2013-06428. Drawbridge Operation Regulation; Elizabeth River, Eastern Branch, Norfolk, VA  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Final rule.

    SUMMARY:

    The Coast Guard is adopting an interim drawbridge rule published in August 2012 as a final rule for the Berkley (I-264) Bridge, at mile 0.4, across the Eastern Branch of the Elizabeth River, Norfolk, VA. This rule, allowing only four scheduled bridge openings during the day, is necessary to alleviate heavy vehicular traffic delays throughout the day and secondary congestion during the afternoon rush hour, while still providing for the reasonable needs of navigation.

    DATES:

    Effective April 19, 2013.

    ADDRESSES:

    Comments and related materials received from the public, as well as documents mentioned in this preamble as being available in the docket, are part of docket USCG-2012-0357 and are available online by going to www.regulations.gov,, and inserting USCG-2012-0357 in the “Search” box, and then clicking “Search”. This material is also available for inspection or copying at the Docket Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    If you have questions on this rule, call or email Terrance A. Knowles, Bridge Administration Branch, Fifth Coast Guard District, telephone (757) 398-6587, email terrance.a.knowles@uscg.mil. If you have questions on viewing or submitting material to the docket, call Docket Operations, telephone 202-366-9826.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Table of Acronyms

    CFR Code of Federal Regulations

    DHS Department of Homeland Security

    FR Federal Register

    U.S.C. United States Code

    VDOT Virginia Department of Transportation

    VMA Virginia Maritime Association

    A. Regulatory History and Information

    On August 30, 2012, we published an interim rule (IR) entitled, “Drawbridge Operation Regulations; Elizabeth River, Eastern Branch, Norfolk, VA” in the Federal Register (77 FR 52599). We received 545 comments on the proposed rule. No public meeting was requested, and none was held.

    Other Related Regulatory Action: The following table describes regulatory actions related to this bridge. A discussion of those actions follows.

    Table 1—Rulemakings

    DateActionFR CiteDrawbridge operation regs. (Docket No.)
    10/09/2009Temporary Deviation74 FR 52143USCG-2009-0754.
    10/09/2009Proposed Rulemaking (NPRM)74 FR 52158USCG-2009-0754.
    03/03/2010Temporary Deviation75 FR 9521USCG-2010-0083.
    03/03/2010Supplemental NPRM75 FR 9557USCG-2009-0754.
    08/06/2010Temporary Final Rule75 FR 47461USCG-2009-0754.
    08/30/2012Interim Rule77 FR 52599USCG-2012-0357.

    On October 9, 2009, we published a notice of temporary deviation request for comments entitled; “Drawbridge Operation Regulations; Elizabeth River, Eastern Branch, Norfolk, VA” in the Federal Register (74 FR 52143) and a notice of proposed rulemaking (NPRM) entitled “Drawbridge Operation Regulation; Elizabeth River, Eastern Branch, Norfolk, VA” in the Federal Register (74 FR 52158). We received 861 comments for both the temporary deviation and NPRM. No public meeting was requested then, and none was held.

    On March 3, 2010, we published a notice of temporary deviation request for comments entitled; “Drawbridge Operation Regulations; Elizabeth River, Eastern Branch, VA” in the Federal Register (75 FR 9521) and a supplemental notice of proposed rulemaking (SNPRM) entitled “Drawbridge Operation Regulations; Elizabeth River, Eastern Branch, Norfolk, VA” in the Federal Register (75 FR 9557). That time we received four comments on the published deviation and SNPRM. No public meeting was requested then, and none was held.

    On August 6, 2010, we published a temporary final rule entitled “Drawbridge Operation Regulations; Elizabeth River, Eastern Branch, Norfolk, VA” in the Federal Register (75 FR 47461) that temporarily changed the drawbridge operation regulations effective from 9 a.m. on September 4, 2010, until 2:30 p.m. on October 5, 2012.

    The establishment of the recent interim rule, effective since October 6, 2012, and the previous temporary final rule, with its similar operating rules/provisions, which was in effect since September 4, 2010, did not place any additional constraints on the waterway users because mariners already used the temporary schedule for almost two years and could still plan their trips in accordance with the scheduled bridge openings. Any operating schedule that would revert back to the previous on-demand operation of the drawbridge would produce a tremendous amount of delay. Prior to these four scheduled daytime openings, delays for motorists were unpredictable and were expected to increase with population growth and any increase in associated traffic.

    B. Basis and Purpose

    VDOT, which owns and operates the bascule-type Berkley Bridge, requested a Start Printed Page 17091permanent change to the bridge regulations. This final rule makes permanent those temporary regulations currently in effect in the interim rule.

    The Berkley Bridge is the principle arterial route in and out of the City of Norfolk and serves as the major evacuation highway in the event of emergencies. In the closed to navigation position, the Berkley Bridge has a vertical clearance of 48 feet above mean high water. Vessel traffic on this portion of the Elizabeth River waterway consists of pleasure craft, tug and barge traffic, and ships with assist tugs seeking repairs. There is no alternate waterway route.

    The regulation set out in Title 33 CFR 117.1007 (b) allows the Berkley Bridge, mile 0.4, in Norfolk, Virginia to remain closed one hour prior to the published start of a scheduled marine event regulated under § 100.501, and remain closed until one hour following the completion of the event unless the Patrol Commander designated under § 100.501 allows the bridge to open for commercial vessel traffic. In addition, the bridge shall open on signal any time except from 5 a.m. to 9 a.m. and from 3 p.m. to 7 p.m., Monday through Friday, except Federal holidays, and shall open at any time for vessels with a draft of 18 feet or more, provided that at least 6 hours advance notice has been given to the Berkley Bridge Traffic Control Room at (757) 494-2490 as required by 33 CFR 117.1007 (c).

    The interim rule, which modified the above schedule, became effective on October 6, 2012. During the interim rule regulation, the draw shall remain closed one hour prior to the published start of a scheduled marine event regulated under § 100.501, and remain closed until one hour following the completion of the event unless the Patrol Commander designated under § 100.501 allows the bridge to open for commercial vessel traffic. The draw shall open on signal at any time for vessels carrying, in bulk, cargoes regulated by 46 CFR subchapters D or O, or Certain Dangerous Cargoes as defined in 33 CFR 160.204. For all other vessels, the draw shall open on signal at any time, except from 5 a.m. to 7 p.m., Monday through Friday, except Federal holidays. During these times, the draw shall open for commercial vessels with a draft of 18 feet or more, provided at least 6 hours notice was given to the Berkley Bridge Traffic Control room at (757) 494-2490; open on signal at 9 a.m., 11 a.m., 1 p.m. and 2:30 p.m.; and if the bridge is not opened during a particular scheduled opening and a vessel has made prior arrangements for a delayed opening, the draw tender may provide a single opening up to 30 minutes past that scheduled opening time for that signaling vessel, except at 2:30 p.m. The draw tender may provide a single opening up to 20 minutes past the 2:30 p.m. scheduled opening time for a signaling vessel that made prior arrangements for a delayed opening. A vessel may make prior arrangements for a delayed opening by contacting the Berkley Bridge Traffic Control room at (757) 494-2490.

    This final rule will make the interim final rule opening procedures permanent. Due to this, we anticipate less vehicular traffic congestion between 9 a.m. and 3 p.m., while causing fewer secondary back-ups during rush hours, as compared to increased traffic congestion when the bridge opened on signal.

    In 2009, prior to implementing the temporary regulation, a Test Deviation published in the Federal Register (74 FR 52143) was issued to allow VDOT to test the proposed schedule and to obtain data and public comments. During that Test Deviation period, a count of the delayed vessels during the closure periods was taken to ensure the regulation would not have a significant impact on navigation. The monthly vehicular traffic counts submitted by VDOT for the last quarter of calendar year 2008 showed the average daily traffic volumes at the Berkley Bridge (See Table A):

    Table A

    OCT 200883,296 vehicles.
    NOV 200899,643 vehicles.
    DEC 2008106,856 vehicles.

    The traffic counts revealed that from October 2008 to December 2008, the Berkley Bridge experienced a seven percent (or 23,560-car) increase in vehicular traffic flow. The Coast Guard believes that the increase was due to the previously referenced temporary closure of two Norfolk-area bridges and that vehicular traffic will subside when those bridges return to service.

    The Coast Guard received 861 comments on both the temporary deviation and NPRM originally proposed in 2009. A large majority of the responses from commuters were in support of the scheduled opening set-up. However, the local maritime community expressed some objections to the schedule change to vessels.

    After review of all of the comments and bridge-related data received, the Coast Guard had determined that an alternative proposal should be considered.

    From September 4, 2010, to October 5, 2012, a temporary final rule (75 FR 47461, August 6, 2010) introduced changes that allowed for the draw of the Berkley Bridge to open on signal for the proposed drawbridge openings (scheduled during the daytime) which expected to similarly cause a decrease in traffic congestion. Concurrent with the publication of the SNPRM (75 FR 9557, March 3, 2010), another Test Deviation (75 FR 9521, March 3, 2010) was issued to allow VDOT to test another proposed schedule and to acquire additional data and public comments.

    The Coast Guard received four responses to the SNPRM and the second temporary deviation, one each by letter and to the Web site at www.regulations.gov along with two emails, all of which were considered in the interim rule (77 FR 52599, August 30, 2012).

    The VMA, which represents waterborne commerce in the Port of Hampton Roads, responded in writing with its support of the revised regulation and its statement that the current operating regulation incorporates the minimum degree of flexibility that the maritime industry can accept. VDOT also indicated that the new Berkley Bridge operating regulation had improved the flow of vehicular traffic while still meeting the minimum needs of navigation.

    VMA, VDOT and two private citizens expressed concerns about unscheduled openings that caused vehicular traffic congestion. The unscheduled openings were provided for Government vessels and vessels with a draft of 18 feet or more that provided at least 6 hours advance notice and for vessels hauling dangerous cargo.

    The Coast Guard reviewed the bridge data supplied by VDOT. The information indicated that during the deviation test period (from March 10, 2010, to September 3, 2010), that a total of 260 potential bridge openings for vessels could have been provided Monday through Friday, except Federal holidays, at 9 a.m., 11 a.m., 1 p.m. and 2:30 p.m. The data showed the bridge only opened 88 times of the 260 potential openings. The data also revealed that seven bridge openings were provided just about 15 minutes past the scheduled opening time at 9 a.m., 11 a.m. and 1 p.m. and that the average opening usually lasted 12 minutes; a later opening at 2:30 p.m. would add to the traffic congestion during the rush hour. However, due to good communication with the general public by using road signs and broadcasts, there was only one opening Start Printed Page 17092that occurred after 2:45 p.m. A majority of those openings were provided primarily for commercial vessels, with a maximum of four vessels transiting through a single bridge opening. The subsequent changes to the operating procedures appear to have reduced vehicular traffic congestion while still providing for the reasonable needs of navigation. Based on the information provided, the revised temporary rule was implemented with no changes to the SNPRM.

    Between October 2010 and January 2012, from 9 a.m. and 3 p.m., according to data provided by VDOT, the Berkley Bridge averaged approximately 6,533 vehicles per hour which ranks it among the most heavily traveled routes in the region (See Table B).

    Table B—Average Daily Vehicular Traffic Count

    Hourly totalOct 2010Jan 2011May 2011Aug 2011Jan 2012Average
    9AM-10AM6,5096,2306,5456,3355,9566,315
    10AM-11AM6,2486,0746,3626,3835,8986,193
    11AM-12PM6,4436,0086,4576,4395,9276,255
    12PM-1PM6,7146,5836,7816,7806,2836,628
    1PM-2PM6,8606,3456,7666,7606,2496,596
    2PM-3PM7,3307,1337,3617,2107,0327,213
    Total40,10338,37340,27039,90637,34539,199
    Overall hourly average—6,533.

    The temporary regulation schedule provided four bridge lift opportunities each weekday between 9 a.m. and 3 p.m. This equated to a maximum of 88 lifts per month (assuming 22 workdays per month). Since October 2010, there has been an average of only 24 requested lifts per month—a usage rate of only 27% of capacity (See Table C).

    Table C—Bridge Opening Counts

    20102010201020112011201120112011201120112011201120112011201120122012Monthly averageTotal  
    OctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFeb
    30152328272923222820921193415233523.6401

    Bridge Opening Average Duration

    [In minutes]

    20102010201020112011201120112011201120112011201120112011201120122012Monthly average
    OctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFeb
    10.09.99.78.99.49.19.08.910.210.19.310.09.19.18.710.112.39.6

    Prior to execution of the temporary regulation period, the average duration of a bridge lift was approximately 15 minutes. Throughout the same periods, the average duration of bridge lifts has been 9.6 minutes—a reduction of 5.4 minutes per lift.

    The temporary closures of two Norfolk-area bridges, forced increased use of the Berkley Bridge by vehicular traffic. Now with those bridges completed there is some temporary traffic relief, but VDOT suggests that the Berkley Bridge and its approaches will still experience back-ups, delays, and congestion, due to increased traffic and population growth. The Hampton Roads Planning District Commission projected a population growth of 31% by 2034. This continued increase in traffic volume in Norfolk and at the Berkley Bridge is not expected to decrease in the future. The interim rule draw opening schedule has helped to decrease the average bridge opening times, and the rule has led to only 27% of the available opening time being utilized by mariners. Adopting the interim rule as final will help to mitigate future adverse impacts caused by the increased traffic congestion.

    Assuming no reduction in maritime traffic volume, this reduction in lift duration has resulted in a significant efficiency increase in the use of time the bridge is actually opened for vessels and a significant reduction in delays to vehicular traffic during vessel openings. The reduction in lift duration combined with the predictability of scheduled lifts optimally balances the competing demands of both road and waterway users.

    C. Discussion of Comments, Changes, and the Final Rule

    The Coast Guard is adopting as final the interim rule (77 FR 52604, August 30, 2012) without changes, permanently amending the regulations governing the Berkley Bridge, mile 0.4, at Norfolk, Virginia, at 33 CFR 117.1007, by revising paragraph (b)(2) to read as follows: The draw shall open on signal at any time for vessels carrying, in bulk, cargoes regulated by 46 CFR subchapters D or O, or Certain Dangerous Cargoes as defined in 33 CFR 160.204; For all other vessels, the draw shall open on signal at any time, except from 5 a.m. to 7 p.m., Monday through Friday, except Federal holidays. During these times, the draw shall open for commercial vessels with a draft of 18 feet or more, provided at least 6 hours notice was given to the Berkley Bridge Traffic Control room at (757) 494-2490; open on signal at 9 a.m., 11 a.m., 1 p.m. and 2:30 p.m.; and if the bridge is not opened during a particular scheduled opening and a vessel has made prior arrangements for a delayed opening, the draw tender may provide a single opening up to 30 minutes past that scheduled opening time for that signaling vessel, except at 2:30 p.m. The draw tender may provide a single opening up to 20 minutes past the 2:30 p.m. scheduled opening time for a Start Printed Page 17093signaling vessel that made prior arrangements for a delayed opening. A vessel may make prior arrangements for a delayed opening by contacting the Berkley Bridge Traffic Control room at (757) 494-2490.

    The Coast Guard believes that this permanent change is necessary to help reduce current and future vehicular traffic congestion throughout the day and during rush hour time periods. Results of studies conducted since the temporary regulation went into effect in September 2010 confirm that scheduled lifts have decreased congestion without negatively impacting waterway users. Scheduled lifts, according to the statistics, are currently being utilized well under capacity by the maritime public. Furthermore, waterway users are accustomed to this schedule, as it has been in effect since September 2010.

    The Coast Guard provided 32 days for comment on the interim rule and received 545 total comments (533 public e-comments from www.regulations.gov,, 11 phone calls, and one email message). Of the 545 comments, 544 overwhelmingly supported the regulation, and only one individual wanted the bridge to open on demand. Several of the 544 supporting comments wanted the schedule to be stricter on navigation by only allowing openings at night, or by lessening the number of openings during the day, or by adjusting the scheduled opening time by fifteen minutes to avoid additional rush hour impacts.

    There were two comments from known waterway users. The first commenter, whose business is located along the Eastern Branch of the Elizabeth River, opined that the interim opening schedule to be a reasonable compromise and should be retained. The second commenter stated that all drawbridges should open on-demand due to the excessive expense put on mariners while waiting hours for a few commuters.

    As previously stated, the vast majority of respondents supported the predictability of scheduled lifts during the day that will optimally balances the competing demands of both waterway users and the excessively high numbers of vehicles on the roadway.

    D. Regulatory Analyses

    We developed this final rule after considering numerous statutes and executive orders related to rulemaking. Below we summarize our analyses based on a number of these statutes or executive orders.

    1. Regulatory Planning and Review

    This rule is not a “significant regulatory action” under section 3(f) of Executive Order 12866, Regulatory Planning and Review, as supplemented by Executive Order 13563, Improving Regulation and Regulatory Review, and does not require an assessment of potential costs and benefits under section 6(a)(3) of Order 12866 or under section 1 of Executive Order 13563. The Office of Management and Budget has not reviewed it under those Orders.

    We reached this conclusion based on the fact that the changes have only a minimal impact on maritime traffic transiting the bridge. Mariners can plan their trips in accordance with the scheduled bridge openings, to minimize delays. This regulation will allow the provisions of the interim rule to be made permanent.

    2. Impact on Small Entities

    The Regulatory Flexibility Act of 1980 (RFA), 5 U.S.C. 601-612, as amended, requires federal agencies to consider the potential impact of regulations on small entities during rulemaking. The term “small entities” comprises small businesses, not-for-profit organizations that are independently owned and operated and are not dominant in their fields, and governmental jurisdictions with populations of less than 50,000. The Coast Guard received 0 comments from the Small Business Administration on this rule. The Coast Guard certifies under 5 U.S.C. 605(b) that this rule will not have a significant economic impact on a substantial number of small entities.

    This action will not have a significant economic impact on a substantial number of small entities because the rule only adds minimal restrictions to the movement of navigation, in allowing four scheduled openings during the day. Mariners who plan their transits in accordance with the scheduled bridge openings can minimize delay. Additionally, vessels that can pass under the bridge without a bridge opening may do so at all times. Before the effective period, we will issue maritime advisories widely available to users of the river.

    3. Assistance for Small Entities

    Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act of 1996 (Pub. L. 104-121), we want to assist small entities in understanding this rule. If the rule would affect your small business, organization, or governmental jurisdiction and you have questions concerning its provisions or options for compliance, please contact the person listed in the FOR FURTHER INFORMATION CONTACT, above.

    Small businesses may send comments on the actions of Federal employees who enforce, or otherwise determine compliance with, Federal regulations to the Small Business and Agriculture Regulatory Enforcement Ombudsman and the Regional Small Business Regulatory Fairness Boards. The Ombudsman evaluates these actions annually and rates each agency's responsiveness to small business. If you wish to comment on actions by employees of the Coast Guard, call 1-888-REG-FAIR (1-888-734-3247). The Coast Guard will not retaliate against small entities that question or complain about this rule or any policy or action of the Coast Guard.

    4. Collection of Information

    This rule calls for no new collection of information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520.).

    5. Federalism

    A rule has implications for federalism under Executive Order 13132, Federalism, if it has a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government. We have analyzed this rule under that Order and have determined that it does not have implications for federalism.

    6. Protest Activities

    The Coast Guard respects the First Amendment rights of protesters. Protesters are asked to contact the person listed in the “For Further Information Contact” section to coordinate protest activities so that your message can be received without jeopardizing the safety or security of people, places or vessels.

    7. Unfunded Mandates Reform Act

    The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) requires Federal agencies to assess the effects of their discretionary regulatory actions. In particular, the Act addresses actions that may result in the expenditure by a State, local, or tribal government, in the aggregate, or by the private sector of $100,000,000 (adjusted for inflation) or more in any one year. Though this rule will not result in such an expenditure, we do discuss the effects of this rule elsewhere in this preamble.Start Printed Page 17094

    8. Taking of Private Property

    This rule would not cause a taking of private property or otherwise have taking implications under Executive Order 12630, Governmental Actions and Interference with Constitutionally Protected Property Rights.

    9. Civil Justice Reform

    This rule meets applicable standards in sections 3(a) and 3(b)(2) of Executive Order 12988, Civil Justice Reform, to minimize litigation, eliminate ambiguity, and reduce burden.

    10. Protection of Children

    We have analyzed this rule under Executive Order 13045, Protection of Children from Environmental Health Risks and Safety Risks. This rule is not an economically significant rule and does not create an environmental risk to health or risk to safety that might disproportionately affect children.

    11. Indian Tribal Governments

    This rule does not have tribal implications under Executive Order 13175, Consultation and Coordination with Indian Tribal Governments, because it would not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and responsibilities between the Federal Government and Indian tribes.

    12. Energy Effects

    We have analyzed this rule under Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use. We have determined that it is not a “significant energy action” under that order because it is not a “significant regulatory action” under Executive Order 12866 and is not likely to have a significant adverse effect on the supply, distribution, or use of energy. The Administrator of the Office of Information and Regulatory Affairs has not designated it as a significant energy action. Therefore, it does not require a Statement of Energy Effects under Executive Order 13211.

    13. Technical Standards

    This rule does not use technical standards. Therefore, we did not consider the use of voluntary consensus standards.

    14. Environment

    We have analyzed this rule under Department of Homeland Security Management Directive 023-01, and Commandant Instruction M16475.lD which guides the Coast Guard in complying with the National Environmental Policy Act of 1969 (NEPA) (42 U.S.C. 4321-4370f), and have concluded that this action is one of a category of actions which do not individually or cumulatively have a significant effect on the human environment. This rule is categorically excluded under figure 2-1, paragraph (32)(e), of the Instruction.

    Under figure 2-1, paragraph (32)(e), of the instruction, an environmental analysis checklist and a categorical exclusion determination are not required for this rule.

    Start Part

    PART 117—DRAWBRIDGE OPERATION REGULATIONS

    End Part Start Amendment Part

    For the reasons discussed in the preamble, under the authority of 33 U.S.C. 499; 33 CFR 1.05-1; and Department of Homeland Security Delegation No. 0170.1, the interim rule amending 33 CFR part 117 that was published at 77 FR 52604 on August 30, 2012, is adopted without change as a final rule.

    End Amendment Part Start Signature

    Dated: February 28, 2013.

    Steven H. Ratti,

    Rear Admiral, U.S. Coast Guard, Commander, Fifth Coast Guard District.

    End Signature End Supplemental Information

    [FR Doc. 2013-06428 Filed 3-19-13; 8:45 am]

    BILLING CODE 9110-04-P

Document Information

Comments Received:
0 Comments
Effective Date:
4/19/2013
Published:
03/20/2013
Department:
Coast Guard
Entry Type:
Rule
Action:
Final rule.
Document Number:
2013-06428
Dates:
Effective April 19, 2013.
Pages:
17090-17094 (5 pages)
Docket Numbers:
Docket No. USCG-2012-0357
RINs:
1625-AA09: Drawbridge Regulations
RIN Links:
https://www.federalregister.gov/regulations/1625-AA09/drawbridge-regulations
PDF File:
2013-06428.pdf
CFR: (1)
33 CFR 117