97-11586. Revision to the NASA FAR Supplement To Delete Class Deviation
[Federal Register Volume 62, Number 86 (Monday, May 5, 1997)]
[Rules and Regulations]
[Page 24345]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-11586]
=======================================================================
-----------------------------------------------------------------------
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
48 CFR Part 1831
Revision to the NASA FAR Supplement To Delete Class Deviation
AGENCY: National Aeronautics and Space Administration (NASA).
ACTION: Final rule.
-----------------------------------------------------------------------
SUMMARY: This action deletes the class deviation from the cost
principle at 1831.205-18 on independent research and development
(IR&D).
EFFECTIVE DATE: May 16, 1997.
FOR FURTHER INFORMATION CONTACT:
Mr. Joseph LeCren, Code HK, (202) 358-0444, fax (202) 358-2-3220, or e-
mail joseph.lecren@hq.nasa.gov.
SUPPLEMENTARY INFORMATION:
Background
NASA published a class deviation as a final rule in the Federal
Register (59 FR 46359-46360) September 8, 1994. The class deviation
eliminated the provision at FAR 31.205-18(e) against the treatment of
contractor IR&D contributions under NASA cooperative arrangements as
allowable indirect costs. A FAR case was initiated to revise the IR&D
cost principle to remove that provision at 31.205-18(e). A final FAR
rule was published in the Federal Register (62 FR 12704-12705) March
17, 1997, making that revision. The publication of the revised FAR cost
principle eliminates the need for the NASA class deviation. The revised
FAR cost principle is effective May 16, 1997.
Impact
NASA certifies that this change to its regulations will not have a
significant economic impact on a substantial number of small entities
under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.). This
change does not impose any reporting or recordkeeping requirements
subject to the Paperwork Reduction Act.
List of Subjects in 48 CFR Part 1831
Government procurement.
Tom Luedtke,
Deputy Associate Administrator for Procurement.
Accordingly, 48 CFR 1831 is amended as follows:
PART 1831--CONTRACT COST PRINCIPLES AND PROCEDURES
1. The authority citation for 48 CFR 1831 continues to read as
follows:
Authority: U.S.C. 2473(c)(1).
Sec. 1831.205-18 [Removed]
2. Section 1831.205-18 is removed.
[FR Doc. 97-11586 Filed 5-2-97; 8:45 am]
BILLING CODE 7510-01-M
Document Information
- Effective Date:
- 5/16/1997
- Published:
- 05/05/1997
- Department:
- National Aeronautics and Space Administration
- Entry Type:
- Rule
- Action:
- Final rule.
- Document Number:
- 97-11586
- Dates:
- May 16, 1997.
- Pages:
- 24345-24345 (1 pages)
- PDF File:
-
97-11586.pdf
- CFR: (1)
- 48 CFR 1831.205-18