2021-12574. Rescission of the Source-Specific Federal Implementation Plan for Navajo Generating Station, Navajo Nation  

  • Start Preamble

    AGENCY:

    Environmental Protection Agency (EPA).

    ACTION:

    Final rule.

    SUMMARY:

    The Environmental Protection Agency (EPA) is taking final action to rescind the federal implementation plan (FIP) that regulates emissions from the Navajo Generating Station (NGS), a coal-fired power plant that was located on the reservation lands of the Navajo Nation near Page, Arizona. NGS permanently ceased operations on November 18, 2019, and the Clean Air Act operating permit for this facility has expired.

    DATES:

    This rule will be effective on July 16, 2021.

    ADDRESSES:

    The EPA has established a docket for this action under Docket ID No. EPA-R09-OAR-2021-0018. All documents in the docket are listed on the https://www.regulations.gov website. Although listed in the index, some information is not publicly available, e.g., Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the internet and will be publicly available only in hard copy form. Publicly available docket materials are available through https://www.regulations.gov,, or please contact the person identified in the FOR FURTHER INFORMATION CONTACT section for additional availability information. If you need assistance in a language other than English or if you are a person with disabilities who needs a reasonable accommodation at no cost to you, please contact the person identified in the FOR FURTHER INFORMATION CONTACT section.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Anita Lee, EPA Region IX, (415) 972-3958, lee.anita@epa.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Throughout this document, “we,” “us,” and “our” refer to the EPA.

    Table of Contents

    I. Background

    II. Public Comments and EPA Responses

    III. Final Action

    IV. Statutory and Executive Order Reviews

    I. Background

    On March 16, 2021, the EPA proposed to rescind the FIP for NGS that we promulgated on October 3, 1991 (“1991 FIP”), March 5, 2010 (“2010 FIP”), and August 8, 2014 (“2014 FIP”).[1] The provisions of the 1991 action are codified in the Code of Federal Regulations (CFR) at 40 CFR 52.145(d), the provisions of the 2010 action are codified at 40 CFR 49.5513(a) through (i), and provisions of the 2014 action are codified at 40 CFR 49.5513(j). We refer collectively to the provisions from the 1991, 2010, and 2014 actions as the “FIP” or the “NGS FIP.” The NGS FIP includes federally enforceable emissions limitations that apply to the fossil fuel-fired steam generating equipment, designated as Units 1, 2, and 3, equipment associated with the coal and ash handling, and the two auxiliary steam boilers at NGS. These emissions limitations apply to emissions of particulate matter (PM), opacity, sulfur dioxide (SO2), and oxides of nitrogen (NOX). The EPA is proposing to rescind the NGS FIP and remove the provisions Start Printed Page 31919of the FIP from 40 CFR 52.145(d) and 40 CFR 49.5513.

    NGS was a coal-fired power plant that ceased operation in 2019, located on the reservation lands of the Navajo Nation, just east of Page, Arizona, and approximately 135 miles north of Flagstaff. NGS was co-owned by several entities and operated by Salt River Project Agricultural Improvement and Power District (SRP).[2] The facility consisted of three electric generating units, each with a capacity of 750 megawatts (MW) net generation, with a total capacity of 2250 MW. Operations at the facility produced air pollutant emissions, including emissions of SO2, NOX, and PM. Pollution control equipment at NGS included wet flue gas desulfurization units for SO2 and PM removal, electrostatic precipitators for PM removal, and low-NOX burners with separated over-fire air to reduce NOX formation during the combustion process. Had the facility not ceased operations, the owner or operator of NGS would have taken additional steps by December 31, 2019 to reduce emissions of NOX, pursuant to the requirements of the 2014 FIP.

    The EPA's proposed action published on March 16, 2021 described the EPA's authority to promulgate a FIP in Indian country, provided an historical overview of the NGS FIP actions, and described the EPA's basis for our proposed action to rescind the NGS FIP, including consideration of whether the rescission of the FIP would interfere with any Clean Air Act requirements. Briefly, because NGS has permanently ceased operation and all equipment subject to the NGS FIP is no longer operational, and because the facility no longer holds a valid CAA title V permit to operate, the EPA proposed to rescind the FIP for NGS at 40 CFR 52.145(d) and 40 CFR 49.5513. Please see our proposed rule for additional details.

    II. Public Comments and EPA Responses

    The EPA's proposed action provided a 30-day public comment period that ended on April 15, 2021. During this period, the EPA received two comments, one from a private individual and the other from SRP, both in support of our proposed action to rescind the FIP for NGS.[3] We are not providing responses to these comments because they express support for our proposed action.

    III. Final Action

    For the reasons discussed in detail in the proposed rule and summarized herein, the EPA is taking final action to rescind the FIP for NGS at 40 CFR 52.145(d) and 40 CFR 49.5513.

    IV. Statutory and Executive Order Reviews

    Additional information about these statutes and Executive Orders can be found at http://www.epa.gov/​laws-regulations/​laws-and-executive-orders.

    A. Executive Order 12866: Regulatory Planning and Review and Executive Order 13563: Improving Regulation and Regulatory Review

    This action is not a significant regulatory action and was therefore not submitted to the Office of Management and Budget for review. This rule applies to only one facility and is therefore not a rule of general applicability.

    B. Paperwork Reduction Act (PRA)

    This action does not impose an information collection burden under the PRA because this action does not contain any information collection activities.

    C. Regulatory Flexibility Act (RFA)

    I certify that this action will not have a significant economic impact on a substantial number of small entities under the RFA. This action will not impose any requirements on small entities.

    D. Unfunded Mandates Reform Act (UMRA)

    This action does not contain any unfunded mandate as described in UMRA, 2 U.S.C. 1531-1538, and does not significantly or uniquely affect small governments. The action imposes no enforceable duty on any state, local or tribal governments or the private sector.

    E. Executive Order 13132: Federalism

    This action does not have federalism implications. It will not have substantial direct effects on the states, on the relationship between the national government and the states, or on the distribution of power and responsibilities among the various levels of government.

    F. Executive Order 13175: Coordination With Indian Tribal Governments

    This action does not have tribal implications, as specified in Executive Order 13175. The Navajo Generating Station is located on the reservation lands of the Navajo Nation, and the EPA recognizes there has been significant community and tribal interest in this facility. The facility has already permanently ceased operations and this action simply rescinds previously promulgated requirements applicable to this shuttered facility. In addition, the Navajo Nation EPA has already determined that NGS no longer has the right to operate. This action to rescind the NGS FIP will not have substantial direct effects on any Indian tribes, on the relationship between the federal government and Indian tribes, or on the distribution of power and responsibilities between the federal government and Indian tribes. Thus, Executive Order 13175 does not apply to this action. However, on January 7, 2021, we invited the Navajo Nation to consult on this proposed action.[4] The Navajo Nation did not request consultation on this FIP rescission.

    G. Executive Order 13045: Protection of Children From Environmental Health Risks and Safety Risks

    The EPA interprets Executive Order 13045 as applying only to those regulatory actions that concern environmental health or safety risks that the EPA has reason to believe may disproportionately affect children, per the definition of “covered regulatory action” in section 2-202 of the Executive Order. This action is not subject to Executive Order 13045 because it does not concern an environmental health risk or safety risk.

    H. Executive Order 13211: Actions That Significantly Affect Energy Supply, Distribution, or Use

    This action is not subject to Executive Order 13211, because it is not a significant regulatory action under Executive Order 12866.

    I. National Technology Transfer and Advancement Act (NTTAA)

    This rulemaking does not involve technical standards.Start Printed Page 31920

    J. Executive Order 12898: Federal Actions To Address Environmental Justice in Minority Populations and Low-Income Populations

    The EPA believes that this action is not subject to Executive Order 12898 (59 FR 7629, February 16, 1994) because it does not establish an environmental health or safety standard. The facility has already permanently ceased operations and this action simply rescinds previously promulgated requirements applicable to this shuttered facility. Therefore, the EPA considers this action to have no impacts to human health and the environment, and to have no potential disproportionately high and adverse effects on minority, low-income, or indigenous populations.

    K. The Congressional Review Act

    The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. The EPA will submit a report containing this action and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. A major rule cannot take effect until 60 days after it is published in the Federal Register. This action is not a “major rule” as defined by 5 U.S.C. 804(2).

    L. Judicial Review

    Under section 307(b)(1) of the CAA, petitions for judicial review of this action must be filed in the United States Court of Appeals for the appropriate circuit by August 16, 2021. Filing a petition for reconsideration by the Administrator of this final rule does not affect the finality of this action for the purposes of judicial review nor does it extend the time within which a petition for judicial review may be filed, and shall not postpone the effectiveness of such rule or action. This action may not be challenged later in proceedings to enforce its requirements. (See section 307(b)(2)).

    Start List of Subjects

    List of Subjects

    40 CFR Part 49

    • Environmental protection
    • Administrative practice and procedure
    • Air pollution control
    • Incorporation by reference
    • Indians
    • Intergovernmental relations
    • Reporting and recordkeeping requirements

    40 CFR Part 52

    • Environmental protection
    • Air pollution control
    • Incorporation by reference
    • Intergovernmental relations
    • Particulate matter
    • Reporting and recordkeeping requirements
    • Visibility
    End List of Subjects Start Signature

    Michael S. Regan,

    Administrator.

    End Signature

    For reasons discussed in the preamble, EPA amends Chapter I, title 40, of the Code of Federal Regulations as follows:

    Start Part

    PART 49—INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT

    End Part Start Amendment Part

    1. The authority citation for part 49 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 42 U.S.C. 7401, et seq.

    End Authority

    SUBPART L—IMPLEMENTATION PLANS FOR TRIBES—REGION IX

    [Removed and Reserved]
    Start Amendment Part

    2. Remove and reserve § 49.5513.

    End Amendment Part Start Part

    PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS

    End Part Start Amendment Part

    3. The authority citation for part 52 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 42 U.S.C. 7401, et seq.

    End Authority

    Subpart D—Arizona

    [Amended]
    Start Amendment Part

    4. Section 52.145 amended by removing and reserving paragraph (d).

    End Amendment Part End Supplemental Information

    Footnotes

    1.  The EPA's proposed rule is available at 86 FR 14392 (March 16, 2021). The provisions of the FIP for NGS were published at 56 FR 50172 (October 3, 1991), 75 FR 10174 (March 5, 2010), and 79 FR 46552 (August 8, 2014).

    Back to Citation

    2.  The original participants in NGS were the United States Bureau of Reclamation, SRP, Arizona Public Service Company, Tucson Electric Company, NV Energy, and the Los Angeles Department of Water and Power (LADWP). SRP, serves as the facility operator. Prior to the permanent closure of NGS, SRP acquired the LADWP participant share in NGS.

    Back to Citation

    3.  The comments are available in the docket for this rulemaking at https://www.regulations.gov/​document/​EPA-R09-OAR-2021-0018-0001/​comment.

    Back to Citation

    4.  Letter dated January 7, 2021 from Elizabeth J. Adams, EPA Region IX, to Jonathan Nez, President of the Navajo Nation, Re: Invitation to Consult on a Request from the Salt River Project to Rescind the Federal Implementation Plan for the Navajo Generating Station.

    Back to Citation

    [FR Doc. 2021-12574 Filed 6-15-21; 8:45 am]

    BILLING CODE 6560-50-P

Document Information

Effective Date:
7/16/2021
Published:
06/16/2021
Department:
Environmental Protection Agency
Entry Type:
Rule
Action:
Final rule.
Document Number:
2021-12574
Dates:
This rule will be effective on July 16, 2021.
Pages:
31918-31920 (3 pages)
Docket Numbers:
EPA-R09-OAR-2021-0018, FRL-10024-15-Region 9
Topics:
Administrative practice and procedure, Air pollution control, Environmental protection, Incorporation by reference, Indians, Intergovernmental relations, Particulate matter, Reporting and recordkeeping requirements
PDF File:
2021-12574.pdf
Supporting Documents:
» Rescission of the Source-Specific Federal Implementation Plan for Navajo Generating Station, Navajo Nation
» Category B Documents - Supporting Documents and Correspondence
» Category A Documents: EPA Guidance, Policies, and Rulemakings
» Air Quality State Implementation Plans; Approvals and Promulgations: Rescission of the Source-Specific Federal Implementation Plan for Navajo Generating Station, Navajo Nation
CFR: (2)
40 CFR 49.5513
40 CFR 52.145