10 provides for submission of applications resulting 
    from catastrophic damage or emergency situations. Section 2301.10(a) 
    requires that an emergency ``application may be filed with a request 
    for a waiver of the Closing Date.'' Section 2301.10(f) requires that 
    emergency ``applications will be subject to the same evaluation and 
    selection process followed for applications received in the normal 
    application cycle.'' This section has been revised for FY 1999 PTFP 
    applicants to clarify that (1) an emergency application may be filed at 
    any time, (2) an emergency application will be evaluated according the 
    evaluation criteria set forth on Sec. 2301.17(b) and the degree to 
    which the application satisfies the purposes of this section, and (3) 
    the selection process that will be used in determining a grant award.
        (a) For FY 1999 PTFP applicants, when an eligible broadcast 
    applicant
    
    [[Page 60193]]
    
    suffers catastrophic damage to the basic equipment essential to its 
    continued operation as a result of a natural or manmade disaster, or as 
    the result of significant equipment failure, and is in dire need of 
    assistance in funding replacement of the damaged equipment, it may file 
    an emergency application for PTFP funding at any time. This section is 
    limited to equipment essential to a station's continued operation such 
    as transmitters, tower, antennas, STL's or similar equipment which, if 
    the equipment failed, would result in a complete loss of service to the 
    community.
        (b) The emergency application must set forth the circumstances that 
    prompt the request and be accompanied by appropriate supporting 
    documentation.
        (c) An application may be granted an award only if it is determined 
    that (1) the emergency satisfies the requirements of subparagraph (a) 
    of this section, and (2) the applicant either carried adequate 
    insurance or had acceptable self-insurance coverage.
        (d) Applicants claiming significant failure of equipment must 
    document the circumstances of the equipment failure and demonstrate 
    that the equipment has been maintained in accordance with standard 
    broadcast engineering practices.
        (e) Applications filed and accepted pursuant to this section must 
    contain all of the information required by the Agency application 
    materials and must be submitted in the number of copies specified by 
    the Agency.
        (f) The application will be subject to the evaluation criteria set 
    forth in 2301.17(b). The PTFP Director takes into account program staff 
    evaluations (including the outside reviewers) the availability of 
    funds, the type of project and broadcast priorities set forth at 
    2301.4(b), and whether the applicant has any current NTIA grants. The 
    Director presents recommendations to the OTIA Associate Administrator 
    for review and approval. Upon approval by the OTIA Associate 
    Administrator, the Director's recommendation will be presented to the 
    Selecting Official, the NTIA Administrator. The Administrator makes 
    final award selections taking into consideration the Director's 
    recommendation and the degree to which the application satisfies the 
    program's stated purposes set forth at 2301.1(a) and (c) and this 
    section.
    
    Section 2301.11  Service of Applications
    
        Section 2301.11 provides that: ``On or before the closing date, all 
    new or deferred applicants must serve a summary copy of the application 
    on the following Agencies:
        (a) In the case of an application for a construction grant for 
    which FCC authorization is necessary, the Secretary, Federal 
    Communications Commission * * *
        (b) The state telecommunications agency(-ies) if any, having 
    jurisdiction over the development of broadcast and/or non broadcast 
    telecommunications in the state(s) and community(-ies) to be served by 
    the proposed project * * *
        (c) The state office established to review applications under 
    Executive Order 12372.
    Sec. 2301.11(a)
        For the FY 1999 PTFP, applicants are not required to submit copies 
    of their PTFP applications to the FCC, nor will they be required to 
    submit copies of the FCC transmittal cover letters as part of their 
    PTFP applications. NTIA routinely notifies the FCC of applications 
    submitted for funding which require FCC authorizations.
    Sec. 2301.11(b)
        For the FY 1999 PTFP, applicants for distance learning projects are 
    not required to notify every state telecommunications agency in a 
    potential service area. NTIA has found that state telecommunication 
    agency input has been useful with regard to broadcast projects, but has 
    received little input from state agencies with regard to distance 
    learning projects. Since many distance learning applications propose 
    projects which are nationwide in nature, NTIA believes that the 
    requirement to provide a summary copy of the application in every state 
    telecommunications agency in a potential service area is unduly 
    burdensome to applicants. NTIA, however, does expect that distance 
    learning applicants will submit documentation that they have 
    coordinated their project with appropriate state telecommunications 
    agencies in their service area.
    
    Section 2301.12  Federal Communications Commission Authorizations
    
        Section 2301.12(a) provides, in part, that ``Each applicant whose 
    project requires FCC authorization must file an application for that 
    authorization on or before the closing date. NTIA recommends that its 
    applicants submit PTFP-related FCC applications to the FCC at least 60 
    days prior to the PTFP closing date.''
        For the FY 1999 PTFP, applicants may submit applications to the FCC 
    after the closing date, but do so at their own risk. Applicants are 
    urged to submit their FCC applications with as much time before the 
    PTFP closing date as possible. No grant will be awarded for a project 
    requiring FCC authorization until confirmation has been received by 
    NTIA from the FCC that the necessary authorization will be issued.
        Section 2301.12(b) provides that ``In the case of FCC 
    authorizations where it is not possible or practical to submit the FCC 
    application with the PTFP application, such as C-band satellite uplinks 
    * * * a copy of the FCC application as it will be submitted to the FCC, 
    or the equivalent engineering data, must be included in the PTFP 
    application.''
        For the FY 1999 PTFP applications, since there is no potential for 
    terrestrial interference with Ku-band satellite uplinks, grant 
    applicants for Ku-band satellite uplinks may submit FCC applications 
    after a PTFP award is made. Grant recipients for Ku-band satellite 
    uplinks will be required to document receipt of FCC authorizations to 
    operate the uplink prior to the release of Federal funds.
        Section 2301.12(d) provides that ``Any FCC authorization required 
    for the project must be in the name of the applicant for the PTFP 
    grant.''
        For the FY 1999 PTFP applications, NTIA may accept FCC 
    authorizations that are in the name of an organization other than the 
    PTFP applicant in certain circumstances. Applicants requiring the use 
    of FCC authorizations issued to another organization should discuss in 
    the application Program Narrative why the FCC authorization must be in 
    the other organization's name. NTIA believes that such circumstances 
    will be rare and, in our experience, are usually limited to 
    authorizations such as those for microwave interconnections or 
    satellite uplinks.
        Section 2301.12(g) provides that ``If the applicant fails to file 
    the required FCC application(s) by the closing date * * * the Agency 
    may reject or return the application.''
        As noted above, for the FY 1999 PTFP applications, NTIA does not 
    require that the FCC applications must be filed by the closing date. 
    While NTIA is permitting submission of FCC applications after the 
    closing date, applicants are reminded that they must continue to 
    provide copies of FCC applications, as they were filed or will be 
    filed, or equivalent engineering data, in the PTFP application so NTIA 
    can properly evaluate the equipment request. These include applications 
    for permits, construction permits and licenses already received for: 
    (1) Construction of broadcast station
    
    [[Page 60194]]
    
    (including a digital broadcasting facility), or translator, (2) 
    microwave facilities, (3) ITFS authorizations, (4) SCA authorizations, 
    and (5) requests for extensions of time.
        Applicants should note that they must continue to comply with the 
    provisions of Executive Order 12372, ``Intergovernmental Review of 
    Federal Programs.'' The Executive Order requires applicants for 
    financial assistance under this program to file a copy of their 
    application with the Single Points of Contact (SPOC) of all states 
    relevant to the project. Applicants are required to provide a copy of 
    their completed application to the appropriate SPOC on or before 
    January 14, 1999. Applicants are encouraged to contact the appropriate 
    SPOC well before the PTFP closing date.
        Indirect costs for construction applications are not supported by 
    this program. The total dollar amount of the indirect costs proposed in 
    a planning application under this program must not exceed the indirect 
    cost rate negotiated and approved by a cognizant Federal agency prior 
    to the proposed effective date of the award or 100 percent of the total 
    proposed direct costs dollar amount in the application, whichever is 
    less.
        You are not required to respond to a collection of information 
    sponsored by the Federal government, and the government may not conduct 
    or sponsor this collection, unless it displays a currently valid OMB 
    control number or if we fail to provide you with this notice.
        All primary applicants must submit a completed Form CD-511, 
    ``Certifications Regarding Debarment, Suspension, and Other 
    Responsibility Matters; Drug-Free Workplace Requirements and 
    Lobbying,'' and the following explanations are hereby provided:
        (1) Nonprocurement Debarment and Suspension. Prospective 
    participants (as defined at 15 CFR Part 26, Section 105) are subject to 
    15 CFR Part 26, ``Nonprocurement Debarment and Suspension'' and the 
    related section of the certification form prescribed above applies;
        (2) Drug Free Workplace. Grantees (as defined at 15 CFR Part 26, 
    Section 605) are subject to 15 CFR Part 26, Subpart F, ``Government-
    wide Requirements for Drug-Free Workplace (Grants)'' and the related 
    section of the certification form prescribed above applies;
        (3) Anti-lobbying. Persons (as defined at 15 CFR Part 28, Section 
    105) are subject to the lobbying provisions of 31 U.S.C. 1352, 
    ``Limitation on use of appropriated funds to influence certain Federal 
    contracting and financial transactions,'' and the lobbying section of 
    the certification form prescribed above applies to applicants/bidders 
    for grants, cooperative agreements, and contracts for more than 
    $100,000, and loans and loan guarantees for more than $150,000, or the 
    single family maximum mortgage limit for affected programs, whichever 
    is greater; and
        (4) Anti-lobbying Disclosures. Any applicant that has paid or will 
    pay for lobbying using any funds must submit an SF-LLL, ``Disclosure of 
    Lobbying Activities,'' (OMB Control Number 0348-0046) as required under 
    15 CFR Part 28, Appendix B.
        Recipients shall require applicants/bidders for subgrants, 
    contracts, subcontracts, or other lower tier covered transactions at 
    any tier under the grant award to submit, if applicable, a completed 
    Form CD-512, ``Certifications Regarding Debarment, Suspension, 
    Ineligibility and Voluntary Exclusion-Lower Tier Covered Transactions 
    and Lobbying'' and disclosure form, SF-LLL, ``Disclosure of Lobbying 
    Activities.'' Form CD-512 is intended for the use of recipients and 
    should not be transmitted to the Department. SF-LLL submitted by any 
    tier recipient or subrecipient should be submitted to the Department in 
    accordance with the instructions contained in the award document.
        If an application is selected for funding, the Department of 
    Commerce has no obligation to provide any additional future funding in 
    connection with that award. Renewal of an award to increase funding or 
    extend the period of performance is at the total discretion of the 
    Department.
        Recipients and subrecipients are subject to all Federal laws and 
    Federal and DOC policies, regulations, and procedures applicable to 
    Federal assistance awards. In addition, unsatisfactory performance by 
    the applicant under prior Federal awards may result in the application 
    not being considered for funding.
        If applicants incur any costs prior to an award being made, they do 
    so solely at their own risk of not being reimbursed by the Government. 
    Notwithstanding any verbal or written assurance that they have 
    received, there is no obligation on the part of the Department to cover 
    preaward costs.
        No award of Federal funds shall be made to an applicant who has an 
    outstanding delinquent Federal debt until either: (1) the delinquent 
    account is paid in full; (2) a negotiated repayment schedule is 
    established and at least one payment is received, or (3) other 
    arrangements satisfactory to the Department are made.
        Applicants are reminded that a false statement on the application 
    may be grounds for denial or termination of funds and grounds for 
    possible punishment by a fine or imprisonment as provided in 18 U.S.C. 
    1001.
        Special Note: NTIA has established a policy which is intended to 
    encourage stations to increase from 25 percent to 50 percent the 
    matching percentage for those proposals that call for equipment 
    replacement, improvement, or augmentation (PTFP Policy Statement, (56 
    FR 59168 (1991)). The presumption of 50 percent funding will be the 
    general rule for the replacement, improvement or augmentation of 
    equipment A showing of extraordinary need (i.e. small community-
    licensee stations or a station that is licensed to a large institution 
    [e.g., a college or university] documenting that it does not receive 
    direct or in-kind support from the larger institution) or an emergency 
    situation will be taken into consideration as justification for grants 
    of up to 75 percent of the total project cost for such projects.
        A point of clarification is in order: NTIA expects to continue 
    funding projects to activate stations or to extend service at up to 75 
    percent of the total project cost. NTIA will do this because applicants 
    proposing to provide first service to a geographic area ordinarily 
    incur considerable costs that are not eligible for NTIA funding. The 
    applicant must cover the ineligible costs including those for 
    construction or renovation of buildings and other similar expenses.
        Since NTIA has limited funds for the PTFP program, the PTFP Final 
    Rules published November 8, 1996 modified NTIA's policy regarding the 
    funding of planning applications. Our policy now includes the general 
    presumption to fund planning projects at no more than 75 percent of the 
    project costs. NTIA notes that most of the planning grants awarded by 
    PTFP in recent years include matching in-kind services and funds 
    contributed by the grantee. The new NTIA policy therefore codifies what 
    already has become PTFP practice. NTIA, however, is mindful that 
    planning grants are sometimes the only resource that emerging community 
    groups have with which to initiate the planning of new facilities in 
    unserved areas. We therefore will continue to award up to 100 percent 
    of total project costs in cases of extraordinary need (e.g. small 
    community group proposing to initiate new public telecommunication 
    service).
        We wish to take this opportunity to restate the policy published in 
    the
    
    [[Page 60195]]
    
    November 22, 1991, PTFP Policy Statement (56 FR 59168 (1991)), 
    regarding applicants' use of funds from the Corporation for Public 
    Broadcasting (CPB) to meet the local match requirements of the PTFP 
    grant. NTIA continues to believe that the policies and purposes 
    underlying the PTFP requirements could be significantly frustrated if 
    applicants routinely relied upon another Federally supported grant 
    program for local matching funds. Accordingly, NTIA has limited the use 
    of CPB funds for the non-Federal share of PTFP projects to 
    circumstances of ``clear and compelling need'' (15 CFR 
    Sec. 2301.6(c)(2)). NTIA intends to maintain that standard and to apply 
    it on a case-by-case basis.
    
    II. Digital Broadcasting
    
        The FCC's adoption of the Fifth Report and Order in April 1997 
    requires that all public television stations begin the broadcast of a 
    digital signal by May 1, 2003. NTIA believes that it is critical that 
    all public television applicants fully consider digital technology in 
    any request for equipment replacement submitted to PTFP. Any public 
    television applicant must describe whether it has a plan for digital 
    conversion to meet the FCC's mandate and whether the requested 
    equipment is consistent with that plan. If the applicant is developing 
    a plan for digital conversion, the application should address how the 
    requested equipment will be consistent with the overall objective of 
    converting the facility for digital broadcasting.
        NTIA recognizes that digital technology will be an important means 
    for the more efficient creation and distribution of programming in the 
    future. Consequently, public broadcasters seeking to replace, upgrade, 
    and buy new equipment that employs digital technology will be 
    permitted, when appropriate, to use PTFP funds for such purposes.
        For fiscal year 1998, NTIA awarded $12.5 million in funds to 50 
    projects which assisted public television stations in the conversion to 
    digital technologies. The awards ranged from $36,405 to $967,400. The 
    use of digital technologies is also appropriate for public radio 
    facilities. NTIA funded projects for digital STL's and audio production 
    equipment which will assist public radio stations as they prepare for 
    conversion to digital technologies. These digital projects are funded 
    as equipment replacement, improvement or augmentation projects with the 
    presumption of a 50 percent Federal share as noted earlier, unless a 
    showing of extraordinary need for a higher percentage has been made 
    pursuant to Sec. 2301.6(b)(ii) of the PTFP Rules.
    
    III. Distance Learning Projects
    
        The growth of digital technologies provides new opportunities for 
    distance learning projects using both broadcast (e.g., the multi-
    channel capabilities of DTV) or nonbroadcast facilities. Since 1979, 
    NTIA has funded nonbroadcast distance learning projects through the 
    ``Special Applications'' category as established in Sec. 2301.4(a) of 
    the PTFP Rules. In 1996, NTIA established a similar category for 
    broadcast projects, ``Broadcast/other'' in Sec. 2301.4(b)(6). NTIA 
    encourages applications in either category for innovative or unique 
    distance learning projects which address demonstrated and substantial 
    community needs.
        For fiscal year 1998, NTIA awarded $3.67 million in funds to 12 
    grants for distance learning projects. The awards ranged from $55,452 
    to $594,936.
        The November 22, 1991, PTFP Policy Statement (56 FR 59168 (1991)) 
    mentioned in the Application Forms and Regulations section discussed a 
    number of issues of particular relevance to applicants proposing 
    nonbroadcast educational and instructional projects and potential 
    improvement of nonbroadcast facilities. These policies remain in effect 
    and will be available to all PTFP applicants as part of the Guidelines 
    for preparing FY 1999 PTFP applications.
    
    IV. Eligible and Ineligible Costs
    
        Eligible equipment for the 1999 grant round includes apparatus 
    necessary for the production, interconnection, captioning, broadcast, 
    or other distribution of programming, including but not limited to 
    studio equipment; audio and video storage, processing, and switching 
    equipment; terminal equipment; towers; antennas; transmitters; remote 
    control equipment; transmission line; translators; microwave equipment; 
    mobile equipment; satellite communications equipment; instructional 
    television fixed service equipment; subsidiary communications 
    authorization transmitting and receiving equipment; cable television 
    equipment; and optical fiber communications equipment.
        The following list provides clarification regarding several 
    equipment and other cost areas that will be helpful in preparing 
    applications. NTIA also reserves the right to eliminate any costs, 
    whether specified here or not, that it determines are not appropriate 
    prior to the awarding of a grant.
    
    A. Equipment and Supplies
    
        (1) Buildings and Modifications to Buildings. (a) Eligible: Small 
    equipment shelters that are part of satellite earth stations, 
    translators, microwave interconnection facilities, and similar 
    facilities. (b) Ineligible: Purchase or lease of buildings and 
    modifications to buildings, including the renovation of space for 
    studios intended to house eligible equipment; costs associated with 
    removing old equipment.
        (2) Land and Land Improvements. (a) Eligible: Site preparation 
    necessary to construct towers and guy anchors for transmission and 
    interconnection equipment. (b) Ineligible: Purchase or lease of land.
        (3) Moving Costs. (a) Eligible: Shipping and delivery charges for 
    equipment acquired within the award. (b) Ineligible: Moving costs 
    required by relocation of any facilities.
        (4) Reception Equipment. (a) Eligible: Fixed frequency demodulator, 
    as required by good engineering practice for monitoring the off-air 
    transmission of signals; subcarrier demodulator; telemetry transmitters 
    and receivers; satellite receivers; and subcarrier decoders for the 
    handicapped. (b) Ineligible: Consumer-type TV sets and FM receivers.
        (5) Tower Modifications. (a) Eligible: Strengthening or modifying a 
    commercial entity's tower to accommodate a public broadcasting entity 
    (structural modifications on towers and/or antenna changes must meet 
    EIA (Electronic Industries Association) and any required local 
    standards). (b) Ineligible: Modifying or strengthening the applicant's 
    tower to accommodate a commercial entity.
        (6) Production and Control Room Equipment. (a) Eligible: Standard 
    production studio and control room equipment for TV or radio program 
    production. (b) Ineligible: Consumer-type mixers, tape recorders, 
    turntables, CD players, etc; ancillary production devices such as 
    stopwatches and stop-clocks, building lights, sound effects, scenery 
    and props, cycloramas, sound insulation devices and materials, 
    draperies and related equipment for production use, film and still 
    photography processing, film sound synchronization editing.
        (7) Video Equipment. (a) Eligible: Videotape editing and processing 
    equipment that conforms to broadcast-standard quality equipment for 
    field recording and production editing. (b) Ineligible: Consumer level 
    videotape recording formats not accepted in the industry as broadcast-
    standard quality.
        (8) Furniture and Office Equipment. (a) Eligible: Consoles required 
    to mount
    
    [[Page 60196]]
    
    equipment such as audio consoles and video switchers. (b) Ineligible: 
    Such items as office furniture, office equipment, studio clocks and 
    systems, blackboards, office intercoms, equipment inventory labels and 
    label-makers, word processors, telephone systems, and printing and 
    duplication equipment.
        (9) Expendable Items and Spare Parts. (a) Eligible: A transmitter 
    spare parts kit and one set of final and driver tubes for a transmitter 
    awarded in the grant; a spare parts kit for video tape recorders 
    awarded in the grant. (b) Ineligible: Spare lenses, spare circuit 
    components, spare parts kits for studio equipment, except as noted 
    above; recording tape, film, reels, cartridge tapes, records, compact 
    discs, and record or tape cleaning equipment; art and graphics 
    supplies; maintenance supplies, including replacement final and driver 
    tubes normally considered in the industry as normal maintenance-budget-
    provided items and similar items.
        (10) Backup Equipment. (a) Eligible: Hot standby or backup 
    microwave for the main studio-to-transmitter link only; a backup or 
    spare exciter for a television transmitter, as required by good 
    engineering practice. (b) Ineligible: Redundant equipment, such as 
    spare transmitters, or costs associated with them, as well as backup 
    microwave equipment (except as noted above).
        (11) Electric Power. (a) Eligible: Generally, all primary power 
    costs from the output of the main power meter panel; regulators and 
    surge protectors, as required by good engineering practice, to 
    stabilize transmitter RF output. Where primary power is not available 
    or is unusable for broadcast, then PTFP may provide funding for those 
    devices needed to power the facility if the need for that equipment is 
    fully documented in the application. (b) Ineligible: Costs of 
    installing primary power to the facility, including transformers, power 
    lines, gasoline or diesel powered generators, and related equipment.
        (12) Test and Maintenance Equipment. (a) Eligible: Required test 
    equipment, as indicated by good engineering practice for the 
    maintenance of the project equipment. (b) Ineligible: Maintenance 
    equipment such as hand and power tools, storage cabinets, and 
    maintenance services.
        (13) Air Conditioning and Ventilation. (a) Eligible: The costs to 
    provide ventilation of eligible project equipment, such as ducting for 
    transmitters and transmitter air conditioning, as required by good 
    engineering practice. (b) Ineligible: Unless exceptionally well-
    documented, air conditioning for control rooms, or equipment rooms, 
    studios, mobile units, and other operational rooms and offices.
        (14) Remote Vans. (a) Eligible: Items to equip a remote van for 
    audio/video production. (b) Ineligible: All vehicles.
    
    B. Other Costs
    
        (1) Construction Applications: NTIA generally will not fund salary 
    expenses, including staff installation costs, and pre-application legal 
    and engineering fees. Certain ``pre-operational expenses'' are eligible 
    for funding. (See 15 CFR Sec. 2301.2.) Despite this provision, NTIA 
    regards its primary mandate to be funding the acquisition of equipment 
    and only secondarily funding of salaries. A discussion of this issue 
    appears in the PTFP Final Rules under the heading Support for Salary 
    Expenses in the introductory section of the document.
        (2) Planning Applications. (a) Eligible: Salaries are eligible 
    expenses for all planning grant applications, but should be fully 
    described and justified within the application. Planning grant 
    applicants may lease office equipment, furniture and space, and may 
    purchase expendable supplies under the terms of 47 U.S.C. Sec. 392 (c). 
    (b) Ineligible: Planning grant applications cannot include the cost of 
    constructing or operating a telecommunications facility.
        (3) Audit Costs. Audits shall be performed in accordance with audit 
    requirements contained in Office of Management and Budget Circular A-
    133, Audits of States, Local Governments, and Non-Profit Organizations, 
    revised June 30, 1997. OMB Circular A-133 requires that non-profit 
    organizations, government agencies, Indian tribes and educational 
    institutions expending more than $300,000 in federal funds during a 
    one-year period conduct a single audit in accordance with guidelines 
    outlined in the circular. Applicants are reminded that other audits may 
    be conducted by the Office of Inspector General.
        NTIA recognizes that most of its grant recipients are divisions of 
    state and local governments or are public broadcasting facilities, all 
    of which routinely conduct annual audits. In order to make the maximum 
    amount of monies available for equipment purchases and planning 
    activities, NTIA will therefore only fund audit costs in exceptional 
    circumstances.
    
    V. Notice of Applications Received
    
        In accordance with 15 CFR Sec. 2301.13, NTIA will publish a notice 
    in the Federal Register listing all applications received by the 
    Agency. Listing an application in such a notice merely acknowledges 
    receipt of an application to compete for funding with other 
    applications. Publication does not preclude subsequent return of the 
    application for the reasons discussed under the Dates section above, or 
    disapproval of the application, nor does it assure that the application 
    will be funded. The notice will also include a request for comments on 
    the applications from any interested party.
    
    VI. Evaluation Process
    
        See 15 CFR Sec. 2301.16 for a description of the Technical 
    Evaluation and 15 CFR Sec. 2301.17 for the Evaluation Criteria.
    
    VII. Selection Process
    
        Based upon the above cited evaluation criteria, the PTFP program 
    staff prepares summary recommendations for the PTFP Director. These 
    recommendations incorporate outside reviewers rankings and 
    recommendations, engineering assessments, and input from the National 
    Advisory Panel, State Single Point of Contacts and state 
    telecommunications agencies. Staff recommendations also consider 
    project impact, the cost/benefit of a project and whether review panels 
    have consistently applied the evaluation criteria. The PTFP Director 
    will consider the summary recommendations prepared by program staff, 
    will recommend the funding order of the applications, and will present 
    recommendations to the OTIA (Office of Telecommunications and 
    Information Applications) Associate Administrator for review and 
    approval. The PTFP Director recommends the funding order for 
    applications in three categories: ``Recommended for Funding,'' 
    ``Recommended for Funding if Funds Available,'' and ``Not Recommended 
    for Funding.'' See 15 CFR Sec. 2301.18 for a description of the 
    selection factors retained by the Director, OTIA Associate 
    Administrator, and the Assistant Secretary for Telecommunications and 
    Information.
        Upon review and approval by the OTIA Associate Administrator, the 
    Director's recommendations will then be presented to the Selection 
    Official, the NTIA Administrator. The NTIA Administrator selects the 
    applications for possible grant award taking into consideration the 
    Director's recommendations and the degree to which the slate of 
    applications, taken as a whole, satisfies the program's stated purposes 
    set forth at 15 CFR Sec. 2301.1(a) and (c). Prior to award, 
    applications may be negotiated between PTFP staff and the applicant to 
    resolve whatever differences might exist between the
    
    [[Page 60197]]
    
    original request and what PTFP proposes to fund. Some applications may 
    be dropped from the proposed slate due to lack of Federal 
    Communications Commission licensing authority, an applicant's inability 
    to make adequate assurances or certifications, or other reasons. 
    Negotiation of an application does not ensure that a final award will 
    be made. The PTFP Director recommends final selections to the NTIA 
    Administrator applying the same factors as listed in 15 CFR 
    Sec. 2301.18. The Administrator then makes the final award selections 
    taking into consideration the Director's recommendations and the degree 
    to which the slate of applications, taken as a whole, satisfies the 
    program's stated purposes in 15 CFR Sec. 2301.1 (a) and (c).
    
    VIII. Project Period
    
        Planning grant award periods customarily do not exceed one year, 
    whereas construction grant award periods commonly range from one to two 
    years. Although these time frames are generally applied to the award of 
    all PTFP grants, variances in project periods may be based on specific 
    circumstances of an individual proposal.
    
        Authority: The Public Telecommunications Financing Act of 1978, 
    as amended, 47 U.S.C. Secs. 390-393, 397-399(b).
    
    (Catalog of Federal Domestic Assistance No. 11.550)
    Bernadette McGuire-Rivera,
    Associate Administrator, Office of Telecommunications and Information 
    Applications.
    [FR Doc. 98-29776 Filed 11-5-98; 8:45 am]
    BILLING CODE 3510-60-P
    
    
    

Document Information

Published:
11/06/1998
Department:
National Telecommunications and Information Administration
Entry Type:
Notice
Action:
Notice of availability of funds.
Document Number:
98-29776
Dates:
Pursuant to 15 CFR Sec. 2301.8(b), the Administrator of NTIA hereby establishes the closing date for the filing of applications for grants under the PTFP. The closing date selected for the submission of applications for 1999 is January 14, 1999. Applications must be received prior to 8 p.m. on or before January 14, 1999. Applicants sending an application should submit an original and five copies to the
Pages:
60192-60197 (6 pages)
Docket Numbers:
Docket No. 981028269-8269-01
RINs:
0660-ZA05
PDF File:
98-29776.pdf
CFR: (2)
15 CFR 2301.6(c)(2))
15 CFR 2301.18