2022-14127. Streamlining Electric Program Procedures; Correction  

  • Start Preamble Start Printed Page 39329

    AGENCY:

    Rural Utilities Service, U.S. Department of Agriculture (USDA).

    ACTION:

    Correcting amendments.

    SUMMARY:

    On July 9, 2021, the Rural Utilities Service (RUS or Agency), a Rural Development agency of the United States Department of Agriculture (USDA), published a final rule that revised several regulations to streamline its procedures for Electric Program borrowers, including its loan application requirements, approval of construction work plans, contract bidding procedures, contact approval procedures, system operation and maintenance reviews, long-range engineering plans and system design procedures. Following implementation of the final rule, RUS found that a correction due to a deletion is necessary. This technical correction makes an amendment to add information back to the regulation that was inadvertently deleted.

    DATES:

    Effective July 1, 2022.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Robert Coates, Chief, Policy and Outreach Branch, Office of Customer Service and Technical Assistance, Rural Utilities Service, U.S. Department of Agriculture, STOP 1569, 1400 Independence Ave. SW, Washington, DC 20250-0787, telephone: (202) 720-1900. Email: RUSElectric@usda.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The Agency is issuing a technical correction to its regulations in 7 CFR part 1714, which were amended by a final rule that published in the Federal Register on July 9, 2021 (86 FR 36193).

    Start List of Subjects

    List of Subjects in 7 CFR Part 1714

    • Electric power
    • Loan programs-energy
    • Rural areas
    End List of Subjects

    Accordingly, 7 CFR part 1714 is corrected by making the following correcting amendments:

    Start Part

    PART 1714—PRE-LOAN POLICIES AND PROCEDURES FOR INSURED ELECTRIC LOANS

    End Part Start Amendment Part

    1. The authority citation for part 1714 continues to read as follows:

    End Amendment Part Start Authority

    Authority: 7 U.S.C. 901 et seq.; 1921 et seq.; and 6941 et seq.

    End Authority Start Amendment Part

    2. In § 1714.56, add paragraphs (b)(1) through (3) to read as follows:

    End Amendment Part
    Fund advance period.
    * * * * *

    (b) * * *

    (1) To apply for an extension, the borrower must make a request to RUS prior to the last date for advance as noted in the borrower's loan documents and provide, the following:

    (i) A certified copy of a board resolution requesting an extension of the Government's obligation to advance loan funds;

    (ii) Evidence that the unadvanced loan funds continue to be needed for approved loan purposes; and

    (iii) Notice of the estimated date for completion of construction.

    (2) If the Administrator approves a request for an extension, RUS will notify the borrower in writing of the extension and the terms and conditions thereof. An extension will be effective only if it is requested in writing prior to the last date for advance as provided in the borrower's loan documents.

    (3) Any request received after the last date for advance shall be rejected.

    * * * * *
    Start Signature

    Christopher A. McLean,

    Acting Administrator, Rural Utilities Service.

    End Signature End Supplemental Information

    [FR Doc. 2022-14127 Filed 6-30-22; 8:45 am]

    BILLING CODE 3410-15-P

Document Information

Effective Date:
7/1/2022
Published:
07/01/2022
Department:
Rural Utilities Service
Entry Type:
Rule
Action:
Correcting amendments.
Document Number:
2022-14127
Dates:
Effective July 1, 2022.
Pages:
39329-39329 (1 pages)
Docket Numbers:
RUS-21-ELECTRIC-0003
RINs:
0572-AC53: Streamlining and Improving RUS Electric Program Procedures--7 CFR 1710, 1714, 1717, 1718, 1721, 1726, 1730 and 1767
RIN Links:
https://www.federalregister.gov/regulations/0572-AC53/streamlining-and-improving-rus-electric-program-procedures-7-cfr-1710-1714-1717-1718-1721-1726-1730-
Topics:
Electric power, Loan programs-energy, Rural areas
PDF File:
2022-14127.pdf
Supporting Documents:
» Streamlining Electric Program Procedures; Correction
» Streamlining Electric Program Procedures
CFR: (1)
7 CFR 1714.56