-
Start Preamble
Start Printed Page 39329
AGENCY:
Rural Utilities Service, U.S. Department of Agriculture (USDA).
ACTION:
Correcting amendments.
SUMMARY:
On July 9, 2021, the Rural Utilities Service (RUS or Agency), a Rural Development agency of the United States Department of Agriculture (USDA), published a final rule that revised several regulations to streamline its procedures for Electric Program borrowers, including its loan application requirements, approval of construction work plans, contract bidding procedures, contact approval procedures, system operation and maintenance reviews, long-range engineering plans and system design procedures. Following implementation of the final rule, RUS found that a correction due to a deletion is necessary. This technical correction makes an amendment to add information back to the regulation that was inadvertently deleted.
DATES:
Effective July 1, 2022.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Robert Coates, Chief, Policy and Outreach Branch, Office of Customer Service and Technical Assistance, Rural Utilities Service, U.S. Department of Agriculture, STOP 1569, 1400 Independence Ave. SW, Washington, DC 20250-0787, telephone: (202) 720-1900. Email: RUSElectric@usda.gov.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
The Agency is issuing a technical correction to its regulations in 7 CFR part 1714, which were amended by a final rule that published in the Federal Register on July 9, 2021 (86 FR 36193).
Start List of SubjectsList of Subjects in 7 CFR Part 1714
- Electric power
- Loan programs-energy
- Rural areas
Accordingly, 7 CFR part 1714 is corrected by making the following correcting amendments:
Start PartPART 1714—PRE-LOAN POLICIES AND PROCEDURES FOR INSURED ELECTRIC LOANS
End Part Start Amendment Part1. The authority citation for part 1714 continues to read as follows:
End Amendment Part Start Amendment Part2. In § 1714.56, add paragraphs (b)(1) through (3) to read as follows:
End Amendment PartFund advance period.* * * * *(b) * * *
(1) To apply for an extension, the borrower must make a request to RUS prior to the last date for advance as noted in the borrower's loan documents and provide, the following:
(i) A certified copy of a board resolution requesting an extension of the Government's obligation to advance loan funds;
(ii) Evidence that the unadvanced loan funds continue to be needed for approved loan purposes; and
(iii) Notice of the estimated date for completion of construction.
(2) If the Administrator approves a request for an extension, RUS will notify the borrower in writing of the extension and the terms and conditions thereof. An extension will be effective only if it is requested in writing prior to the last date for advance as provided in the borrower's loan documents.
(3) Any request received after the last date for advance shall be rejected.
* * * * *Christopher A. McLean,
Acting Administrator, Rural Utilities Service.
[FR Doc. 2022-14127 Filed 6-30-22; 8:45 am]
BILLING CODE 3410-15-P
Document Information
- Effective Date:
- 7/1/2022
- Published:
- 07/01/2022
- Department:
- Rural Utilities Service
- Entry Type:
- Rule
- Action:
- Correcting amendments.
- Document Number:
- 2022-14127
- Dates:
- Effective July 1, 2022.
- Pages:
- 39329-39329 (1 pages)
- Docket Numbers:
- RUS-21-ELECTRIC-0003
- RINs:
- 0572-AC53: Streamlining and Improving RUS Electric Program Procedures--7 CFR 1710, 1714, 1717, 1718, 1721, 1726, 1730 and 1767
- RIN Links:
- https://www.federalregister.gov/regulations/0572-AC53/streamlining-and-improving-rus-electric-program-procedures-7-cfr-1710-1714-1717-1718-1721-1726-1730-
- Topics:
- Electric power, Loan programs-energy, Rural areas
- PDF File:
- 2022-14127.pdf
- Supporting Documents:
- » Streamlining Electric Program Procedures; Correction
- » Streamlining Electric Program Procedures
- CFR: (1)
- 7 CFR 1714.56