2014-10357. Benefits Payable in Terminated Single-Employer Plans; Limitations on Guaranteed Benefits; Shutdown and Similar Benefits  

  • Start Preamble

    AGENCY:

    Pension Benefit Guaranty Corporation.

    ACTION:

    Final rule.

    SUMMARY:

    This final rule amends PBGC's regulation on Benefits Payable in Terminated Single-Employer Plans, which sets forth rules on PBGC's guarantee of pension plan benefits, including rules on the phase-in of the guarantee. The amendments implement the Pension Protection Act of 2006 provision that the phase-in period for the guarantee of benefits that are contingent upon the occurrence of an “unpredictable contingent event,” such as a plant shutdown, starts no earlier than the date of the shutdown or other unpredictable contingent event.

    DATES:

    Effective June 5, 2014.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Catherine B. Klion, Assistant General Counsel for Regulatory Affairs, Office of the General Counsel, Pension Benefit Guaranty Corporation, 1200 K Street NW., Washington, DC 20005, 202-326-4224 or klion.catherine@pbgc.gov. (TTY/TDD users may call the Federal relay service toll-free at 1-800-877-8339 and ask to be connected to 202-326-4224.)

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Executive Summary

    This rule is needed to conform PBGC's benefit payment regulation to Pension Protection Act of 2006 changes to the phase-in of PBGC's guarantee of benefits that are contingent upon the occurrence of an “unpredictable contingent event,” such as a plant shutdown.

    PBGC's legal authority for this action comes from section 4002(b)(3) of the Employee Retirement Income Security Act of 1974 (ERISA), which authorizes PBGC to issue regulations to carry out the purposes of Title IV of ERISA, and section 4022 of ERISA, which sets forth rules on PBGC's guarantee of benefits in terminated single-employer plans.

    This final regulation codifies the Pension Protection Act of 2006 provision that the phase-in period for the guarantee of benefits that are contingent upon the occurrence of an “unpredictable contingent event,” such as a plant shutdown, starts no earlier than the date of the shutdown or other unpredictable contingent event. The regulation incorporates the definition of an unpredictable contingent event benefit under Title II of ERISA and Treasury regulations; provides that the guarantee of an unpredictable contingent event benefit is phased in from the latest of the date the benefit provision is adopted, the date the benefit is effective, or the date the event that makes the benefit payable occurs; and includes eight examples that show how the phase-in rules apply in various situations.

    PBGC received one public comment on its 2011 proposed regulation. PBGC has made a change to the final regulation in response to the comment.

    Background

    The Pension Benefit Guaranty Corporation (PBGC) administers the single-employer pension plan termination insurance program under Title IV of the Employee Retirement Income Security Act of 1974 (ERISA). The program covers certain private-sector, single-employer defined benefit plans, for which premiums are paid to PBGC each year.

    Covered plans that are underfunded may terminate either in a distress termination under section 4041(c) of ERISA or in an involuntary termination (one initiated by PBGC) under section 4042 of ERISA. When such a plan terminates, PBGC typically is appointed statutory trustee of the plan, and becomes responsible for paying benefits in accordance with the provisions of Title IV.

    Under sections 4022(b)(1) and 4022(b)(7) of ERISA and §§ 4022.24 through .26 of PBGC's regulation on Benefits Payable in Terminated Single-Employer Plans, 29 CFR part 4022, PBGC's guarantee of new pension benefits and benefit increases is “phased in” over a five-year period, which begins on the date the new benefit or benefit increase is adopted or effective, whichever is later.

    The Pension Protection Act of 2006, Public Law 109-280 (PPA 2006), amended section 4022 of ERISA by adding a new section 4022(b)(8), which changes the start of the phase-in period for plant shutdown and other “unpredictable contingent event benefits.” Under section 4022(b)(8), the phase-in rules are applied as if a plan amendment creating an unpredictable contingent event benefit (UCEB) was adopted on the date the unpredictable contingent event (UCE) occurred rather than as of the actual adoption date of the amendment, which is almost always earlier. As a result of the change, the guarantee of benefits arising from plant shutdowns and other UCEs that occur within five years of plan termination (or the date the plan sponsor entered bankruptcy, if applicable under PPA 2006, as explained below) generally will be lower than under prior law. This provision, which does not otherwise change the existing phase-in rules, applies to benefits that become payable as a result of a UCE that occurs after July 26, 2005.

    Phase-In of PBGC Guarantee

    Under section 4022(b)(7) of ERISA, the guarantee of benefits under a new plan or of a new benefit or benefit increase under an amendment to an existing plan (all of which are referred to in PBGC's regulations as “benefit increases”) is “phased in” based on the number of full years the benefit increase is in the plan. The time period that a benefit increase has been provided under a plan is measured from the later of the adoption date of the provision creating the benefit increase or the effective date of the benefit increase. Generally, 20 percent of a benefit increase is guaranteed after one year, 40 percent after two years, etc., with full phase-in of the guarantee after five years. If the amount of the monthly benefit increase is below $100, the annual rate of phase-in is $20 rather than 20 percent.

    The phase-in limitation generally serves to protect the insurance program from losses caused by benefit increases that are adopted or made effective shortly before plan termination. This protection is needed because benefit increases can create large unfunded liabilities. An example is a plan amendment that significantly increases credit under the plan benefit formula for service performed prior to the amendment. Such increases generally are funded over time under the ERISA minimum funding rules. Congress determined that an immediate full guarantee would result in an inappropriate loss for PBGC if a plan terminated before an employer significantly funded a benefit increase. Phase-in of the guarantee allows time for some funding of new liabilities before they are fully guaranteed.

    Funding of liabilities created by a benefit increase generally starts at the Start Printed Page 25668same time as the PBGC guarantee first applies under the phase-in rule. Under ERISA and the Internal Revenue Code (Code), liability created by a benefit increase must be reflected in a plan's required contribution no later than the plan year following adoption of the benefit increase. For example, a benefit increase that is adopted and effective in the 2009 plan year must be reflected in the minimum funding contribution calculations for a plan year not later than the 2010 plan year. Similarly, such a benefit increase would become partially guaranteed during the 2010 plan year.

    Over the years, legislative reforms, including those in PPA 2006, have generally shortened the permitted funding period from thirty years to seven years (or less in certain cases). This closer coordination between the permitted funding period and five-year guarantee phase-in period generally enhanced the effectiveness of the phase-in provisions in protecting the PBGC insurance program against losses due to unfunded benefit increases. However, as explained below, before the PPA 2006 changes to the phase-in of UCEBs, this coordination generally failed in the case of UCEBs.

    Unpredictable Contingent Event Benefits

    UCEBs, described more specifically below, are benefits or benefit increases that become payable solely by reason of the occurrence of a UCE such as a plant shutdown. UCEBs typically provide a full pension, without any reduction for age, starting well before an unreduced pension would otherwise be payable. The events most commonly giving rise to UCEBs are events relating to full or partial plant shutdowns or other reductions in force. UCEBs, which are frequently provided in pension plans in various industries such as the steel and automobile industries, are payable with respect to full or partial plant shutdowns as well as shutdowns of different kinds of facilities, such as administrative offices, warehouses, retail operations, etc. UCEBs are also payable, in some cases, with respect to layoffs and other workforce reductions.[1]

    A typical shutdown benefit provision in the steel industry—the so-called “70/80 Rule”—generally allows participants who lose their jobs due to the complete or partial closing of a facility or a reduction-in-force and whose age plus service equals 70 (if at least age 55) or 80 (at any age) to begin receiving their full accrued pension immediately, even though they have not reached normal retirement age. Similar UCEBs are common in the automobile industry with respect to shutdowns and layoffs. The purpose of these benefits is to assist participants financially in adjusting to a permanent job loss.

    Time Lag Between Start of Guarantee Phase-In and Funding of UCEBs

    A UCEB provision typically has been in a plan many years before the occurrence of the event that eventually triggers the benefit, such as a plant shutdown. As a result, before PPA 2006, shutdown benefits, for example, were often fully guaranteed under the phase-in rules when a shutdown occurred. Because the benefit is contingent on the occurrence of an unpredictable event, plan sponsors typically did not make contributions to provide for advance funding of such benefits; funding of such benefits often did not begin until after the UCE had occurred. If, as often happened, plan termination occurred within a few years after a shutdown, the time lag between the start of the phase-in period and the start of funding resulted in an increased loss to the insurance program.

    Treatment of UCEBs in OBRA 1987

    Congress first explicitly addressed UCEBs in funding reforms contained in the Pension Protection Act of 1987, enacted as part of Public Law 100-203, the Omnibus Budget Reconciliation Act of 1987 (OBRA 1987). The OBRA 1987 rules for deficit reduction contributions required employers to recognize UCEBs on an accelerated basis (generally, within five to seven years), beginning after the triggering event occurred.[2] However, the rules did not address the mismatch of the funding and guarantee phase-in periods discussed above. They also did not address the fact that UCEBs are likely to be triggered when the employer is experiencing financial difficulty, which threatens both funding and continuation of the plan. For these reasons, in the years since OBRA 1987, PBGC has assumed more than $1 billion of unfunded benefit liabilities from shutdown and similar benefits.

    Treatment of UCEBs in PPA 2006

    Congress further addressed UCEBs in PPA 2006. PPA 2006 affected UCEBs in two important ways.

    First, PPA 2006 added new ERISA section 206(g) and parallel Code section 436(b) that restrict payment of UCEBs with respect to a UCE if the plan is less than 60 percent funded for the plan year in which the UCE occurs (or would be less than 60 percent funded taking the UCEB into account). Unless the restriction is removed during that plan year as a result of additional contributions to the plan or an actuarial certification meeting certain requirements, the restriction becomes permanent and, under Treas. Reg. § 1.436-1(a)(4)(iii),[3] the plan is treated as if it does not provide for those UCEBs.[4] Because PBGC guarantees only benefits that are provided under a plan, a UCEB that is treated as not provided under the plan because of this restriction is not guaranteeable by PBGC at all, and the phase-in rules that are the subject of this final regulation do not come into play for such a UCEB. Moreover, under Treas. Reg. § 1.436-1(a)(3)(ii), benefit limitations under ERISA section 206(g) that were in effect immediately before plan termination continue to apply after termination.

    Second, PPA 2006 better aligns the starting dates of the funding and guarantee phase-in of UCEBs. Under PPA 2006, phase-in of the PBGC guarantee does not start until the UCE actually occurs. Specifically, ERISA section 4022(b)(8), added by section 403 of PPA 2006, provides: “If an unpredictable contingent event benefit (as defined in section 206(g)(1)) is payable by reason of the occurrence of any event, this section shall be applied as if a plan amendment had been adopted on the date such event occurred.” The provision applies to UCEs that occur after July 26, 2005. Thus, for purposes of the phase-in limitation, the date a UCE occurs is treated as the adoption date of the plan provision that provides for the related UCEB. This statutory change provides Start Printed Page 25669the PBGC insurance program a greater measure of protection than prior law from losses due to unfunded UCEBs—most notably, benefits that become payable by reason of a plant shutdown or similar event such as a permanent layoff.[5]

    ERISA section 206(g)(1), as added by section 103(a) of PPA 2006, defines “unpredictable contingent event benefit” as any benefit payable solely by reason of a plant shutdown (or similar event, as determined by the Secretary of the Treasury), or an event other than the attainment of any age, performance of any service, receipt or derivation of any compensation, or occurrence of death or disability.

    PPA 2006 did not alter the rule that UCEBs are not guaranteed at all unless the triggering event occurred prior to the plan termination date (see PBGC v. Republic Tech. Int'l, LLC, 386 F.3d 659 (6th Cir. 2004)).

    Treasury Final Regulation

    On October 15, 2009 (at 74 FR 53004), the Department of the Treasury (Treasury) published a final rule on Benefit Restrictions for Underfunded Pension Plans that defines UCEB for purposes of ERISA section 206(g)(1), and thus also for purposes of section 4022(b)(8). Treasury's final regulation clarifies the following points regarding UCEBs:

    • UCEBs include only benefits or benefit increases to the extent such benefits or benefit increases would not be payable but for the occurrence of a UCE.
    • The reference to “plant shutdown” in the statutory definition of UCEB includes a full or partial shutdown.

    Treasury's final regulation also states that a UCEB includes benefits triggered by events similar to plant shutdowns. Treas. Reg. § 1.436-1(j)(9) defines a UCEB at 26 CFR 1.436(j)(9).

    PBGC Proposed Rule and Public Comment

    On March 11, 2011 (at 76 FR 13304), PBGC published a proposed rule to implement section 403 of PPA 2006.[6] PBGC received one comment on the proposed rule, from an association of labor organizations.[7] The commenter requested that the final rule limit PBGC's discretion to determine the beginning date of the phase-in period for the guarantee of a UCEB and require PBGC to notify participants affected by the phase-in of the date of the UCE. The commenter also expressed concern about the participant-by-participant basis for determining the date on which a UCE occurs in the case of a reduction in force. PBCG's response to the comment is discussed below.

    Overview of Final Regulation

    The final regulation incorporates the definition of UCEB under section 206(g)(1)(C) of ERISA and Treas. Reg. § 1.436-1(j)(9). It also provides that the guarantee of a UCEB is phased in from the latest of the date the benefit provision is adopted, the date the benefit is effective, or the date the UCE that makes the benefit payable occurs. The final rule includes eight examples that show how the UCEB phase-in rules apply in the following situations:

    • Shutdown that occurs later than the announced shutdown date.
    • Sequential permanent layoffs.
    • Skeleton shutdown crews.
    • Permanent layoff benefit for which the participant qualifies shortly before the sponsor enters bankruptcy.
    • Employer declaration during a layoff that return to work is unlikely.
    • Shutdown benefit with age requirement that can be met after the shutdown.
    • Retroactive UCEB.
    • Removal of IRC Section 436 restriction.[8]

    The final regulation is nearly the same as the proposed regulation. As explained below, PBGC has made one change in the regulation in response to the public comment. In addition, PBGC has updated the dates in the examples.

    Regulatory Changes

    UCEBs Covered

    As explained above, ERISA section 4022(b)(8), added by section 403 of PPA 2006, changes the rules for phasing in the guarantee of UCEBs in the case of UCEs that occur after July 26, 2005. Section 4022(b)(8) covers shutdown-type benefits, including benefits payable by reason of complete shutdowns of plants, and benefits payable when participants lose their jobs or retire as a result of partial closings or reductions-in-force at all kinds of facilities, in addition to other UCEBs. Accordingly, § 4022.27(a) expressly refers to benefits payable as a result of “plant shutdowns or other unpredictable contingent events . . ., such as partial facility closings and permanent layoffs.” [9]

    As stated above, a UCEB is defined by section 206(g)(1)(C) of ERISA to include benefits payable solely by reason of (1) a plant shutdown or similar event, or (2) an event other than an event such as attainment of a certain age or performance of service, that would trigger eligibility for a retirement benefit. The final regulation provides that PBGC will determine whether a benefit is a UCEB based on the facts and circumstances; the substance of the benefit, not what it is called, determines whether the benefit would be a UCEB covered by the new phase-in rule. Accordingly, under § 4022.27(b), the guarantee of any benefit that PBGC determines, based on plan provisions and facts and circumstances, is a shutdown benefit or is otherwise a UCEB will be phased in as a UCEB.

    The definition of UCEB under § 4022.2 provides that a benefit does not cease to be a UCEB for phase-in purposes merely because the UCE has already occurred or its occurrence has become reasonably predictable. This interpretation is supported by the plain language of ERISA section 4022(b)(8), which incorporates ERISA section 206(g)(1)(C). Section 206(g)(1)(C) expressly defines a UCEB not in terms of degree of predictability, but rather whether a benefit is “payable solely by reason of a shutdown or similar event . . . or an event other than the attainment of any age, performance of any service, receipt or derivation of any compensation, or occurrence of death or disability.” In other words, section 206(g)(1)(C) provides that a UCEB remains a UCEB after the UCE occurs. Because many events that are not reliably and reasonably predictable become predictable immediately before they occur, and the concept of predictability does not apply to events after they have occurred, PBGC interprets ERISA section 4022(b)(8) to apply to benefits such as shutdown benefits regardless of whether the events Start Printed Page 25670triggering those benefits have already occurred or have become predictable.

    Date UCE Occurs

    Under the final regulation, PBGC determines the date a UCE occurs based on the plan provisions and other facts and circumstances, including the nature and level of activity at a facility that is closing and the permanence of the event. Statements or determinations by the employer, the plan administrator, a union, an arbitrator under a collective bargaining agreement, or a court about the date of the event may be relevant but are not controlling. Where a plan provides that a UCEB is payable only upon the occurrence of more than one UCE, the regulation provides that the guarantee is phased in from the latest date when all such UCEs have occurred. For example, if a UCEB is payable only if a participant is laid off and the layoff continues for a specified period of time, the phase-in period begins at the end of the specified period of time. Similarly, if a UCEB is payable only if both the plant where an employee worked is permanently shut down and it is determined that the employer has no other suitable employment for the employee, the phase-in period begins when it is determined that the employer had no other suitable employment for the employee (assuming that date was later than the shutdown date).

    The commenter expressed concern that the proposed “facts and circumstances” standard granted PBGC broad discretionary authority to reduce participants' guaranteed benefits and requested that this discretion should be limited, in general, by granting deference to eligibility determinations made by the plan sponsor (when acting as plan administrator), or that PBGC should be bound by the decision of an arbitrator, benefit agreement or judicial decision construing a collective bargaining agreement. The commenter points out that such deference is especially appropriate where participants are receiving benefits and have relied upon those determinations.

    Because shutdowns and similar situations are fact-specific, PBGC continues to believe that a facts-and-circumstances approach is the best way to implement the statute. However, PBGC agrees with the commenter that determinations made by a plan, arbitrator, or court regarding the date when participants became entitled to the UCEB may be relevant. Accordingly, in response to the comment, § 4022.27(d) of the final regulation specifically includes determinations and statements by such parties as factors that will be considered, to the extent relevant, in establishing the UCE date. PBGC will not, however, treat any such determinations or statements as controlling.

    This change does not alter the principle that PBGC is ultimately responsible for determining participants' guaranteed benefits. The agency administers a program that places statutory limits on benefits, and it is not generally bound by a private party's determination of benefits.

    Whether a UCEB phase-in determination applies on a participant-by-participant basis, as opposed to facility-wide or some other basis, will depend largely upon plan provisions. For example, a benefit triggered by a reduction-in-force would be determined with respect to each participant, and thus layoffs that occur on different dates would generally be distinct UCEs. See Example 2 of the final regulation (§ 4022.27(e)(2)). But a benefit payable only upon the complete shutdown of the employer's entire operations applies plan-wide, and thus the shutdown date generally is the date of the UCE for all participants.

    The commenter expressed concern that in cases of sequential layoffs, participants laid off early in a shutdown process would obtain a greater phase-in percentage than participants laid off later in the process. The commenter suggested that sequential layoffs resulting in a shutdown should be viewed as a single event, and the UCE date should be the date on which the sponsor decided upon the layoffs, or at the latest, the date on which the first participants are laid off. PBGC has not adopted this suggestion.

    In the case of a sequential layoff where the plan provides that benefits become payable as of the layoff date, it is true that a participant-by-participant determination of the UCE date could result in participants laid off early in a shutdown process receiving a greater phase-in percentage than participants laid off later in the process. However, that result is dictated by plan language that conditions a benefit upon the participant's layoff, and ERISA section 4022(b)(8), which requires that the phase-in period commence no earlier than the date of the event that triggers the UCEB. Setting a phase-in date that is prior to the date of the event that made the layoff benefit payable would not accord with the statute and therefore would be beyond PBGC's authority.[10]

    The commenter also requested that the final rule require that PBGC explain in detail, as part of the benefit determination process, the reasons for its selection of the triggering date on which the phase-in is based, if that date is different from the triggering date used by the plan. PBGC's regulations do not specify the amount of detail to be included in benefit determinations, in order to preserve flexibility in dealing with a wide variety of plans and plan provisions. In issuing benefit determinations to participants and beneficiaries, PBGC carefully balances providing additional information with reducing the potential for confusion from undue complexity. However, PBGC understands the commenter's concern and is committed to transparency in its communications with participants and beneficiaries. In response to the comment, PBGC's policy will be to provide the UCE date and the information necessary to understand it, in all benefit determinations, with the amount of additional information necessarily varying from case to case.

    Date Phase-In Begins

    ERISA sections 4022(b)(1) and 4022(b)(7) provide that PBGC's guarantee of a benefit increase is phased in from the date the benefit increase is “in effect,” i.e., from the later of the adoption date or effective date of the increase. ERISA section 4022(b)(8) (added by PPA 2006) provides that, for phase-in purposes, shutdown benefits and other UCEBs are deemed to be “adopted on the date . . . [the UCE] occurs.” Thus ERISA section 4022(b)(8) protects PBGC in the typical situation where a shutdown or permanent layoff occurs long after a shutdown benefit provision was originally adopted.

    Section 4022(b)(8) could be read to produce an incongruous result in an unusual situation where the UCE occurs first and a UCEB is adopted later, effective retroactive to the UCE. Because the date of the UCE would be treated under section 4022(b)(8) as the adoption date of the UCEB, in this situation the phase-in arguably would begin on the date of the UCE, rather than on the actual adoption date of the plan amendment, as under pre-PPA 2006 law. The result would be a more generous—and more costly—guarantee of UCEBs than under pre-PPA 2006 law. To avoid this incongruous result, § 4022.27(c) provides that a benefit increase due solely to a UCEB is “in effect” as of the latest of the adoption date of the plan provision that provides Start Printed Page 25671for the UCEB, the effective date of the UCEB, or the date the UCE occurs.

    Finally, if a UCEB becomes payable because a restriction under IRC section 436 is removed after, for example, an adequate funding contribution is made, the effective date of the UCEB for phase-in purposes is determined without regard to the restriction.

    Allocation of Assets

    When PBGC becomes trustee of a pension plan that terminates without sufficient assets to provide all benefits, it allocates plan assets to plan benefits in accordance with the statutory priority categories in section 4044 of ERISA. The category to which a particular benefit is assigned in the asset allocation can affect insurance program costs and the extent to which participants receive nonguaranteed benefits.

    Priority category 3 in the asset allocation is particularly important, because it often includes benefits that, depending on the level of the plan assets, may be paid by PBGC even though not guaranteed. Priority category 3 contains only those benefits that were in pay status at least three years before the termination date of the plan (or that would have been in pay status if the participant had retired before that three-year period). An individual's benefit amount in priority category 3 is based on the plan provisions in effect during the five-year period preceding plan termination under which the benefit amount would be the least. Thus priority category 3 does not include benefit increases that were adopted or became effective in the five years before plan termination or, in some cases as discussed below, the bankruptcy filing date.

    PBGC considered whether the UCEBs that are not guaranteed under the PPA 2006 changes should be excluded from priority category 3. Under that approach, plan assets would go farther to pay for other benefits, especially guaranteed benefits, and participants would be less likely to receive UCEBs that are not guaranteed. Alternatively, if UCEBs that are not guaranteed under the PPA 2006 changes were included in priority category 3—as they are under pre-PPA law and PBGC's current regulation on Allocation of Assets (part 4044)—plan assets would be less likely to reach other benefits, especially guaranteed benefits, and participants would be more likely to receive UCEBs that are not guaranteed.

    Because section 403 of PPA 2006 does not make any reference to section 4044,[11] PBGC concluded that the latter interpretation is the better one, and thus the final regulation, like the proposed regulation, does not amend part 4044.

    Bankruptcy Filing Date Treated as Deemed Termination Date

    On June 14, 2011 (76 FR 34590), PBGC published a final rule, “Bankruptcy Filing Date Treated as Plan Termination Date for Certain Purposes; Guaranteed Benefits; Allocation of Plan Assets; Pension Protection Act of 2006,” to implement section 404 of PPA 2006, which added a new section 4022(g) to ERISA. This section provides that when an underfunded plan terminates while its contributing sponsor is in bankruptcy, the amount of guaranteed benefits under section 4022 will be determined as of the date the sponsor entered bankruptcy (bankruptcy filing date) rather than as of the termination date. The provision applies to plans terminating while the sponsor is in bankruptcy, if the bankruptcy filing date is on or after September 16, 2006.[12]

    Section 4022(g) applies to all types of plan benefits, including UCEBs. Under this provision, if a permanent shutdown (or other UCE) occurs after the bankruptcy filing date, UCEBs arising from the UCE are not guaranteed because the benefits are not nonforfeitable as of the bankruptcy filing date. Similarly, if the shutdown (or other UCE) occurs before the bankruptcy filing date, the five-year phase-in period for any resulting UCEBs is measured from the date of the UCE to the bankruptcy filing date, rather than to the plan termination date. For example, if a permanent shutdown occurs three years before the bankruptcy filing date, the guarantee of any resulting UCEBs will be only 60 percent phased in, even if the shutdown was more than five years before the plan's termination date. This rule is illustrated by Examples 4 and 5 in the regulation (§ 4022.27(e)(4) and (5), respectively).

    PBGC considered whether UCEBs could be excepted from the section 4022(g) bankruptcy provision on the ground that the general phase-in rule in section 4022(g) is superseded by the specific section 4022(b)(8) phase-in rule for UCEBs. However, PBGC concluded that the language of the bankruptcy and UCEB statutory provisions does not allow for any such exception. The UCEB provision alters the starting date for phase-in of UCEBs, while the bankruptcy provision alters the date beyond which no further phase-in is allowed for any benefit increase, including a UCEB. PBGC sees no conflict in applying both provisions to UCEBs.

    Estimated Guaranteed Benefits

    ERISA section 4041(c)(3)(D)(ii)(IV) requires administrators of plans terminating in a distress termination to limit payment of benefits to estimated guaranteed benefits and estimated non-guaranteed benefits funded under section 4044, beginning on the proposed termination date. Section 4022.62 of PBGC's regulation on Benefits Payable in Terminated Single-Employer Plans contains rules for computing estimated guaranteed benefits, including provisions for estimating guaranteed benefits when a new benefit or benefit increase was added to the plan within five years before plan termination. The final regulation, like the proposed regulation, amends § 4022.62 to provide that the date the UCE occurs is treated as the date the UCEB was adopted, i.e., the date the plan was amended to include the UCEB.

    Applicability

    The amendments in this final rule, like section 403 of PPA 2006, will apply to UCEBs that become payable as a result of a UCE that occurs after July 26, 2005.

    Regulatory Procedures

    Executive Order 12866 “Regulatory Planning and Review” and Executive Order 13563 “Improving Regulation and Regulatory Review”

    PBGC has determined, in consultation with the Office of Management and Budget, that this final rule not is a “significant regulatory action” under Executive Order 12866.

    Executive Orders 12866 and 13563 direct agencies to assess all costs and benefits of available regulatory alternatives and, if regulation is necessary, to select regulatory approaches that maximize net benefits (including potential economic, environmental, public health and safety effects, distributive impacts, and equity). Executive Order 13563 emphasizes the importance of quantifying both costs and benefits, of reducing costs, of harmonizing rules, and of promoting flexibility. Executive Orders 12866 and 13563 require that a comprehensive regulatory impact Start Printed Page 25672analysis be performed for any economically significant regulatory action, defined as an action that would result in an annual effect of $100 million or more on the national economy or which would have other substantial impacts. In accordance with OMB Circular A-4, PBGC has examined the economic and policy implications of this final rule and has concluded that the action's benefits justify its costs.

    Under Section 3(f)(1) of Executive Order 12866, a regulatory action is economically significant if “it is likely to result in a rule that may . . . [h]ave an annual effect on the economy of $100 million or more or adversely affect in a material way the economy, a sector of the economy, productivity, competition, jobs, the environment, public health or safety, or State, local, or tribal governments or communities.” This final rule does not cross the $100 million threshold for economic significance and is not otherwise economically significant.

    The economic effect of the final rule is entirely attributable to the economic effect of section 403 of PPA 2006. Three factors tend to reduce the economic impact of section 403.

    First, before section 403 went into effect, PBGC often involuntarily terminated plans with shutdown liabilities before company-wide shutdowns, under the “long-run loss” provision in section 4042(a)(4) of ERISA. That provision allows PBGC to initiate termination proceedings if its long-run loss “may reasonably be expected to increase unreasonably if the plan is not terminated.” A sudden increase in PBGC's liabilities resulting from a shutdown could create just such an unreasonable increase in long-run loss. Section 403 avoids the need for PBGC to make case-by-case decisions whether to initiate such “pre-emptive” terminations. Although it is difficult to make assumptions about PBGC's ability and intent to pursue such terminations if section 403 had not gone into effect, this factor tends to reduce its economic impact.

    Second, another PPA 2006 amendment provides that if a plan terminates while the sponsor is in bankruptcy, the amount of benefits guaranteed by PBGC is fixed at the date of the bankruptcy filing rather than at the plan termination date. Because of that provision, if a plant shutdown or other UCE occurred between the bankruptcy filing date and the termination date, the resulting UCEB would not be guaranteed at all, and thus section 403 would have no economic effect.

    Third—and perhaps most important—as also discussed above, other PPA 2006 provisions restrict payment of UCEBs if a plan is less than 60 percent funded. If, because of those restrictions, a UCEB was not payable at all, section 403 again would have no economic effect.

    As stated above in Applicability, section 403 of PPA 2006 applies to any UCEB that becomes payable as a result of a UCE that occurs after July 26, 2005. PBGC estimates that, to date, the total effect of section 403—in terms of lower benefits paid to participants and associated savings for PBGC—is less than $4 million. Although PBGC cannot predict with certainty which plans with UCEBs will terminate, the funding level of such plans, or what benefits will be affected by the guarantee limits, given the relatively low estimate of the effect of the statutory provision to date, PBGC has determined that the annual effect of the rule will be less than $100 million.

    Regulatory Flexibility Act

    PBGC certifies under section 605(b) of the Regulatory Flexibility Act that this final rule will not have a significant economic impact on a substantial number of small entities. The amendments implement and in some cases clarify statutory changes made in PPA 2006; they do not impose new burdens on entities of any size. Virtually all of the statutory changes affect only PBGC and persons who receive benefits from PBGC. Accordingly, sections 603 and 604 of the Regulatory Flexibility Act do not apply.

    Start List of Subjects

    List of Subjects in 29 CFR Part 4022

    • Pension insurance
    • Pensions
    • Reporting and recordkeeping requirements
    End List of Subjects

    For the reasons given above, PBGC is amending 29 CFR part 4022 as follows:

    Start Part

    PART 4022—BENEFITS PAYABLE IN TERMINATED SINGLE-EMPLOYER PLANS

    End Part Start Amendment Part

    1. The authority citation for part 4022 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 29 U.S.C. 1302, 1322, 1322b, 1341(c)(3)(D), and 1344.

    End Authority Start Amendment Part

    2. In § 4022.2:

    End Amendment Part Start Amendment Part

    a. Amend the definition of “benefit increase” by removing the final “and” in the second sentence and adding in its place, “an unpredictable contingent event benefit, and”; and

    End Amendment Part Start Amendment Part

    b. Add in alphabetical order definitions for unpredictable contingent event (UCE) and unpredictable contingent event benefit (UCEB) to read as follows:

    End Amendment Part
    Definitions.
    * * * * *

    Unpredictable contingent event (UCE) has the same meaning as unpredictable contingent event in section 206(g)(1)(C) of ERISA and Treas. Reg. § 1.436-1(j)(9) (26 CFR 1.436-1(j)(9)). It includes a plant shutdown (full or partial) or a similar event (such as a full or partial closing of another type of facility, or a layoff or other workforce reduction), or any event other than the attainment of any age, performance of any service, receipt or derivation of any compensation, or occurrence of death or disability.

    Unpredictable contingent event benefit (UCEB) has the same meaning as unpredictable contingent event benefit in section 206(g)(1)(C) of ERISA and Treas. Reg. § 1.436-1(j)(9) (26 CFR 1.436-1(j)(9)). Thus, a UCEB is any benefit or benefit increase to the extent that it would not be payable but for the occurrence of a UCE. A benefit or benefit increase that is conditioned upon the occurrence of a UCE does not cease to be a UCEB as a result of the contingent event having occurred or its occurrence having become reasonably predictable.

    Start Amendment Part

    3. Revise § 4022.24(e) to read as follows:

    End Amendment Part
    Benefit increases.
    * * * * *

    (e) Except as provided in § 4022.27(c), for the purposes of §§ 4022.22 through 4022.28, a benefit increase is deemed to be in effect commencing on the later of its adoption date or its effective date.

    * * * * *
    [Redesignated as § 4022.28]
    Start Amendment Part

    4. Section 4022.27 is redesignated as § 4022.28.

    End Amendment Part Start Amendment Part

    5. New § 4022.27 is added to read as follows:

    End Amendment Part
    Phase-in of guarantee of unpredictable contingent event benefits.

    (a) Scope. This section applies to a benefit increase, as defined in § 4022.2, that is an unpredictable contingent event benefit (UCEB) and that is payable with respect to an unpredictable contingent event (UCE) that occurs after July 26, 2005.

    (1) Examples of benefit increases within the scope of this section include unreduced early retirement benefits or other early retirement subsidies, or other benefits to the extent that such benefits would not be payable but for the occurrence of one or more UCEs.

    (2) Examples of UCEs within the scope of this section include full and partial closings of plants or other Start Printed Page 25673facilities, and permanent workforce reductions, such as permanent layoffs. Permanent layoffs include layoffs during which an idled employee continues to earn credited service (creep-type layoff) for a period of time at the end of which the layoff is deemed to be permanent. Permanent layoffs also include layoffs that become permanent upon the occurrence of an additional event such as a declaration by the employer that the participant's return to work is unlikely or a failure by the employer to offer the employee suitable work in a specified area.

    (3) The examples in this section are not an exclusive list of UCEs or UCEBs and are not intended to narrow the statutory definitions, as further delineated in Treasury Regulations.

    (b) Facts and circumstances. If PBGC determines that a benefit is a shutdown benefit or other type of UCEB, the benefit will be treated as a UCEB for purposes of this subpart. PBGC will make such determinations based on the facts and circumstances, consistent with these regulations; how a benefit is characterized by the employer or other parties may be relevant but is not determinative.

    (c) Date phase-in begins. (1) The date the phase-in of PBGC's guarantee of a UCEB begins is determined in accordance with subpart B of this part. For purposes of this subpart, a UCEB is deemed to be in effect as of the latest of—

    (i) The adoption date of the plan provision that provides for the UCEB,

    (ii) The effective date of the UCEB, or

    (iii) The date the UCE occurs.

    (2) The date the phase-in of PBGC's guarantee of a UCEB begins is not affected by any delay that may occur in placing participants in pay status due to removal of a restriction under section 436(b) of the Code. See the example in paragraph (e)(8) of this section.

    (d) Date UCE occurs. For purposes of this section, PBGC will determine the date the UCE occurs based on plan provisions and other facts and circumstances, including the nature and level of activity at a facility that is closing and the permanence of the event. PBGC will also consider, to the extent relevant, statements or determinations by the employer, the plan administrator, a union, an arbitrator under a collective bargaining agreement, or a court, but will not treat such statements or determinations as controlling.

    (1) The date a UCE occurs is determined on a participant-by-participant basis, or on a different basis, such as a facility-wide or company-wide basis, depending upon plan provisions and the facts and circumstances. For example, a benefit triggered by a permanent layoff of a participant would be determined with respect to each participant, and thus layoffs that occur on different dates would generally be distinct UCEs. In contrast, a benefit payable only upon a complete plant shutdown would apply facility-wide, and generally the shutdown date would be the date of the UCE for all participants who work at that plant. Similarly, a benefit payable only upon the complete shutdown of the employer's entire operations would apply plan-wide, and thus the shutdown date of company operations generally would be the date of the UCE for all participants.

    (2) For purposes of paragraph (c)(1)(iii) of this section, if a benefit is contingent upon more than one UCE, PBGC will apply the rule under Treas. Reg. § 1.436-1(b)(3)(ii) (26 CFR 1.436-1(b)(3)(ii)) (i.e., the date the UCE occurs is the date of the latest UCE).

    (e) Examples. The following examples illustrate the operation of the rules in this section. Except as provided in Example 8, no benefit limitation under Code section 436 applies in any of these examples. Unless otherwise stated, the termination is not a PPA 2006 bankruptcy termination.

    Example 1.

    Date of UCE. (i) Facts: On January 1, 2006, a Company adopts a plan that provides an unreduced early retirement benefit for participants with specified age and service whose continuous service is broken by a permanent plant closing or permanent layoff that occurs on or after January 1, 2007. On January 1, 2013, the Company informally and without announcement decides to close Facility A within a two-year period. On January 1, 2014, the Company's Board of Directors passes a resolution directing the Company's officers to close Facility A on or before September 1, 2014. On June 1, 2014, the Company issues a notice pursuant to the Worker Adjustment and Retraining Notification (WARN) Act, 29 U.S.C. 2101, et seq., that Facility A will close, and all employees will be permanently laid off, on or about August 1, 2014. The Company and the Union representing the employees enter into collective bargaining concerning the closing of Facility A and on July 1, 2014, they jointly agree and announce that Facility A will close and employees who work there will be permanently laid off as of November 1, 2014. However, due to unanticipated business conditions, Facility A continues to operate until December 31, 2014, when operations cease and all employees are permanently laid off. The plan terminates as of December 1, 2015.

    (ii) Conclusion: PBGC would determine that the UCE is the facility closing and permanent layoff that occurred on December 31, 2014. Because the date that the UCE occurred (December 31, 2014) is later than both the date the plan provision that established the UCEB was adopted (January 1, 2006) and the date the UCEB became effective (January 1, 2007), December 31, 2014, would be the date the phase-in period under ERISA section 4022 begins. In light of the plan termination date of December 1, 2015, the guarantee of the UCEBs of participants laid off on December 31, 2014, would be 0 percent phased in.

    Example 2.

    Sequential layoffs. (i) Facts: The same facts as Example 1, with these exceptions: Not all employees are laid off on December 31, 2014. The Company and Union agree to and subsequently implement a shutdown in which employees are permanently laid off in stages—one third of the employees are laid off on October 31, 2014, another third are laid off on November 30, 2014, and the remaining one-third are laid off on December 31, 2014.

    (ii) Conclusion: Because the plan provides that a UCEB is payable in the event of either a permanent layoff or a plant shutdown, PBGC would determine that phase-in begins on the date of the UCE applicable to each of the three groups of employees. Because the first two groups of employees were permanently laid off before the plant closed, October 31, 2014, and November 30, 2014, are the dates that the phase-in period under ERISA section 4022 begins for those groups. Because the third group was permanently laid off on December 31, 2014, the same date the plant closed, the phase-in period would begin on that date for that group. Based on the plan termination date of December 1, 2015, participants laid off on October 31, 2014, and November 30, 2014, would have 20 percent of the UCEBs (or $20 per month, if greater) guaranteed under the phase-in rule. The guarantee of the UCEBs of participants laid off on December 31, 2014, would be 0 percent phased in.

    Example 3.

    Skeleton shutdown crews. (i) Facts: The same facts as Example 1, with these exceptions: The plan provides for an unreduced early retirement benefit for age/service-qualified participants only in the event of a break in continuous service due to a permanent and complete plant closing. A minimal skeleton crew remains to perform primarily security and basic maintenance functions until March 31, 2015, when skeleton crew members are permanently laid off and the facility is sold to an unrelated investment group that does not assume the plan or resume business operations at the facility. The plan has no specific provision or past practice governing benefits of skeleton shutdown crews. The plan terminates as of January 1, 2015.

    (ii) Conclusion: Because the continued employment of the skeleton crew does not effectively continue operations of the facility, PBGC would determine that there is a permanent and complete plant closing (for purposes of the plan's plant closing provision) as of December 31, 2014, which is the date the phase-in period under ERISA section 4022 begins with respect to employees who incurred a break in continuous service at that time. The UCEB of those participants would be a nonforfeitable benefit as of the plan termination date, but PBGC's guarantee of the UCEB would be 0 percent phased in. In the case of the skeleton Start Printed Page 25674crew members, such participants would not be eligible for the UCEB because they did not incur a break in continuous service until after the plan termination date. (If the plan had a provision that there is no shutdown until all employees, including any skeleton crew are terminated, or if the plan were reasonably interpreted to so provide in light of past practice, PBGC would determine that the date that the UCE occurred was after the plan termination date. Thus the UCEB would not be a nonforfeitable benefit as of the plan termination date and therefore would not be guaranteeable.)

    Example 4.

    Creep-type layoff benefit/bankruptcy of contributing sponsor. (i) Facts: A plan provides that participants who are at least age 55 and whose age plus years of continuous service equal at least 80 are entitled to an unreduced early retirement benefit if their continuous service is broken due to a permanent layoff. The plan further provides that a participant's continuous service is broken due to a permanent layoff when the participant is terminated due to the permanent shutdown of a facility, or the participant has been on layoff status for two years. These provisions were adopted and effective in 1990. Participant A is 56 years old and has 25 years of continuous service when he is laid off in a reduction-in-force on May 15, 2014. He is not recalled to employment, and on May 15, 2016, under the terms of the plan, his continuous service is broken due to the layoff. He goes into pay status on June 1, 2016, with an unreduced early retirement benefit. The contributing sponsor of Participant A's plan files a bankruptcy petition under Chapter 11 of the U.S. Bankruptcy Code on September 1, 2017, and the plan terminates during the bankruptcy proceedings with a termination date of October 1, 2018. Under section 4022(g) of ERISA, because the plan terminated while the contributing sponsor was in bankruptcy, the five-year phase-in period ended on the bankruptcy filing date.

    (ii) Conclusion: PBGC would determine that the guarantee of the UCEB is phased in beginning on May 15, 2016, the date of the later of the two UCEs necessary to make this benefit payable (i.e., the first UCE is the initial layoff and the second UCE is the expiration of the two-year period without rehire). Since that date is more than one year (but less than two years) before the September 1, 2017, bankruptcy filing date, 20 percent of Participant A's UCEB (or $20 per month, if greater) would be guaranteed under the phase-in rule.

    Example 5.

    Creep-type layoff benefit with provision for declaration that return to work unlikely. (i) Facts: A plan provides that participants who are at least age 60 and have at least 20 years of continuous service are entitled to an unreduced early retirement benefit if their continuous service is broken by a permanent layoff. The plan further provides that a participant's continuous service is broken by a permanent layoff if the participant is laid off and the employer declares that the participant's return to work is unlikely. Participants may earn up to 2 years of credited service while on layoff. The plan was adopted and effective in 1990. On March 1, 2014, Participant B, who is age 60 and has 20 years of service, is laid off. On June 15, 2014, the employer declares that Participant B's return to work is unlikely. Participant B retires and goes into pay status as of July 1, 2014. The employer files for bankruptcy on September 1, 2016, and the plan terminates during the bankruptcy.

    (ii) Conclusion: PBGC would determine that the phase-in period of the guarantee of the UCEB would begin on June 15, 2014—the later of the two UCEs necessary to make the benefit payable (i.e., the first UCE is the initial layoff and the second UCE is the employer's declaration that it is unlikely that Participant B will return to work). The phase-in period would end on September 1, 2016, the date of the bankruptcy filing. Thus 40 percent of Participant B's UCEB (or $40 per month, if greater) would be guaranteed under the phase-in rule.

    Example 6.

    Shutdown benefit with special post-employment eligibility provision. (i) Facts: A plan provides that, in the event of a permanent shutdown of a plant, a participant age 60 or older who terminates employment due to the shutdown and who has at least 20 years of service is entitled to an unreduced early retirement benefit. The plan also provides that a participant with at least 20 years of service who terminates employment due to a plant shutdown at a time when the participant is under age 60 also will be entitled to an unreduced early retirement benefit, provided the participant's commencement of benefits is on or after attainment of age 60 and the time required to attain age 60 does not exceed the participant's years of service with the plan sponsor. The plan imposes no other conditions on receipt of the benefit. Plan provisions were adopted and effective in 1990. On January 1, 2014, Participant C's plant is permanently shut down. At the time of the shutdown, Participant C had 20 years of service and was age 58. On June 1, 2015, Participant C reaches age 60 and retires. The plan terminates as of September 1, 2015.

    (ii) Conclusion: PBGC would determine that the guarantee of the shutdown benefit is phased in from January 1, 2014, which is the date of the only UCE (the permanent shutdown of the plant) necessary to make the benefit payable. Thus 20 percent of Participant C's UCEB (or $20 per month, if greater) would be guaranteed under the phase-in rule.

    Example 7.

    Phase-in of retroactive UCEB. (i) Facts: As the result of a settlement in a class-action lawsuit, a plan provision is adopted on September 1, 2014, to provide that age/service-qualified participants are entitled to an unreduced early retirement benefit if permanently laid off due to a plant shutdown occurring on or after January 1, 2014. Benefits under the provision are payable prospectively only, beginning March 1, 2015. Participant A, who was age/service-qualified, was permanently laid off due to a plant shutdown occurring on January 1, 2014, and therefore he is scheduled to be placed in pay status as of March 1, 2015. The unreduced early retirement benefit is paid to Participant A beginning on March 1, 2015. The plan terminates as of February 1, 2017.

    (ii) Conclusion: PBGC would determine that the guarantee of the UCEB is phased in beginning on March 1, 2015. This is the date the benefit was effective (since it was the first date on which the new benefit was payable), and it is later than the adoption date of the plan provision (September 1, 2014) and the date of the UCE (January 1, 2014). Thus 20 percent of Participant A's UCEB (or $20 per month, if greater) would be guaranteed under the phase-in rule.

    Example 8.

    Removal of IRC section 436 restriction. (i)(A) Facts: A plan provision was adopted on September 1, 1989, to provide that age/service-qualified participants are entitled to an unreduced early retirement benefit if permanently laid off due to a plant shutdown occurring after January 1, 1990. Participant A, who was age/service-qualified, was permanently laid off due to a plant shutdown occurring on April 15, 2014. The plan is a calendar year plan.

    (B) Under the rules of Code section 436 (ERISA section 206(g)) and Treasury regulations thereunder, a plan cannot provide a UCEB payable with respect to an unpredictable contingent event, if the event occurs during a plan year in which the plan's adjusted funding target attainment percentage is less than 60%. On March 17, 2014, the plan's enrolled actuary issued a certification stating that the plan's adjusted funding target attainment percentage for 2014 is 58%. Therefore, the plan restricts payment of the unreduced early retirement benefit payable with respect to the shutdown on April 15, 2014.

    (C) On August 15, 2014, the plan sponsor makes an additional contribution to the plan that is designated as a contribution under Code section 436(b)(2) to eliminate the restriction on payment of the shutdown benefits. On September 15, 2014, the plan's enrolled actuary issues a certification stating that, due to the additional section 436(b)(2) contribution, the plan's adjusted funding target attainment percentage for 2014 is 60%. On October 1, 2014, Participant A is placed in pay status for the unreduced early retirement benefit and, as required under Code section 436 and Treasury regulations thereunder, is in addition paid retroactively the unreduced benefit for the period May 1, 2014 (the date the unreduced early retirements would have become payable) through September 1, 2014. The plan terminates as of September 1, 2016.

    (ii) Conclusion: PBGC would determine that the guarantee of the UCEB is phased in beginning on April 15, 2014, the date the UCE occurred. Because April 15, 2014, is later than both the date the UCEB was adopted (September 1, 1989) and the date the UCEB became effective (January 1, 1990), it would be the date the phase-in period under ERISA section 4022 begins. Commencement of the phase-in period is not affected by the delay in providing the unreduced early retirement benefit to Participant A due to the operation of the rules of Code section 436 and the Treasury regulations thereunder. Thus 40 percent of Participant A's UCEB (or $40 per month, if greater) would be guaranteed under the phase-in rule.

    Start Amendment Part

    6. In § 4022.62(c)(2)(i), add a sentence after the third sentence to read as follows:

    End Amendment Part
    Start Printed Page 25675
    Estimated guaranteed benefit.
    * * * * *

    (c) * * *

    (2) * * *

    (i) * * * “New benefits” also result from increases that become payable by reason of the occurrence of an unpredictable contingent event (provided the event occurred after July 26, 2005), to the extent the increase would not be payable but for the occurrence of the event; in the case of such new benefits, the date of the occurrence of the unpredictable contingent event is treated as the amendment date for purposes of Table I. * * *

    * * * * *
    Start Signature

    Issued in Washington, DC, this 30th day of April 2014.

    Joshua Gotbaum,

    Director, Pension Benefit Guaranty Corporation.

    End Signature End Supplemental Information

    Footnotes

    1.  The Technical Explanation of PPA 2006 prepared by the Joint Committee on Taxation Staff specifies that UCEBs include benefits payable with respect to “facility shutdowns or reductions in workforce.” Joint Committee on Taxation, Technical Explanation of H.R. 4, the “Pension Protection Act of 2006,” as passed by the House on July 26, 2006, and as considered by the Senate on August 3, 2006 (JCX-38-06), August 3, 2006, at 90 (hereinafter Technical Explanation of PPA 2006).

    Back to Citation

    2.  Public Law 100-203, 10 Stat. 1330, 339-41 (codified as amended at 26 U.S.C. 412(l) (1987)); see S. Rep. No. 100-63 at 171-72, 175-76 (1987).

    Back to Citation

    3.  Treasury Regulations under Code sections 430 and 436 also apply for purposes of the parallel rules in ERISA sections 303 and 206(g).

    Back to Citation

    4.  74 FR 53004, 53062 (Oct. 15, 2009). Treas. Reg. § 1.436-1(a)(4)(iii) permits all or any portion of prohibited UCEBs to be restored by a plan amendment that meets the requirements of section 436(c) of the Code and Treas. Reg. § 1.436-1(c) and other applicable requirements. Such an amendment would create a “benefit increase” under § 4022.2 and therefore PBGC's guarantee of UCEBs restored by such an amendment would be phased in from the later of the adoption date of the amendment or the effective date as of which the UCEB is restored, as provided under § 4022.27(c) of the final regulation.

    Back to Citation

    5.  In addition, Treas. Reg. § 1.430(d)-(1)(f)(6) requires that calculation of the funding target for a single-employer plan take into account, based on information as of the valuation date, the probability that UCEBs will become payable. Under that Treasury regulation, the probability may be assumed to be zero if there is not more than a de minimis likelihood that the UCE will occur.

    Back to Citation

    6.  With one exception, explained below under the heading “Bankruptcy filing date treated as deemed termination date,” the other provisions of PPA 2006 affecting PBGC's guarantee do not affect phase-in of the guarantee of UCEBs and thus were not addressed in the proposed rule.

    Back to Citation

    7.  The comment is posted on PBGC's Web site, www.pbgc.gov.

    Back to Citation

    8.  The examples are not an exclusive list of UCEs or UCEBs and are not intended to narrow the statutory definition, as further delineated in Treasury Regulations.

    Back to Citation

    9.  As explained in Technical Explanation of PPA 2006, supra note 1, “layoff benefits,” as that term is used in Treas. Reg. § 1.401-1(b)(1)(i), are severance benefits that may not be included in tax-qualified pension plans. In contrast, the benefits covered in this regulation are retirement benefits payable in the event of certain workforce reductions. These retirement benefits—generally subsidized early retirement benefits—may be provided in tax-qualified plans insured by PBGC.

    Back to Citation

    10.  In contrast, where the plan provides that a UCEB is payable only when all participants are laid off and the plant is permanently shut down, the plan itself has created a benefit trigger that is actually a single event, and therefore phase-in would commence as of the same date for all participants.

    Back to Citation

    11.  By contrast, three other provisions of PPA 2006 that changed PBGC's guarantee of benefits specifically provide changes to the asset allocation scheme under section 4044. See PPA 2006 sections 404 (treatment of bankruptcy filing date as deemed termination date), 402(g)(2)(A) (special termination rules for commercial airlines), and 407 (relating to majority owners), enacting respectively sections 4044(e), 4022(h), and 4044(b)(3) of ERISA.

    Back to Citation

    12.  See definition of “PPA 2006 bankruptcy termination” in § 4001.2.

    Back to Citation

    [FR Doc. 2014-10357 Filed 5-5-14; 8:45 am]

    BILLING CODE 7709-02-P

Document Information

Effective Date:
6/5/2014
Published:
05/06/2014
Department:
Pension Benefit Guaranty Corporation
Entry Type:
Rule
Action:
Final rule.
Document Number:
2014-10357
Dates:
Effective June 5, 2014.
Pages:
25667-25675 (9 pages)
RINs:
1212-AB18: Benefits Payable in Terminated Single-Employer Plans; Limitations on Guaranteed Benefits; Shutdown and Similar Benefits
RIN Links:
https://www.federalregister.gov/regulations/1212-AB18/benefits-payable-in-terminated-single-employer-plans-limitations-on-guaranteed-benefits-shutdown-and
Topics:
Pension insurance, Pensions, Reporting and recordkeeping requirements
PDF File:
2014-10357.Pdf
Supporting Documents:
» Adjustment of Civil Penalties for Inflation
» Allocation of Assets in Single-Employer Plans: Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits
» Benefits Payable in Terminated Single-Employer Plans: Interest Assumptions for Paying Benefits
» Adjustment of Civil Penalties for Inflation
» Agency Information Collection Activities; Proposals, Submissions, and Approvals: Disclosure of Termination Information
» Agency Information Collection Activities; Proposals, Submissions, and Approvals: Mergers and Transfers Between Multiemployer Plans
» Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits
» Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits
» Privacy Act; Systems of Records
» Benefits Payable in Terminated Single-Employer Plans: Interest Assumptions for Paying Benefits
CFR: (4)
29 CFR 4022.2
29 CFR 4022.24
29 CFR 4022.27
29 CFR 4022.62