2012-15763. Third-Party Provision of Ancillary Services; Accounting and Financial Reporting for New Electric Storage Technologies  

  • Start Preamble Start Printed Page 40414

    AGENCY:

    Federal Energy Regulatory Commission, Energy.

    ACTION:

    Notice of Proposed Rulemaking.

    SUMMARY:

    The Federal Energy Regulatory Commission (Commission) proposes to revise certain aspects of its current market-based rate regulations, ancillary services requirements under the pro forma open-access transmission tariff (OATT), and accounting and reporting requirements. Specifically, the Commission proposes to revise its Avista Corp.[1] policy governing the sale of ancillary services at market-based rates to public utility transmission providers and reflect such reforms in Parts 35 and 37 of the Commission's regulations. The Commission also proposes to require each public utility transmission provider to include provisions in its OATT explaining how it will determine Regulation and Frequency Response reserve requirements in a manner that takes into account the speed and accuracy of resources used. Finally, the Commission proposes to revise the accounting and reporting requirements under its Uniform System of Accounts for public utilities and licensees and its forms, statements, and reports, contained in FERC Form No. 1, Annual Report of Major Electric Utilities, Licensees and Others, FERC Form No. 1-F, Annual Report for Nonmajor Public Utilities and Licensees, and FERC Form No. 3-Q, Quarterly Financial Report of Electric Utilities, Licensees, and Natural Gas Companies, to better account for and report transactions associated with the use of energy storage devices in public utility operations.

    DATES:

    Comments are due 60 days after publication in the Federal Register.

    ADDRESSES:

    Comments, identified by docket number, may be filed in the following ways:

    • Electronic Filing through http://www.ferc.gov. Documents created electronically using word processing software should be filed in native applications or print-to-PDF format and not in a scanned format.
    • Mail/Hand Delivery: Those unable to file electronically may mail or hand-deliver comments to: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE., Washington, DC 20426.

    Instructions: For detailed instructions on submitting comments and additional information on the rulemaking process, see the Comment Procedures Section of this document.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Rahim Amerkhail (Technical Information), Federal Energy Regulatory Commission, Office of Energy Policy and Innovation, 888 First Street NE., Washington, DC 20426, (202) 502-8266; Christopher Handy (Accounting Information), Federal Energy Regulatory Commission, Office of Enforcement, 888 First Street NE., Washington, DC 20426, (202) 502-6496; Lina Naik (Legal Information), Federal Energy Regulatory Commission, Office of the General Counsel, 888 First Street NE., Washington, DC 20426, (202) 502-8882; Eric Winterbauer (Legal Information), Federal Energy Regulatory Commission, Office of the General Counsel, 888 First Street NE., Washington, DC 20426, (202) 502-8329.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    139 FERC ¶ 61,245

    Notice of Proposed Rulemaking

    (June 22, 2012)

    1. In this Notice of Proposed Rulemaking (NOPR), the Federal Energy Regulatory Commission (Commission) seeks comment on a package of related proposals developed by the Commission based on comments received in response to a Notice of Inquiry (NOI) [2] issued in this proceeding on June 16, 2011. As the Commission noted in the NOI, there is growing interest in rate flexibility by both purchasers and sellers of ancillary services. A variety of resources are poised to provide ancillary services but may be frustrated from doing so by certain aspects of the Commission's market-based rate policies. At the same time, transmission customers and sellers alike are seeking greater transparency with regard to reserve requirements for ancillary services, with a particular focus on Regulation and Frequency Response. As the Commission has considered ways to foster transparency and competition in ancillary services markets, issues also have arisen related to accounting for and reporting of sales from energy storage devices that, if left unresolved, could impair the ability of these resources to participate in markets for ancillary services and other services subject to the Commission's jurisdiction.

    2. The NOI explored these topics by seeking comment on existing restrictions on third-party provision of ancillary services, irrespective of the technologies used for such provision. The NOI also questioned whether the various cost-based compensation methods for Regulation and Frequency Response service that exist in regions outside of the current organized markets could be adjusted to address the same speed and accuracy issues identified in the proceeding that led to the issuance of Order No. 755.[3] Finally, the NOI sought comment on the adequacy of current accounting and reporting requirements as they pertain to the oversight of the provision of jurisdictional services from energy storage devices.

    3. Based on the comments received in response to the NOI, the Commission proposes to revise certain aspects of its market-based rate regulations, ancillary services requirements under the pro forma open-access transmission tariff (OATT), and accounting and reporting requirements. Specifically, the Commission proposes to revise its Avista Corp. policy governing the sale of ancillary services at market-based rates to public utility transmission providers and reflect such reforms in Parts 35 and 37 of the Commission's regulations.[4] The Commission also proposes to require each public utility transmission provider to include provisions in its OATT explaining how it will determine Regulation and Frequency Response service reserve requirements in a manner that takes into account the speed and accuracy of resources used. Finally, the Commission proposes to revise certain accounting and reporting requirements under its Uniform System of Accounts for public utilities and licensees (USofA) [5] and its forms, statements, and reports, contained in FERC Form No. 1 (Form No. 1), Annual Report of Major Electric Utilities, Licensees and Others,[6] FERC Form No. Start Printed Page 404151-F (Form No. 1-F), Annual Report for Nonmajor Public Utilities and Licensees,[7] and FERC Form No. 3-Q (Form No. 3-Q), Quarterly Financial Report of Electric Utilities, Licensees, and Natural Gas Companies,[8] to better account for and report transactions associated with energy storage devices used in public utility operations. The Commission seeks comment on these proposed reforms.

    I. Background

    4. The Commission has initiated numerous actions over the last several decades to foster the development of competitive wholesale energy markets by ensuring non-discriminatory access and comparable treatment of resources in jurisdictional wholesale markets.[9] With regard to ancillary services, the Commission in Order No. 888 [10] contemplated that third parties (i.e., parties other than a transmission provider supplying ancillary services pursuant to its OATT obligation) could provide ancillary services on other than a cost-of-service basis if such pricing was supported, on a case-by-case basis, by analyses that demonstrated that the seller lacks market power in the relevant product market.[11] Later, in Ocean Vista Power Generation, L.L.C.,[12] the Commission provided guidance regarding such analyses, explaining that as a general matter a study of ancillary services markets should address the nature and characteristics of each ancillary service, as well as the nature and characteristics of generation capable of supplying each service, and that the study should develop market shares for each service.

    5. The Commission subsequently acknowledged in Avista[13] that data limitations can impair the ability of sellers to perform a market power study for ancillary services consistent with the requirements of Ocean Vista. The Commission therefore adopted a policy allowing third-party ancillary service providers that could not perform a market power study to sell certain ancillary services [14] at market-based rates with certain restrictions.[15] In so doing, the Commission reasoned that the backstop of cost-based ancillary services from transmission providers, in effect, limits the price at which customers are willing to buy ancillary services, thus ensuring that the third party sellers' rates would remain just and reasonable even without a showing of lack of market power. However, the Commission found that this backstop failed to provide adequate mitigation of potential third-party market power in three situations: (1) Sales to an RTO or an ISO, which has no ability to self-supply ancillary services but instead depends on third parties;[16] (2) to address affiliate abuse concerns, sales to a traditional, franchised public utility affiliated with the third-party supplier, or sales where the underlying transmission service is on the system of the public utility affiliated with the third-party supplier; and (3) sales to a public utility that is purchasing ancillary services to satisfy its own OATT requirements to offer ancillary services to its own customers.[17]

    6. The Commission's focus in this proceeding is on the third situation above. The concern in this situation has been that if third parties who had not been shown to lack market power were permitted to sell to public utilities seeking to meet their OATT ancillary service obligations, the public utility's ability to recover such purchase costs in OATT rates might lead it to agree to above-market purchases, which would then be incorporated into the public utility's OATT ancillary service rate and gradually increase that rate. This increase in turn would reduce the ability of the cost-based OATT rate to serve as an alternative to the third-party market based rate, and thus undermine the mitigation measure that the Commission relied upon in Avista to enable relaxation of the requirement for a market power analysis.[18] In summary, under existing Commission regulation and policy, a third-party supplier may sell certain ancillary services at market-based rates without showing a lack of market power except under the three circumstances identified above.

    7. Over a decade has passed since the Commission first developed the Avista restrictions. During this time, potential changes to the Avista restrictions have been considered by the Commission on several occasions. In the rulemaking proceeding leading to the issuance of Order No. 697, the Commission sought comment on whether to modify or revise the Avista policy and, if so, how.[19] The Commission ultimately Start Printed Page 40416retained its policy of not allowing sales of ancillary services by a third-party supplier in the three situations identified above, but noted its openness to considering requests for market-based rate authorization to make such sales on a case-by-case basis.[20] Such a request was submitted by WSPP in 2011. Based on the facts in that instance, the Commission rejected WSPP's request as it related to market-based sales by a third-party supplier to satisfy the purchasing transmission provider's own OATT requirements to offer ancillary services to its customers. However, the Commission noted that it was open to new approaches in the evaluation of proposals for sales of ancillary services at market-based rates and encouraged parties to submit proposals that address the Commission's concerns.[21]

    8. In its ongoing effort to foster the development of competitive markets, including those for ancillary services, the Commission has continued to evaluate its Avista policy, in particular the restriction on the sale of ancillary services by third-parties to a public utility that is purchasing ancillary services to satisfy its own OATT requirements to offer ancillary services to its own customers. As the Commission considered potential revisions to the Avista policy, the Commission also has evaluated the extent to which other policies may impair development of ancillary services markets in light of a growing need for ancillary services to support grid functions in the face of potential changes in the portfolio of generation resources, entry of new technologies seeking to provide the service, and the growing interest of sellers and transmission providers to have flexibility in meeting ancillary services needs.[22]

    9. This evaluation led the Commission to issue an NOI in this proceeding to seek comment on whether revising this aspect of the Avista restriction would be appropriate, either by implementing alternative methods of proving a lack of market power or alternative methods of mitigating any potential market power. The NOI also sought comment on cost-based compensation methods for Regulation and Frequency Response service, as well as accounting and reporting requirements as they pertain to oversight of the provision of jurisdictional services from energy storage devices.

    10. Based on the comments received, the Commission includes in this NOPR a package of proposals to facilitate the development of competitive markets for ancillary services, increase transparency for Regulation and Frequency Response reserve requirements, and better account for and report transactions associated with energy storage devices used in public utility operations. The Commission describes each of these proposals in detail below.

    II. Discussion

    A. The Avista Policy

    11. As noted above, the Commission's Avista policy authorizes the sale of certain ancillary services at market-based rates without showing a lack of market power except under specified circumstances. As relevant here, a third-party may not sell ancillary services at market-based rates to a public utility that is purchasing ancillary services to satisfy its own open access transmission tariff requirements to offer ancillary services to its own customers. In order to overcome this restriction, a potential seller must provide a market power study demonstrating a lack of market power for the particular ancillary service in the particular geographic market. However, commenters in response to the NOI note that certain information needed to perform such a market power study is not currently available, effectively precluding them from the opportunity to make such a showing.[23] Whether due to this or other limitations, the effect of the Avista policy is to categorically prohibit sales of ancillary services to public utility transmission providers outside of the RTO and ISO markets.[24]

    12. Some commenters suggest that the current analyses used to evaluate a seller's ability to exercise horizontal market power in the sale of energy and capacity remain sufficient to address market power in ancillary services as well.[25] Other commenters contend that alternative mitigation measures would be appropriate for sellers unable to perform a market power analysis, such as the use of price caps based on the purchasing utility's cost-based OATT ancillary services rates or the use of competitive solicitations.[26] The Commission believes that these suggestions may have merit and has developed potential reforms to the Avista policy to provide greater flexibility to sellers while protecting buyers from the exercise of market power that could lead to unjust and unreasonable or unduly discriminatory or preferential rates. These proposals are discussed further below.

    1. Use of Market Power Analyses

    13. The Commission analyzes horizontal market power [27] for sales of energy and capacity using two indicative screens, the wholesale market share screen and the pivotal supplier screen, to identify sellers that raise no horizontal market power concerns and can otherwise be considered for market-based rate authority.[28] The wholesale market share screen measures whether a seller has a dominant position in the relevant geographic market in terms of the number of megawatts of uncommitted capacity owned or controlled by the seller, as compared to the uncommitted capacity of the entire market.[29] A seller whose share of the relevant market is less than 20 percent during all seasons passes the wholesale market share screen.[30] The pivotal supplier screen evaluates the seller's potential to exercise horizontal market power based on the seller's uncommitted capacity at the time of annual peak demand in the relevant market.[31] A seller satisfies the pivotal supplier screen if its uncommitted capacity is less than the net uncommitted supply in the relevant market.[32]

    14. Passing both the wholesale market share screen and the pivotal supplier screen creates a rebuttable presumption that the seller does not possess horizontal market power; failing either screen creates a rebuttable presumption that the seller possesses horizontal market power.[33] A seller that fails one Start Printed Page 40417of the screens may present evidence, such as a delivered price test (DPT), to rebut the presumption of horizontal market power.[34] In the alternative, a seller may accept the presumption of horizontal market power and adopt some form of cost-based mitigation.[35]

    15. Three of the key components of the analysis of horizontal market power are the definition of products, the determination of appropriate geographic scope of the relevant market for each product, and the identification of the uncommitted generation supply within the relevant geographic market. In Order No. 697, the Commission adopted a default relevant geographic market for sales of energy and capacity.[36] In particular, the Commission will generally use a seller's balancing authority area plus first-tier markets, or the RTO/ISO market as applicable, as the default relevant geographic market. However, where the Commission has made a specific finding that there is a submarket within an RTO, that submarket becomes the default relevant geographic market for sellers located within the submarket for purposes of the market-based rate analysis. The Commission also provided guidance as to the factors the Commission will consider in evaluating whether, in a particular case, to adopt an alternative larger or smaller geographic market instead of relying on the default geographic market. A necessary condition that must be satisfied to justify an alternative market is a demonstration regarding whether there are frequently binding transmission constraints during historical peak seasons examined in the screens and at other competitive significant times that prevent competing supply from reaching customers within the proposed alternative geographic market.[37]

    16. For sales of energy and capacity, the product definitions are well understood, the relevant geographic market is generally the default market described above, and the uncommitted generation supply is generally identified as all such supply located within the seller's balancing authority area plus potential uncommitted imports as determined largely by available transmission capacity in the form of simultaneous import limits.[38] In contrast, defining the product, determining the relevant geographic market, and identifying uncommitted competing resources can be more complex for ancillary services. To date the Commission has not received an acceptable market power analysis for the sale of ancillary services at market-based rates outside of RTO/ISO markets. As noted above, certain commenters in response to the NOI contend that the information necessary to perform a market power analysis outside of RTO/ISO markets is not currently available.[39] Certain other commenters argue that the current analyses used to evaluate a seller's ability to exercise market power in the sale of energy and capacity are sufficient to address market power in ancillary services as well.[40]

    17. Much of the difficulty in acquiring ancillary service-specific data is related to identifying specific resources that are physically capable of providing certain ancillary services. For instance, Schedule 6 Operating Reserve—Supplemental may be provided by generating units that are online but partially unloaded, by quick-start generating units that are offline or by interruptible load or other non-generation resources capable of providing this service.[41] The associated reliability standards definitions indicate that Operating Reserves—Supplemental must be fully available to serve load within the Disturbance Recovery Period, which by default is 15 minutes after a reportable disturbance.[42] Information related to the amount of capacity able to start within 15 minutes and information related to the quantity of load that is interruptible within 15 minutes may not be readily available. In addition, the extent to which a public utility decides to provide this service from partially loaded units is a decision that public utilities make on a day-to-day basis and is dictated in part by the amount of headroom available from the units that are committed and dispatched to serve and follow load. Information related to this kind of decision making is inherently difficult to obtain. This inability to obtain needed information coupled with the fact that certain ancillary services, as detailed further below, have geographic and other limitations gives rise to our interest in considering reforms based on the characteristics of the ancillary service to be provided.

    a. Reliance on Existing Indicative Screens

    18. In light of these issues associated with market power analyses for specific ancillary services, and the comments asserting that the existing market power analyses for sales of energy and capacity may be sufficient for ancillary services as well, the Commission has considered whether passing the existing market-based rate screens described above should create a rebuttable presumption that the seller lacks horizontal market power for ancillary services. As discussed below, the Commission believes that this may be the case for the two imbalance ancillary services (Energy Imbalance and Generator Imbalance), but that alternative definitions of the relevant geographic market and alternative assumptions for identifying potential competing resources within the relevant geographic market may be needed in order to apply the existing indicative screens to other ancillary services.

    19. Units capable of providing Energy Imbalance and Generator Imbalance do not appear to require any different technical equipment or suffer from any different geographical limitations compared to units that provide energy or capacity. As one commenter argues, any available unit in a given geographic market would appear to be capable of providing energy that helps address imbalances in that market.[43] The Commission notes that this position is consistent with the Commission's Start Printed Page 40418decision in Order No. 890-A to base cost-based imbalance charges in the OATT on the incremental cost of the last 10 MW dispatched by the transmission provider for any purpose, without imposing any requirement that this last 10 MW be based on resources with any particular capabilities.[44] To the extent that there are no unique technical requirements or limitations that apply to the provision of Energy Imbalance or Generator Imbalance, it would follow that the market-based rate screens for energy and capacity would consider the same set of units as a market power analysis designed for those two ancillary services.

    20. Accordingly, the Commission proposes to revise its regulations governing market-based rate authorizations to provide that sellers passing existing market-based rate analyses in a given geographic market should be granted a rebuttable presumption that they lack horizontal market power for sales of Energy Imbalance and Generator Imbalance ancillary services in that market. Specifically, section 35.37 of the Commission's regulations would be revised to state that a seller would have a rebuttable presumption it lacks market power with respect to sales of energy, capacity, energy imbalance service, and generator imbalance service if the seller passes the pivotal supplier analysis based on annual peak demand of the relevant market and a market share analysis applied on a seasonal basis. The Commission preliminarily concludes that expanding the rebuttable presumption adopted in Order No. 697 for energy and capacity to include Energy Imbalance and Generator Imbalance provides adequate protection that market-based rates charged by public utilities will be just and reasonable and not unduly discriminatory or preferential. The Commission notes that this proposal would not constitute a revision to the Avista policy. Rather, this proposal merely finds that the existing market power screens can be applied to analysis of market power for Energy Imbalance and Generator Imbalance. As a result, sellers who pass the existing market power screens would not be subject to the sales restrictions otherwise required under the Avista policy. The Commission seeks comment on this proposal, including the proposed revisions to part 35.37(c)(1) of our regulations, and its application to Energy Imbalance and Generator Imbalance services. Comments may address, among other things, any unique technical requirements or limitations that might apply to the provision of the ancillary imbalance services, and the Commission's proposal to extend the rebuttable presumption to imbalance services.

    21. There appear to be significant technical requirements or limitations that apply to the provision of ancillary services other than Energy Imbalance and Generator Imbalance such that the existing market-based rate screen may not be adequate to capture the potential horizontal market power of sellers of these other ancillary services. Technical considerations may limit the units capable of providing Reactive Supply and Voltage Control, Regulation and Frequency Response, Operating Reserve-Spinning, and Operating Reserve-Supplemental services as compared to the broader set of units capable of providing energy or capacity potentially requiring the identification of a different geographic market than the default geographic market used to conduct market power analyses for sales of energy and capacity and a change to the assumptions used to identify potential competing resources within that market. For example, the size of the relevant geographic market for a particular ancillary service may be subject to change based on system conditions and the need to meet applicable reliability criteria. The balancing authority may at times be able to procure ancillary services on a system-wide basis, whereas at other times factors may require the balancing authority to procure ancillary services on a zonal or even more location-specific basis. Further, not every facility that has the capability to provide energy will have the capability to provide every ancillary service. Also, the procurement may involve commercially sensitive internal decision-making that determines what proportion of a unit's total capability will be dedicated to a particular ancillary service instead of energy and capacity.

    22. With regard to Operating Reserve—Spinning and Operating Reserve—Supplemental, the Commission recognizes that resources used to provide these services are maintained to convert to energy if needed, as with imbalance services. However, minimum ramp rate requirements and stringent minimum start-up rates for off-line resources used for supplemental reserves apply to the provision of Operating Reserve—Spinning and Operating Reserve—Supplemental. For on-line resources, not all types of units may be capable of extended periods of operation below their fully loaded set point, or such operation may be prohibitively uneconomic.

    23. With regard to Reactive Supply and Voltage Control, technical and geographic considerations generally limit the units capable of providing this ancillary service as compared with the broader set of units capable of providing energy or capacity. In order to provide Reactive Supply and Voltage Control service, conventional synchronous generators must be able to vary the voltage level of their electrical output. Not all synchronous generators may choose to operate in a way that provides Reactive Supply and Voltage Control service. Similarly, non-traditional asynchronous resources require some other power electronic controls in order to provide this ancillary service, and not all owners of asynchronous resources choose to install the needed controls. Further, non-generation resources may be technically capable of providing this ancillary service with appropriate controls, but they may not all choose to install the needed controls. Finally, as recognized in numerous venues and proceedings including Order No. 888, losses of reactive power during transmission may be significantly greater than losses incurred in delivering real power, meaning that reactive power must often be supplied from local resources.[45] Therefore, the appropriate relevant geographic market for Reactive Supply and Voltage Control service could be smaller than the default geographic market discussed above and even within that reduced geographic market, not all resources may be capable of competing to provide this particular ancillary service. Moreover, conventional resources generally require Automatic Generation Control (AGC) equipment in order to provide Regulation and Frequency Response service, while non-traditional resources require power electronic controls that perform like AGC. Not all units have AGC or power electronic controls that perform like AGC. Therefore, a different set of competing resources might need to be identified within the default geographic market for Regulation and Frequency Response service.

    24. The Commission seeks comments on whether the technical requirements Start Printed Page 40419for Operating Reserve—Spinning, Operating Reserve—Supplemental, Reactive Supply and Voltage Control, and Regulation and Frequency Response would necessitate a market power analysis based on a different geographic market or different set of resources as compared to those analyzed to determine market power for sales of energy and capacity. If so, we seek comment on how the relevant geographic market can be identified and how potentially competing resources with the needed characteristics can be identified within the relevant geographic market. Finally, we seek comment on whether the limited reporting requirement and optional market power screen, discussed further below, could be applicable for assessing the market power of potential sellers of these ancillary services.

    b. Optional Market Power Screen

    25. Several commenters to the NOI support the idea of developing alternative analyses for measuring market power for ancillary services,[46] while others propose that new reporting requirements be imposed to facilitate sellers' ability to perform market power analyses for ancillary services markets.[47] Upon review of these comments, the Commission proposes a limited new reporting requirement that would provide potential sellers of ancillary services [48] with the information needed to develop market power analyses using an optional market power screen solely applicable to ancillary services. Specifically, the Commission proposes to require each public utility transmission provider to publicly post on its OASIS information as to the aggregate amount (MW or MVAR, as applicable) of each ancillary service that it has historically required, including any geographic limitations it may face in meeting such ancillary service requirements.[49] For example, a hypothetical transmission provider may report that it has historically maintained 100 MW of Regulation and Frequency Response reserves for its balancing area and 100 MVAR of Reactive Supply and Voltage Control in each of two submarkets within its balancing authority area.

    26. The optional market power screen for an ancillary service would then compare the amount of capacity in MWs (or, as applicable, MVARs) that a potential seller can dedicate to providing the ancillary service in the relevant geographic market with the buyer's reported aggregate requirement for that ancillary service, taking into account any reported historical locational requirements (e.g., locational requirements due to such things as binding transmission constraints or the geographic limitations of Reactive Supply). Using this optional market power screen, sellers whose available capacity is no more than 20 percent of the relevant reported aggregate requirement for an ancillary service would then receive a rebuttable presumption that they lack horizontal market power for the ancillary service in question.

    27. The Commission recognizes that this approach would be an alternative to the Commission's historical approach to conducting market power analyses, though we believe it is consistent with the principles by which we developed our market power analyses. Moreover, this approach would be limited solely to market power analyses of ancillary services and would be permitted because of the lack of publicly-available information on the potential supply of various ancillary services in a given geographic market. In Ocean Vista the Commission explained that as a general matter, a study of ancillary service markets should address the nature and characteristics of each ancillary service, as well as the nature and characteristics of generators capable of supplying each service, and the study should develop market shares for each service.[50] Of particular relevance here, the Commission stated that the market power analysis for ancillary services markets should identify the relevant geographic market, which could include all potential sellers of the product from whom the buyer could obtain the service, taking into account relevant factors which may include the other sellers' locations, the physical capability of the delivery system and the cost of such delivery, and important technical characteristics of the sellers facilities.[51]

    28. The proposed approach discussed above is consistent with these principles. Identification of the aggregate requirement for each ancillary service within the balancing authority area serves as a proxy for the identification of the amount and location of resources that may be technically capable of providing the requisite service in the relevant geographic market, without requiring resource-specific information for resources currently providing the service. The Commission has allowed use of proxies for various inputs to the indicative screens to simplify or streamline the analyses,[52] and in particular has stated that a seller, where appropriate, can make certain simplifying assumptions, such as performing the indicative screens assuming that the relevant market has no import capability (this was modified in later orders to mean no competing imports) or treating the host balancing authority area utility as the only other competitor.[53] Essentially, the proposed proxy would treat the resources used historically by the host balancing authority area utility as the only other competing resources for purposes of market share analysis. This proxy would take into account the nature and characteristics of each ancillary service, as well as the nature and characteristics of resources capable of supplying each service and any limitations such as deliverability that have historically affected designation of resources to provide the ancillary service. The proposed approach would allow potential third party sellers to compare their ancillary service capacity to the capacity that has historically been needed to provide the service as shown by the relevant transmission provider's OASIS posting of ancillary service Start Printed Page 40420requirements, and calculate a market share on that basis.

    29. The Commission preliminarily concludes that this approach will foster transparency and competition in the provision of ancillary services by providing information for ancillary service sellers to perform the market power analyses required by the Commission's rules while continuing to provide protection for customers from the potential exercise of market power. As with the expansion of the rebuttable presumption for energy and capacity to include Energy Imbalance and Generator Imbalance proposed above, the optional power market screen for ancillary services proposed here would not constitute a revision to the Avista policy. Rather, it merely would provide another means of demonstrating a lack of market power in sales of ancillary services. As a result, sellers who pass this optional market power screen would not be subject to the sales restrictions otherwise required under the Avista policy.

    30. The Commission seeks comment on whether the proposed limited OASIS reporting requirement combined with the opportunity to use an optional market power screen for ancillary services, as described above and in proposed new parts 37.6(k) and 35.37(c)(5) respectively of our regulations, will provide adequate protection that market-based rates charged by public utilities will be just and reasonable and not unduly discriminatory or preferential. The Commission also requests that commenters address the use of the optional screen for Energy and Generator Imbalance ancillary services given the Commission's proposal above that sellers passing existing market-based rate analyses in a given geographic market should be granted a rebuttable presumption that they lack horizontal market power for sales of Energy Imbalance and Generator Imbalance ancillary services in that market. Additionally, the Commission requests comments on the appropriate level of detail to include in the proposed reporting requirement. The Commission is aware that balancing areas determine reserve requirements in different ways; for example, some may have static reserve requirements updated once a year, while others specify reserve requirements as a percentage of load, meaning that their reserve amounts can change throughout a year. The Commission does not at this time intend to change how balancing areas determine their reserve amounts. Rather, we wish the proposed OASIS reporting requirement to adequately capture whatever method the balancing area employs and be detailed enough to support the proposed optional market power screen. For example, if ancillary service reserve requirements change periodically throughout a year, should the associated OASIS posting show the different amounts of reserve procurement with their associated time periods or should the OASIS posting show a single average reserve procurement amount for the year? The Commission also asks for comments on whether the optional market power screen should only be implemented on an experimental basis until the Commission has more experience with the evolution of ancillary service markets and in reviewing the quality of optional market power screens.

    2. Alternative Cost-Based Mitigation

    31. The NOI also sought comment on alternative mitigation measures to the prohibition adopted in Avista with regard to sales to a public utility that is purchasing ancillary services to satisfy its own OATT requirements to offer ancillary services to its own customers. In particular, the Commission sought comment on the possibility of relying on an explicit price cap based on the purchasing utility's cost-based OATT ancillary service rates or the use of competitive solicitations. Based on a review of the resulting comments, the Commission seeks further comment regarding whether the specific alternative cost-based mitigation measures described below that would allow third-party sales to a public utility without showing a lack of market power are adequate to ensure that rates charged by third parties for Regulation and Frequency Response, Operating Reserve-Spinning, or Operating Reserve-Supplemental service will be just and reasonable and not unduly discriminatory or preferential. In addition, while the Avista policy did not apply to Reactive Supply and Voltage Control service, the Commission seeks comment on whether third-party sales of Reactive Supply and Voltage Control service to a public utility to satisfy its own OATT obligations should be permitted under one of the price cap options discussed below.

    32. Specifically, the Commission proposes to permit sellers unable or unwilling to perform the market power study for ancillary services to propose price caps at or below which sales of Regulation and Frequency Response, Reactive Supply and Voltage Control, Operating Reserve-Spinning, or Operating Reserve-Supplemental service would be allowed where the purchasing entity is a public utility purchasing ancillary services to satisfy its own OATT requirements to offer ancillary services to its own customers. Such a price cap would be based on one of the two possible OATT ancillary service rate caps discussed below and, as in Avista, we propose that sales under these price caps would only be permitted in geographic markets where the seller has been granted market-based rate authority for sales of energy and capacity. Alternatively, a seller unable to perform a market power study for ancillary services could rely on competitive solicitations meeting certain minimum requirements in order to make sales in geographic markets where the seller has been granted market-based rate authority for sales of energy and capacity.

    a. Use of Price Caps

    33. As noted above, the Commission in the NOI explored the idea of using price caps based on the purchasing utility's OATT rates to serve as an alternative mitigation to the Avista policy. Use of price caps or other proxies is not unprecedented. For example, the Commission has long permitted cost-of-service sellers to propose cost-justified ceiling rates to allow the seller to respond quickly to market opportunities by discounting below the approved ceiling.[54] In many respects the cost-based ceiling rate umbrella tariffs of decades past may have helped begin the development of bilateral markets for energy and capacity, and we believe the development of bilateral markets for ancillary services today may similarly benefit from the availability of appropriate price cap options. Below we propose two options for comment.

    34. First, third parties would be permitted to sell to a public utility buyer at rates not to exceed the buying public utility transmission provider's existing OATT rate for the same ancillary service. The Commission anticipates that this option should be relatively non-controversial to implement as the buyer's OATT ancillary service rates will have already been found to be just and reasonable. However, we recognize that in some situations this type of price cap may do Start Printed Page 40421little to signal a buyer's interest in the procurement of ancillary services or reflect the actual practices in a region, which may include pooling or sharing of reserves. Rather, a policy that relies on the rate of a single buyer may serve as a disincentive to the entry of additional resources to provide ancillary services and ultimately undermine the goal we are trying to achieve of providing sellers some flexibility while ensuring just and reasonable rates. The Commission also appreciates that an individual buyer's OATT ancillary service rates may be higher or lower than the cost of new entry and that they do not necessarily signal whether investment is needed to provide the service.

    35. Notwithstanding these potential limitations of relying on a cap at the buying public utility transmission provider's OATT ancillary service rate, the Commission believes that such a cap could provide a means of mitigating the potential market power of sellers unable to perform a market power analysis. Furthermore, a price cap based on the buyer's OATT ancillary service rate may best match the geographic limitations of an ancillary service like Reactive Supply and Voltage Control, and may provide the simplest route to expanded supply at just and reasonable rates for service areas that require more Reactive Supply and Voltage Control. The Commission seeks comment on whether this cost-based cap would provide an effective alternative to imposition of the Avista restriction for mitigating potential market power. The Commission also seeks comment on whether this type of cap would induce the provision of ancillary services, particularly from parties who believe that this cap would be beneficial to their efforts to buy or sell specific ancillary services, such as Reactive Supply and Voltage Control. We also seek comment on whether the Commission should require additional transparency provisions to accompany such a cap beyond electric quarterly reports. These provisions may include the transmission provider posting its need for ancillary services and any seller responses.

    36. Under the second option, third parties could propose to sell a given ancillary service to a public utility buyer at rates not to exceed the highest public utility transmission provider OATT rate within the relevant geographic market for physical trading of the ancillary service in question. Under this type of regional price cap, the seller (or group of sellers) would be required to file with the Commission a proposal that defines the scope of a contiguous geographic region that both encompasses the service territory(ies) of the public utility transmission provider whose OATT ancillary service rate will form the basis for the price cap, and within which trading of the ancillary service in question is physically possible. Using the highest OATT ancillary service rate as a price cap for a predefined market area with the characteristics above may address some of the potential limitations of a price cap based on an individual public utility transmission provider OATT identified above. Additionally, it may be a more reasonable approximation of the cost of new entry within a market where physical trading of the ancillary service in question is possible.

    37. Such a regional price cap proposal could be proposed for any contiguous trading area within which the filer or filers propose to make physical trades of ancillary services. The Commission anticipates that this trading area often may include the seller's home balancing authority area plus first-tier balancing authority areas and possibly additional areas where transmission capacity is available. However, the Commission is concerned that sellers could seek to define regions that are unrealistically broad in order to access a high OATT ancillary service rate from outside their region that may not be appropriate elsewhere. To prevent this type of distortion, the Commission proposes to require price cap sellers to show that the ancillary services in question can be physically traded throughout the region they propose for a given ancillary service price cap. Such a showing would need to take into account the technical characteristics of the ancillary service in question in order to demonstrate the physical ability to trade in the proposed market area. For example, because of their different characteristics, a contiguous geographic region within which it is physically possible to trade Operating Reserve-Spinning is likely to be much greater than any contiguous geographic region within which it is physically possible to trade Reactive Supply and Voltage Control. We seek comment on the types of information available to make such a showing.

    38. Also, because different sellers proposing to sell the same ancillary service could conceivably propose different but overlapping trading regions, which might result in multiple regional price caps applying to sales in the overlapping areas, the Commission seeks comment on whether this type of overlap should be permitted. If not, the Commission seeks comment on ways to prevent such overlap in the definition of trading regions. In a similar vein, the Commission also recognizes the possibility that some sellers may propose a regional price cap for a given trading area, while other sellers in the same trading area may propose to sell to specific buying public utilities under the other price cap option discussed above; a price cap set at the buying public utility's relevant OATT ancillary service rate. The Commission seeks comment on whether this type of overlap should be permitted and, if not, on ways it could be prevented.

    39. As discussed earlier, the Commission recognizes that the single-public utility price cap option may best match the geographic limitations associated with Reactive Supply and Voltage Control service. Should the Commission, as a result, exclude Reactive Supply and Voltage Control from the list of ancillary services eligible for a regional price cap proposal, meaning that Reactive Supply and Voltage Control could only be sold under a price cap based on the buying public utility's OATT rate for Reactive Supply and Voltage Control?

    40. The Commission proposes to amend its regulations at part 35.38 to provide that either of the OATT-based price caps described above can be proposed as mitigation of potential horizontal market power in ancillary services for those sellers who fail or forego relevant, properly defined market power screens for the ancillary service in question. The Commission preliminarily concludes that either cap could serve as an alternative method of ensuring just and reasonable rates for ancillary services that would, unlike the Avista mitigation scheme, permit willing buyers and sellers of ancillary services to transact, and thus provide a means of increasing the supply of needed ancillary services in a timely and cost-effective manner. The Commission seeks comment on its proposal, including whether these price caps will provide an effective mitigation measure as an alternative to imposition of the Avista restriction, and how the Commission should address the other questions described above.

    b. Competitive Solicitations

    41. The NOI also sought comment regarding whether transmission providers' use of open and transparent competitive solicitations could facilitate the provision of ancillary services and ensure just and reasonable rates. The Commission sought comment regarding whether a standardized competitive solicitation process could be developed for particular regions or markets.Start Printed Page 40422

    42. While commenters are generally supportive of the use of competitive solicitations, some contend that competitive solicitations should not be the only option for mitigating market power concerns because past solicitations for ancillary services have not always produced enough interest to ensure a competitive outcome, and this may continue to be the case for some time to come.[55] WSPP also argues that competitive solicitations are probably impractical for short-notice transactions that would commence within a month or less.[56] However, others appear to suggest that the Commission mandate that all ancillary services be procured through competitive solicitations.[57]

    43. The comments on this issue indicate that competitive solicitations may not be appropriate for all transactions and may not be sufficient to mitigate potential market power in the sale of ancillary services in every circumstance. However, this does not mean that competitive solicitations should not be available as an option for mitigating potential market power concerns. The Commission proposes to allow applicants to engage in sales to a public utility that is purchasing ancillary services to satisfy its OATT requirements to offer ancillary services to its own customers where the sale is made pursuant to a competitive solicitation that meets the following requirements.

    44. Specifically, the Commission has stated that the following four guidelines help determine if a competitive solicitation process satisfies the principle that no affiliate should receive undue preference during any stage of a request for proposals: (1) Transparency: the competitive solicitation process should be open and fair; (2) definition: the product or products sought through the competitive solicitation should be precisely defined; (3) evaluation: evaluation criteria should be standardized and applied equally to all bids and bidders; and (4) oversight: an independent third-party should design the solicitation, administer bidding, and evaluate bids prior to the company's selection.[58]

    45. While the Commission originally issued these guidelines for the purpose of preventing undue affiliate preference, we believe they are also applicable in the context of using competitive solicitations to help mitigate the potential exercise of horizontal market power by sellers of ancillary services. However, even if a solicitation process meets all of these guidelines, it may still fail to attract sufficient numbers of sellers to properly discipline resulting market prices. Accordingly, for purposes of a mitigation proposal applicable to market-based sales of ancillary services, the Commission proposes to require entities filing such a proposal to demonstrate to the Commission that the solicitation attracted sufficient seller interest to properly discipline market prices. This showing would be required in addition to the four criteria listed above. The Commission believes that all of these requirements in combination will protect against horizontal market power and thereby ensure just and reasonable rates. We seek comment on this proposal and encourage commenters to develop ideas for ways in which competitive solicitations can be structured to accommodate near-term transactions.

    46. Consistent with the discussion above, the Commission proposes to amend section 35.38 of its regulations to provide the opportunity for public utilities seeking waiver of the Avista restriction to rely on competitive solicitations meeting the Commission's requirements for transparency, definition, evaluation, oversight, and adequate seller interest.

    B. Resource Speed and Accuracy in Determination of Regulation and Frequency Response Reserve Requirements

    47. In addition to exploring potential changes to the Commission's requirements for market-based rate authority discussed above, the NOI also sought comment on whether the various cost-based compensation methods for Regulation and Frequency Response service that exist in regions outside of the current organized markets could be adjusted to address the issues identified in the proceeding that led to the issuance of Order No. 755.[59] In that proceeding, the Commission required changes to compensation mechanisms for Regulation and Frequency Response service in the RTO and ISO markets to ensure that all resources providing service are compensated in a just and reasonable and not unduly discriminatory manner. While acknowledging that the specific reforms ultimately adopted in Order No. 755 would not apply outside of RTOs and ISOs, the NOI questioned whether the underlying goal of better valuing the benefits of faster, more accurate provision of Regulation and Frequency Response service could be achievable in other ways outside of RTOs and ISOs.

    48. Specifically, the NOI sought comment on: (1) How a cost-based cap for Regulation and Frequency Response service in the WSPP Agreement [60] could be structured to reflect an individual resource's performance; (2) whether transmission customers that self-supply Regulation and Frequency Response service could be permitted to determine the amount of capacity they procure based on the third-party resource's performance capability; and (3) any other way to extend the goals of the Frequency Regulation Compensation NOPR,[61] which ultimately resulted in Order No. 755, outside of the ISOs and RTOs.

    49. Most of the more concrete NOI comments on this issue focus on the second question above: whether transmission customers that self-supply Regulation and Frequency Response Start Printed Page 40423service could be permitted to determine the amount of capacity they procure based on the third-party resource's performance capability.[62] Some commenters suggest that customers choosing to self-supply Regulation and Frequency Response service from faster-acting resources should be allowed to self-supply a lower volume of regulation capacity.[63] Powerex suggests that each balancing authority be required to maintain well-defined criteria under which a transmission customer self-providing ancillary service reserves can adjust the level of reserves based on the ramping capability of the resources it uses.[64] Bonneville states that, in such circumstances, the balancing authority should make the determination as to the appropriate level of capacity procurement, not the customer itself.[65]

    50. Under the existing requirements of the pro forma OATT, each public utility transmission provider is required to provide its transmission customers with the option of self-supplying certain ancillary services, including Regulation and Frequency Response service.[66] This self-supply option has been clear since Order No. 888 and, therefore, public utility transmission providers must be prepared to provide self-supply requirements on request from a transmission customer. However, the Commission to date has not addressed the extent to which such requirements should reflect the characteristics of particular resources being used to provide Regulation and Frequency Response service.

    51. The Commission proposes to require that each public utility transmission provider submit provisions for inclusion in its OATT that take into account the speed and accuracy of regulation resources in determining its Regulation and Frequency Response reserve requirements.[67] These provisions must include a description of how the public utility transmission provider would make adjustments to the capacity requirement when a customer opts to self-supply its requirements, including through purchases from third-parties, using resources with speed and accuracy characteristics that differ from the set of resources otherwise being used for Regulation and Frequency Response. This description could include the set of resources the public utility transmission provider uses to provide Regulation and Frequency Response service, indicating the capacity typically set aside from each resource and the ramp rate associated with each resource. The description needs to provide enough detail to allow an entity wishing to self-supply to compare the resources it proposed to use to the resources the public utility transmission provider is using to provide Regulation and Frequency Response service. Presumably, this adjustment could be in either direction: down if the customer self-supplies with faster or more accurate resources or up if it uses slower or less accurate resources.

    52. The Commission preliminarily finds that accounting for speed and accuracy in a public utility transmission provider's determination of Regulation and Frequency Response reserve requirements is necessary to address the potential for undue discrimination against customers choosing to self-supply their Regulation and Frequency Response needs, including through purchases from third-parties. The Commission is concerned that a public utility transmission provider could engage in undue discrimination by requiring such customers to procure a different amount of regulation reserves than the particular speed and accuracy characteristics of the resources in question justify. Accordingly, the Commission proposes to amend its regulations at part 35.28 to require that public utility transmission providers amend their OATTs at Schedule 3 (Regulation and Frequency Response Service) to explain how they will take into account the speed and accuracy of regulation resources in determining Regulation and Frequency Response reserve requirements. The Commission acknowledges that each public utility transmission provider has unique needs related to Regulation and Frequency Response reserve requirements and, accordingly, may account for speed and accuracy in different ways. Therefore, the Commission does not at this time seek to mandate a particular methodology but instead expects that it would evaluate each proposed determination relevant to Regulation and Frequency Response reserve requirements on a case-specific basis.

    53. The Commission seeks comment on this proposal, including comment on how speed and accuracy can be taken into account in the determination of Regulation and Frequency Response reserve requirements, and the Commission's preliminary conclusion that requiring transparency in the determination of Regulation and Frequency Response reserve requirements will help prevent undue discrimination in the form of public utility transmission providers requiring self-supplying customers to procure a different amount of regulation reserves than the particular speed and accuracy characteristics of the resources in question justify.

    54. Further, in consideration of the comments regarding the ability of a customer to self-supply ancillary services, we take this opportunity to remind public utility transmission providers that they are already required to post on their public Web sites all rules, standards, and practices, to the extent they exist, that relate to transmission service. This includes the provision of ancillary services which are necessary to the provision of transmission service. As such, the obligation is clear and we see no need at this time to propose reforms.[68]

    C. Accounting and Reporting for Energy Storage Operations

    55. Finally, the NOI also asked about the Commission's accounting and reporting requirements for energy storage operations. Comments were sought on what changes, if any, should be made to the Commission's accounting and reporting regulations to provide for energy storage services, assets and operations. Comments were received from public utilities, industry associations, government agencies, and others. As noted in the NOI, the accounting regulations currently found in the USofA and the related reporting Start Printed Page 40424requirements were developed to capture financial and operational information along traditional primary business functions—production, transmission, and distribution of electric energy.[69] Further, as also noted, energy storage assets can have operating characteristics of each of these functions and some may be capable of performing multiple functions simultaneously.[70] Accordingly, entities using energy storage assets may seek multiple methods of cost recovery for their investments in and use of a single energy storage asset to provide various utility services.[71]

    56. Numerous comments were received regarding the need for updating the USofA and Form Nos. 1 and 1-F for the accounting and reporting of public utilities. Most commenters are supportive of making amendments to accommodate energy storage transactions. However, some commenters indicate that the Commission's current accounting and reporting requirements sufficiently accommodate these types of transactions.

    57. In general, commenters that support amending the current accounting and reporting requirements indicate that the operating nature of energy storage assets is different from typical electric plant assets. These commenters indicate that energy storage assets can be used to serve multiple purposes—production, transmission, or distribution—whereas traditional electric plant assets only serve one purpose. Consequently, they explain that this difference in capabilities can mandate, in certain cases, that the energy storage assets be accounted for differently than traditional electric plant assets. These commenters indicate that changes to the accounting and reporting requirements are needed to address concerns about the potential for cross-subsidization and double or over-recovery of costs in instances where an energy storage asset is simultaneously included in cost-based and market-based rates. Most of these commenters recommend specific accounting and reporting amendments that could assist with protecting against these concerns and certain other commenters in this group expressed that the concern existed but offered no recommendations. For example, Electricity Consumers did not propose specific accounting changes; however, it indicates that it supports accounting treatments that could enhance cost transparency to protect against double-recovery of costs.[72]

    58. Several commenters recommend that the Commission create a new energy storage functional classification with associated plant and operation and maintenance (O&M) expense accounts for energy storage assets and operations. TAPS states that because the functional use of a given energy storage facility may change over time and may not fit neatly into any one existing functional category, and because energy storage facility costs may come to be recovered through storage-specific rate schedules, the only transparent and administratively efficient way to account for energy storage plant costs is by adding new accounts to the USofA.[73] TAPS contends that the overall objective of any changes should be to support either effective cost-based regulation of jurisdictional services provided using energy storage resources, or effective market power monitoring and mitigation.[74] APPA agrees with TAPS' comments.[75]

    59. The Public Interest Organizations state that a separate asset class may prove the best way to provide full and comparable treatment for energy storage facilities.[76] NGK/TI argues that a new functional classification is needed because energy storage assets are functionally distinct from traditional production, transmission, and distribution assets and energy storage functions cross-cut these traditional functions.[77]

    60. Other commenters recommend that the Commission create new plant and O&M expense accounts within the existing functional classifications of production, transmission, and distribution rather than creating a new functional classification specifically for energy storage. FirstEnergy states that new energy storage technologies may provide transmission, distribution, or production services, and the current USofA adequately provides for facilities and activities that provide these functions. However, FirstEnergy states that the USofA does not provide the necessary accounting transparency for new storage technologies. FirstEnergy recommends that the Commission establish new accounts within the currently established functions to provide additional accounting transparency and detail regarding the plant costs and O&M expenses of energy storage facilities that serve these functions.[78] FirstEnergy states that the accounting should strive for transparency by identifying each type of asset with the primary function it serves and aligning the expenses associated with the asset with the revenues it provides. SDG&E contends that energy storage assets should be classified in the existing classifications as production, transmission, or distribution as determined by the owner of the assets and consistent with the jurisdictional nature of the service that the energy storage device provides.[79]

    61. Commenters opposed to amending the current accounting and reporting requirements generally argue that the existing requirements adequately accommodate energy storage technologies. CAREBS asserts that the Commission's goal should be to use, where possible, existing accounting methods rather than invent new ones. SolarReserve argues that because many sales of ancillary services would be made under sellers' market-based rate authority, the sellers would have waivers of the accounting and reporting requirements at issue here.[80] Thus, in SolarReserve's opinion, there is no need to amend the Commission's accounting and reporting requirements.

    62. California Storage Alliance and ESA indicate that if the Commission decides against creating new energy storage plant accounts and instead proposes to use existing plant accounts to account for energy storage resources, there would need to be changes to existing plant accounts to better capture energy storage plant costs. In this instance, California Storage Alliance and ESA recommend that the Commission revise the instructions of current plant accounts to explicitly include energy storage resources.[81]

    63. Responding to concerns about the potential for cross-subsidization in instances where an energy storage resource simultaneously provides multiple services under cost-based and market-based cost recovery mechanisms, EEI reasons that the Commission's current policies can address concerns of cross-subsidization. EEI states that a jurisdictional entity should separately account for services sold under cost-based rates and those that are sold under market-based rates to prevent unfair market advantages through subsidization.[82] Further, EEI Start Printed Page 40425states that if an energy storage device is providing a transmission service then it should be accounted for based on its primary use when it was initially placed in service.[83] California PUC makes a similar argument indicating that the energy storage device should be accounted for based on its intended use within a project.

    64. EEI and other commenters also argue that energy storage technologies are in an early stage of the technology and that the Commission should wait before implementing new accounting or reporting requirements for energy storage assets. California PUC asserts that due to the complexity of the technologies and their multiple potential uses, to avoid disruption of the existing functional classification system the Commission should use a case-by-case exception approach to determine the appropriate classification.[84]

    1. Proposed Accounting Requirements

    65. While the Commission's accounting and reporting requirements associated with the USofA do not dictate the ratemaking decisions of this Commission or State Commissions, these accounting and reporting requirements nevertheless support the rate oversight needs of both this Commission and State Commissions. Accordingly, the Commission strives to ensure that its accounting and reporting requirements keep pace with the evolution of the electric industry. As the industry has evolved, the Commission has relied on its accounting and reporting requirements applicable to existing public utilities [85] (i.e., principally investor-owned utilities) to obtain information about an entity's financial condition and results of operations. This information is important in developing and monitoring rates, making policy decisions, compliance and enforcement initiatives, and informing the Commission and the public about the activities of entities that are subject to these accounting and reporting requirements.[86]

    66. The Commission has required public utilities to continue to prepare their financial statements in accordance with the accounting requirements of the USofA, as it can accommodate most transactions and events affecting these entities. Under the Commission's accounting and reporting requirements, public utilities must record and classify electric plant assets in the prescribed primary plant accounts based on the purpose served or use of the asset to produce, transmit, or distribute electric energy. In addition, public utilities must also record and classify O&M expenses related to such plant assets based on the specific activity the efforts support. The electric plant assets and related O&M expenses must be reported in annual and quarterly Form Nos. 1, 1-F, and 3-Q reports that are maintained in accordance with the accounting requirements of the USofA.

    67. As stated in the NOI, the roles of traditional production, transmission, and distribution assets are generally well understood and each has established method(s) of accounting and reporting; however, the same is not necessarily true of energy storage assets which can operate in ways that resemble production, transmission, and/or distribution.[87] Moreover, it may be possible for some energy storage assets to provide some combination of production, transmission, and distribution services simultaneously. Accordingly, public utilities using energy storage assets may seek multiple methods of cost recovery for their investments in, and use of, the assets to provide various utility services.[88] Consequently, due to the potential to use certain energy storage technologies to provide multiple services and the possibility that a public utility could simultaneously recover costs under both cost-based and market-based rates, the Commission sought comment in the NOI on whether current accounting and reporting requirements for activities and costs for the operation of energy storage resources provide sufficient transparency.

    68. After analyzing all comments received and considering the Commission's informational needs, the Commission has determined that the current accounting and reporting requirements do not provide sufficiently transparent information on the activities and costs of new energy storage operations. Consequently, the Commission proposes to amend the USofA and Form Nos. 1, 1-F, and 3-Q to provide financial and operational information on energy storage assets.

    69. The Commission proposes to add new electric plant and O&M expense accounts to record the installed cost and operating and maintenance cost of energy storage assets and a new account to record the cost of power purchased for use in energy storage operations. In addition, the Commission proposes to amend the Form Nos. 1, and 1-F to include the new accounts and amended schedules to report statistical and operational information on energy storage operations. Further, the Commission proposes to amend a schedule of the Form No. 3-Q to include the proposed new account to record the cost of power purchased for use in energy storage operations. The Commission seeks comment on these proposed amendments, including whether the proposed changes will provide sufficiently transparent information on the activities and costs of new energy storage operations.

    70. Numerous commenters responding to the NOI indicate that the Commission's current accounting and reporting requirements for new energy storage assets are not sufficiently transparent. Many of these commenters suggest that the Commission address this matter by either creating new plant and O&M expense accounts to specifically account for energy storage assets and operations in the existing functional classifications of production, transmission, and distribution, or creating a new separate functional classification for energy storage operations and new associated energy storage plant and O&M expense accounts. While both options would satisfy the Commission's and the public's need for detailed and transparent financial and operation information on public utilities' use of energy storage resources to provide jurisdictional services, the latter option is unnecessary because the existing functional classifications can adequately support energy storage operations. Furthermore, creating a new functional classification does not provide additional benefits compared to creating new accounts within existing classifications. Our proposed amendments to the Form Nos. 1 and 1-F would require utilities with energy storage operations to report detailed financial and operation information on energy storage assets and activities in new schedules for all functions.[89] Thus, using existing functional classifications provides the same level of transparency as would creating a new functional class.

    71. Moreover, the Commission understands that the energy storage industry continues to evolve, and as some commenters observe, the use of energy storage resources in large-scale Start Printed Page 40426public utility operations is at an early stage of development. However, commenters recommending that the Commission wait until the industry is more mature before imposing any accounting and reporting requirements for energy storage assets and operations disregard the current need for certainty in the accounting and reporting treatment for energy storage resources and operations. Uniform, transparent and consistent reporting of information on energy storage operations by public utilities is essential, especially by those seeking to recover costs of energy storage services in cost-based rates. This need for information is heightened by the chance that public utilities could seek to simultaneously recover service costs under cost-based and market-based rate mechanisms using a single energy storage asset.[90]

    72. Transparency improvements achieved through revisions to the existing accounting and reporting requirements will enhance the Commission's and other form users' ability to make a meaningful assessment of a utility's cost of service and rates. Further, this will enable the Commission and others to better monitor for cross-subsidization. The overarching purpose of these proposed accounting and reporting amendments is to provide useful financial and operational information to regulatory agencies and other users of public utilities' financial statements by establishing uniform accounting and reporting requirements for energy storage assets and operations.

    73. The Commission endeavors to achieve a balance between the benefits of revising its accounting and reporting regulations and the imposition of any additional burden on utilities. Information that would be reported for energy storage assets and operations differs little from other data public utilities maintain under the USofA. If a utility owns and operates these energy storage assets, reporting information on them in the proposed accounts and FERC form schedules should not be burdensome. Requiring utilities to classify and account for energy storage assets and operations under existing functional classifications rather than a new one addresses the Commission's and the public's need for detailed and transparent information and lessens the implementation burden on public utilities and licensees subject to Commission accounting and reporting requirements.

    74. SolarReserve argues that the accounting and reporting requirements should not be amended because many sales of ancillary services would be made under the sellers' market-based rate authority. This argument is unconvincing. While public utilities using energy storage resources that are granted market-based rate authority by the Commission may seek waivers of the accounting and reporting requirements at issue here, there are instances when public utilities may not seek or fail to be granted waiver of the requirements. Additionally, previously granted waivers may be rescinded where a seller is found to have market power (or where the seller accepts a presumption of market power) and the seller proposes cost-based rate mitigation or the Commission imposes cost-based rate mitigation. Also, public utilities seeking to only recover storage costs under cost-based rates will be subject to these accounting and reporting requirements.

    75. Furthermore, in instances where public utilities seek to simultaneously recover costs under cost-based and market-based rates, the Commission proposes that the entities be required to account for and report their operations in accordance with the Commission's accounting and reporting requirements to facilitate development and monitoring of the cost-based portion of the rates. In addition, we propose that public utilities currently providing jurisdictional services and recovering costs of the services under market-based rates that have been granted waiver of the accounting and reporting requirements that seek recovery of a portion of service costs under cost-based rates, be required to forego the previously issued waiver and account for and report all cost and operational information to the Commission in accordance with its accounting and reporting requirements. In this instance, public utilities would be required to account for and report costs sought to be recovered on a cost-based and market-based basis. We seek comment on these proposals. Also, we seek comment on whether there should be a percentage of cost recovery threshold [91] or other determining factor that triggers the accounting and reporting obligations in this situation, or should any instance of multiple cost recovery, regardless of the percentage of a utility's total costs, trigger the accounting and reporting obligations. If a percentage threshold should apply, we seek comment with supporting rationale on what would be an appropriate threshold percentage.

    76. Except as discussed above, the proposed amendments to the accounting and reporting regulations are not intended to affect the Commission's policy on market-based rate authority as provided in Order No. 697 or its historical practice of granting waiver of the accounting and reporting regulations of 18 CFR parts 41, 101, and 141 to certain entities with market-based rate authority. In Order No. 697, the Commission concluded that the costs of complying with the USofA requirements and, specifically Parts 41, 101, and 141 of the Commission's regulations, outweigh any incremental benefits of such compliance where the seller only transacts at market-based rates.[92] These proposed accounting and reporting rules do not change that conclusion. However, the Commission notes that entities authorized to make market-based rate sales, irrespective of accounting or other waivers, must file electric quarterly transaction reports regarding their transactions pursuant to Order No. 2001.[93]

    77. At this time, the proposed accounting and reporting rules do not impose additional accounting or reporting requirements for hydroelectric pumped storage plant. The existing accounting and reporting standards use subaccounts for pumped storage under the functional classification of production, which is the only Commission-approved jurisdictional use of pumped storage to date. While the Commission has no basis to believe it is impossible to use large-scale pumped storage technologies to perform transmission or distribution functions as well, to date, no pumped storage developer has successfully demonstrated such a non-“production” use to the Commission. This stands in contrast to the track record for smaller-scale energy storage technologies, where one battery developer has successfully Start Printed Page 40427supported a non-production, transmission use for its project.[94] The Commission remains open to future additions of pumped storage subaccounts to the transmission and distribution functions if appropriate, but at this time the Commission believes that the assets and operations of this pumped storage equipment are sufficiently accounted for by the existing FERC accounts and schedules of the Form Nos. 1, 1-F and 3-Q.[95]

    a. Electric Plant Accounts

    78. The existing primary plant accounts do not explicitly provide for recording the original cost of energy storage assets. This can lead to inconsistent accounting and reporting for these assets by utilities subject to the accounting and reporting requirements, making it difficult for the Commission and others to determine costs related to energy storage assets for cost-of-service rate purposes. In addition, the lack of transparency affects interested parties' and including the Commission's ability to monitor these companies operations to prevent and discourage cross-subsidization between cost-based and market-based activities.

    79. To provide more transparency for the costs of energy storage assets, as well as to address the possibility of inconsistent accounting and reporting, we propose creating a new electric plant account and amending two existing electric plant accounts to record the installed cost of energy storage equipment owned by public utilities and licensees. Specifically, we propose a new account within the production functional classification and amending existing accounts within the transmission and distribution functional classifications.

    80. The proposed plant account would be Account 348, Energy Storage Equipment—Production, and the accounts we propose to amend are existing Account 351, [Reserved], and Account 363, Storage Battery Equipment. Account 351 is a reserve account and is not currently being used. The Commission proposes to rename Account 351 as Energy Storage Equipment—Transmission. The current instructions of Account 363 provides for the inclusion of the cost of storage battery equipment used for the purpose of supplying electricity to meet emergency or peak demands. The Commission proposes to amend the instructions of Account 363 to expand the type of energy storage assets that can be recorded in the account and to recognize the unique operating characteristics of energy storage assets, which may provide services other than only supplying electricity.[96] In addition, we also propose to rename Account 363 as Energy Storage Equipment—Distribution.

    81. The Commission proposes that the instructions to the accounts provide for recording the cost of installed energy storage assets based on the function or purpose the equipment serves. Further, we propose that in instances where an energy storage asset is used to perform more than one function or purpose, the cost of the asset shall be allocated among production, transmission, and distribution plant based on the services provided by the asset and the allocation of the asset's cost through cost based rates approved by a relevant regulatory agency, federal or state. For example, if a relevant State Commission under its own retail rate-setting authority approves the recovery of 25 percent of the cost installed of the storage device through the distribution component of retail rates, then we would expect 25 percent of the cost installed of the asset to be allocated to distribution plant for accounting and reporting purposes and we would expect distribution-related O&M and other accounting and reporting entries to likewise match relevant decisions made in the State Commission rate proceeding. If other portions of the cost installed are also approved for inclusion in cost-based rates at either a state or federal level, then the relevant decisions in those state or federal proceedings would apply to accounting and reporting entries as well. The Commission seeks comments on these aspects of our proposal.

    82. Additionally, the Commission proposes that the original cost of an energy storage asset and other amounts associated with the original cost of the asset (e.g., accumulated depreciation expenses and accumulated deferred income taxes) initially allocated to specific FERC accounts and later reallocated to other FERC accounts based on services provided by the asset and cost recovery be accounted for in accordance with Electric Plant Instruction No. 12, Transfers of Property.[97] Accordingly, we propose that if the costs of an energy storage asset are included in the development of cost-based rates, then the same allocation of costs the primary rate-setting body used for rate development will also be used to allocate the original cost of the energy storage asset among the various functions for accounting and reporting purposes. The Commission seeks comment on these proposals, including the accounting for the transfer of costs associated with an energy storage asset from one functional classification to another. Finally, we propose that the cost of energy storage assets be charged to depreciation expense using the depreciation rates developed for each function.

    83. Since some energy storage equipment may perform multiple functions on the grid, we propose that public utilities be required to maintain records identifying the types of functions each individual energy storage asset supports and performs.

    84. Additionally, the Commission proposes that costs to install energy storage equipment, along with power purchased or internally generated to energize the equipment to prepare it for service, be capitalized as a component cost of the equipment on the first installation only. This includes costs associated with power purchased and internally generated to test the equipment in preparation for utility service prior to it becoming ready for or placed in service.[98] Further, we propose that earnings resulting from revenue received or earned for energy storage operations during test runs be credited to the cost of construction of the project.[99]

    85. Certain energy storage assets are capable of being moved from one location to another. These mobile assets are suitable for a wide range of applications, including emergency power and reliability, among other uses. Labor, materials and other costs are associated with moving these energy storage assets from one location to another location, resetting and preparing them to provide service, and purchasing or self-generating power to reenergize the assets. We propose that any costs incurred to remove, relocate, reset or reenergize an energy storage asset after it was first placed into utility service would not be chargeable to the energy storage equipment accounts as a cost component of the energy storage asset. Instead, the Commission proposes that such costs be accounted for as a Start Printed Page 40428production, transmission, or distribution expense based on the services provided by the energy storage asset and recovery of the asset's cost through rates, in the accounts that follow.[100]

    86. The Commission proposes requiring that expenses other than power expenses for removing, relocating or resetting energy storage plant serving a production function be charged to Account 548.1, Operation of Energy Storage Equipment, and Account 553.1, Maintenance of Energy Storage Equipment. We propose requiring that expenses other than power expenses for removing, relocating or resetting energy storage plant serving a transmission function be charged to Account 562.1, Operation of Energy Storage Equipment, and Account, 570.1, Maintenance of Energy Storage Equipment. Also, we propose requiring that expenses other than power expenses for removing, relocating or resetting energy storage plant serving a distribution function be charged to Account 582.1, Operation of Energy Storage Equipment, and Account 592.2, Maintenance of Energy Storage Equipment.

    87. Finally, the Commission proposes that costs incurred to purchase or internally generate power to reenergize an energy storage asset after it was first put into service be charged as a current operating cost in the appropriate expense accounts for recording such costs, including the proposed purchased power account discussed below. The Commission seeks comment on its proposals regarding electric plant accounts and whether the proposed changes adequately provide for recording the cost of new energy storage technologies and the development of cost of service rates.

    b. Power Purchased and Fuel Supply Expense Accounts

    88. To provide some electrical services, energy storage devices may need to maintain a particular state of charge, or as in the case of compressed air facilities, may need to maintain some minimum pressure. To maintain the desired state of charge or pressure some companies may be required to purchase power in retail or wholesale markets to energize their energy storage devices and other companies may internally generate power. In the NOI, the Commission asked about the accounting for the cost of power, fuel and other direct costs incurred in energy storage operations. Specifically, the Commission asked about accounting for the cost of (1) power purchased and stored for resale; (2) power purchased that will not be resold but instead consumed in operations during the provisioning of services; (3) power purchased to sustain a state of charge; (4) power purchased to initially attain a state of charge; and (5) fuel or other direct costs incurred to internally generate power.[101]

    89. California Storage Alliance and ESA recommend that a new expense account entitled “Power Purchased for Storage Operations” be created to account for items 1-3 above. They indicate that the account could also be used to account for item 4 if the costs are expensed as incurred; otherwise, they recommend that the costs be capitalized in the total cost of the storage resource.[102] California Storage Alliance states that a benefit of having a separate account for power purchased for energy storage operations is that energy storage operating costs, which are organized on a plant level, can be distinguished from traditional utility power purchases and exchanges of electricity, which are organized on a company level.

    90. As stated above, the Commission proposes that item 4 and 5 costs of power purchased or internally generated to initially attain a state of charge in preparation for service prior to the equipment being ready for or placed in service be capitalized as a component cost of the equipment. Additionally, we propose that item 5 costs incurred later be expensed as incurred and accounted for as an expense of the accounting period. Regarding items 1-3, the Commission agrees with California Storage Alliance that there is a benefit to having the cost of power purchased for energy storage operations reported separate from other power purchases. This accounting is expected to enhance the transparency of reported cost, which is consistent with the goals of this proposed rulemaking. However, we do not agree with California Storage Alliance's recommendation that power purchased for energy storage operations be accounted for and reported at the individual plant level.

    91. California Storage Alliance did not discuss this idea in any detail. It is not clear that information is needed to be reported at the individual plant level for rate development, transparency, or any other purposes. Consequently, rather than proposing that power purchased for energy storage operations be accounted for at the individual plant level, the Commission proposes that the cost of power purchased for energy storage operations be accounted for at the company level in new Account 555.1, Power Purchased for Storage Operations. In that case, companies with multiple energy storage plant assets will record the costs of all power purchased for energy storage operations in one account similar to the procedures used to account for power purchased for other purposes that are currently recorded in Account 555, Purchased Power. However, we also propose that companies maintain records of costs associated with operation of a particular energy storage asset as required by 18 CFR part 125.

    92. Further, the Commission proposes that the instructions to Account 555.1 shall be the same as those of Account 555 with an additional instruction requiring the cost of power purchased and consumed or lost in energy storage operations during the provisioning of services be recorded in the new account.[103]

    93. In regards to item 5 above, California Storage Alliance and ESA recommend that the cost of fuel incurred to internally generate power for use in energy storage operations be recorded in a new account entitled “Storage Fuel” and other direct costs incurred in such operations be recorded in new accounts entitled “Operation of Electric Storage Equipment” and “Maintenance of Electric Storage Equipment.” [104] California Storage Alliance and ESA do not explain the benefit of recording the cost of fuel for this purpose in a new account. While this accounting may enhance transparency to some extent, existing fuel accounts can adequately support recording the costs of fuel used in energy storage operations.

    94. Generating companies currently account for fuel costs in FERC accounts by the method of production (i.e., steam, nuclear, hydraulic, or other). Recording fuel cost to a new storage fuel account would require these companies to calculate the amount of their total fuel costs to be allocated to energy storage operations. This data may best be reported in a new or existing schedule of the Form Nos. 1 and 1-F rather than in a new storage fuel account. California Storage Alliance and ESA's Start Printed Page 40429recommended O&M expense accounts are discussed in the next section.

    c. Operation and Maintenance Expense Accounts

    95. As previously indicated there are O&M expenses related to the use of these energy storage assets to provide utility services and there are no existing O&M expense accounts in the USofA specifically dedicated to accounting for the cost of energy storage operations. EEI comments that, as it relates to the transmission function, the current O&M expense accounts would adequately provide for recording expenses associated with operation and maintenance of energy storage assets.[105] The Commission agrees that there are some existing O&M expense accounts that can adequately support energy storage-related operation and maintenance activities. We also believe current O&M expense accounts for the production and distribution functions can provide for recording some energy storage-related expenses. However, the operations and maintenance of certain energy storage assets may differ from conventional assets.[106] Further, some existing O&M expense accounts may not be well suited to record the cost of certain activities associated with energy storage operations.[107] To the extent that there are activities and associated costs of energy storage operations that are not specifically provided for in the existing O&M expense accounts, there is a need for accounts to report the costs.

    96. California Storage Alliance and ESA recommended that all energy storage-related O&M expense costs be recorded in new accounts entitled “Operation of Electric Storage Equipment” and “Maintenance of Electric Storage Equipment.” However, aggregating all of the O&M costs for energy storage into two accounts reduces the transparency of the amounts reported, which is contrary to the purpose of the rulemaking. Further, because certain costs of energy storage operations can be adequately accounted for in the existing O&M expense accounts the costs should be reported there in accordance with the instructions of the accounts. Consequently, the Commission proposes that companies record energy storage-related O&M expenses in the existing O&M expense accounts according to the nature of the expense to the extent that the account adequately supports recording of the cost.

    97. For energy storage-related O&M expenses that are not specifically provided for in the existing O&M expense accounts the Commission proposes that such costs be recorded in Account 548.1, Operation of Energy Storage Equipment, and Account 553.1, Maintenance of Energy Storage Equipment, for energy storage plant classified as production; Account 562.1, Operation of Energy Storage Equipment, and Account 570.1, Maintenance of Energy Storage Equipment, for energy storage plant classified as transmission; and Account 582.1, Operation of Energy Storage Equipment, and Account 592.2, Maintenance of Energy Storage Equipment, for energy storage plant classified as distribution.

    98. The Commission proposes that the instructions of the accounts provide for the inclusion of the cost of labor, materials used and expenses incurred in the operation and maintenance, as appropriate, of energy storage equipment, to the extent that the costs are not appropriately recorded in other O&M expense accounts. Furthermore, we propose that Accounts 592, Maintenance of Station Equipment (Major only), and 592.1, Maintenance of Structures and Equipment (Nonmajor only), be revised such that the accounts do not include O&M expenses related to energy storage operations. Additionally, we propose that the instructions of these accounts be revised to remove the reference to Account 363. The Commission seeks comment on its proposal, including whether the operations of certain energy storage assets differ enough from conventional assets or maintenance activities to require the proposed revisions.

    d. No New Revenue Accounts

    99. In the NOI, the Commission asked whether new revenue accounts should be created or existing revenue accounts used to account for revenue associated with energy storage operations. The Commission also asked whether all revenues for energy storage operations should be recorded in a single revenue account: Account 456, Other Electric Revenues. Most commenters oppose recording all revenues associated with energy storage operations in a single account because it would not provide sufficient transparency as to the relation of the revenue to a particular service provided. Some commenters argue that new revenue accounts were needed to account for revenues generated using energy storage assets.[108] These commenters generally argue that the existing revenue accounts do not provide sufficient transparency. However, commenters opposed to creating new revenue accounts argue that production, transmission, and distribution services currently have adequate revenue accounts, and energy storage technologies will simply comprise a component of those services. These commenters contend that revenue derived from the use of energy storage assets will originate from the same type of activities associated with revenue derived from the use of traditional utility assets.[109] They argue that the type of resource used to provide the service does not change the accounting for the associated revenue.

    100. The Commission agrees with commenters who contend that the existing revenue accounts sufficiently provide for accounting for revenue associated with using energy storage assets. We also agree that revenues associated with the use of energy storage assets will originate from the same type of activities associated with revenue derived from the use of traditional utility assets. The current revenue accounts provide for recording revenue based on sales of electricity and other products and services by type of customer, product, or service. Revenue derived from the operation of energy storage assets will originate from one or more of these items. Commenters recommending new accounts have not identified new revenue streams that may require different accounting. As such, the Commission does not propose new revenue accounts for energy storage. Companies using energy storage assets to provide utility service must record revenues associated with use of the assets in existing revenue accounts in accordance with the instructions of the accounts, as appropriate.Start Printed Page 40430

    2. Proposed New and Amended Form Nos. 1, 1-F, and 3-Q Schedules

    101. The Form Nos. 1, 1-F, and 3-Q have schedules that include a basic set of financial statements: Comparative Balance Sheet, Statement of Income and Retained Earnings, Statement of Cash Flows, and the Statement of Comprehensive Income and Hedging Activities. Supporting schedules with supplementary information are filed, including revenues and the related quantities of products sold or transported; account balances for O&M expenses; selected plant cost and operational data; and other information. The Form No. 1 provides schedule pages 408-409, Pumped Storage Generating Plant Statistics (Large Plants), and pages 410-411, Generating Plant Statistics (Small Plants) to report, among other items, operational information on pumped storage plants. These are the only schedules that provide for reporting information on energy storage and these schedules do not provide for reporting information on new types of energy storage assets such as batteries and flywheels, or allow any possibility of treating pumped storage plants as anything other than generating assets.

    102. Several commenters responded to the NOI's inquiry about whether the Form Nos. 1 and 1-F should be amended to capture data on energy storage assets and operations. Commenters recommend that certain existing schedules be revised to include energy storage assets and a new schedule be created to report operational and statistical data on the assets.[110] The primary difference among the recommendations is the amount of detail proposed for inclusion in the new schedule.

    103. Some commenters recommend that the schedule include all input items that are included in the total amount of O&M expenses for an energy storage asset, similar to how O&M expenses and plant information are currently required to be reported in schedule pages 408-409 of the Form No. 1.[111] In contrast, other commenters propose that the information be presented at a higher, aggregated, level with only total operation and total maintenance expense for energy storage operations reported in the schedule. The Form No. 1 provides schedule pages 408-409 for reporting detailed plant and O&M expense information on generating plants that are considered “large” and less detailed plant and cost information on generating plants that are considered “small” in schedule pages 410-411, Generating Plant Statistics (Small Plants). According to the instructions of these schedules, the specific schedule a utility must use to report its plant statistics and certain associated costs is determined by the installed capacity of the unit. Generating units with 10,000 kilowatts or more of installed capacity will generally report this information in schedule pages 408-409.[112] While this kilowatt threshold may be an appropriate measure of information reporting requirements for traditional generating plants, it may not be appropriate for new energy storage assets that in many instances will be rated below 10,000 kilowatts. Consequently, the Commission seeks comment on what would be an appropriate kilowatt threshold for requiring utilities to report more detailed plant and cost information for energy storage plant.

    104. The Commission proposes to add two new schedules to the Form Nos. 1 and 1-F to report statistical and cost data on energy storage plant. One schedule will require more detailed information than the other to lessen the reporting burden on companies with small energy storage operations. We preliminarily propose that 10,000 kilowatts be the threshold for determining whether a filer reports more detailed information in proposed schedule pages 414-417, Energy Storage Operations (Large Plants), or less detailed information in proposed schedule pages 419-421, Energy Storage Operations (Small Plants). We propose that the following information be reported on pages 414-417 in the proposed schedule: (1) Megawatts (MW) purchased, MW delivered to the grid to support production, transmission, or distribution operations, MW lost during conversion and discharge of energy, and MW sold; (2) Account No. 555.1, Power Purchased for Storage Operations; (3) cost of fuel used in energy storage operations; (4) revenue from the sale of stored energy by revenue account; (5) other energy storage-related cost incurred; (6) cost of energy storage plant recorded in Accounts 101, 103, 106, and 107 by actual or expected functional classification; (7) operation and maintenance expenses associated with each function; and (8) name and location of energy storage plant, by project, and functional classification.

    105. Additionally, we propose that the following information be reported on pages 419-421 in the proposed schedule: (1) Cost of plant; (2) operation expenses excluding fuel; (3) maintenance expenses; (4) cost of fuel used in energy storage operations; (5) Account No. 555.1, Power Purchased for Storage Operations; (6) other energy storage-related cost incurred; and (7) name and location of energy storage plant, by project, and functional classification.

    106. Finally, we propose to amend several schedules of the Form Nos. 1 and 1-F to include the proposed energy storage plant, purchased power and O&M expense accounts discussed above, and schedule page 397, Amounts Included in ISO/RTO Settlement Statements, of the Form No. 3-Q to include the proposed purchased power account.[113] The Commission seeks public comment on each of the proposals discussed above, including whether the proposed changes will provide sufficiently transparent information on the activities and costs of new energy storage assets and operations.

    III. Information Collection Statement

    107. The collections of information below for this proposed rule have been submitted to the Office of Management and Budget (OMB) for review under Section 3507(d) of the Paperwork Reduction Act of 1995.[114] OMB's regulations require approval of certain information collection requirements imposed by agency rule.[115] The Commission solicits comments on its need for this information, whether the information will have practical utility, the accuracy of burden and cost estimates, ways to enhance the quality, utility, and clarity of the information to be collected or retained, and any suggested methods for minimizing respondents' burden, including the use of automated information techniques.

    Burden Estimate and Information Collection Costs: The additional estimated annual public reporting burdens and costs for the requirements in this proposed rule are as follows.

    Start Printed Page 40431
    Data collectionNumber of respondents (a)Change in the number of hours per filing (b)Filings per respondent per year (c)Change in the total annual hours for this collection (a × b × c=d)Estimated annual cost (at $120/hr.) (d × $120/hr.) ($)
    Form No. 1210611,260151,200
    Form No. 1-F561303,600
    Form No. 3-Q213116 1363976,680
    FERC-917 [includes 18 CFR 35.28 pro forma open-access transmission tariff (OATT)]132101440 averaged over Years 1-3 [1320 in Year 1]117 52,800
    FERC-717 [includes OASIS & posting data on self-supply ancillary services]1762135242,240
    FERC-919 [includes `20 percent screen']155711,085130,200
    Total3,806 (averaged over Years 1-3)456,720

    Titles: FERC Form No. 1, “Annual Report of Major Electric Utilities, Licensees, and Others;” FERC Form No. 1-F, “Annual Report for Nonmajor Public Utilities and Licensees;” FERC Form No. 3-Q, “Quarterly Financial Report of Electric Utilities, Licensees and Natural Gas Companies;” FERC-917, “Non-discriminatory Open Access Transmission Tariff,” FERC-717, “Standards for Business Practices and Communication Protocols for Public Utilities,” and FERC-919, “Electric Rate Schedule Filings: Market Based Rates for Wholesale Sales of Electric Energy, Capacity and Ancillary Services by Public Utilities.”

    Action: Proposed revisions to information collections.

    OMB Control Nos.: 1902-0021 (FERC Form No. 1); 1902-0029 (FERC Form No. 1-F); 1902-0205 (FERC Form No. 3-Q); 1902-0233 (FERC-917), 1902-0173 (FERC-717); and 1902-0234 (FERC-919).

    Respondents: Public utilities, FERC licensees, and public utility transmission providers.

    Frequency of responses: Annually (FERC Form Nos. 1 and 1-F); quarterly (FERC Form No. 3-Q); and as needed (FERC-917, FERC-717, and FERC-919).

    Necessity of the Information: The proposed rule would amend the Commission's regulations to reflect changes occurring in the electric industry due to the availability of new energy storage technologies that can be used in the provision of large-scale utility operations. The addition of these plant accounts, and new and amended reporting forms, should enhance transparency and provide detailed information on transactions and events affecting public utilities and licensees that file reports with the Commission. Without specific instructions and accounts for recording and reporting the above transactions and events, inconsistent and incomplete accounting and reporting will likely result. With regard to FERC-917, FERC-919, and FERC-717 the proposed rule would provide increased transparency in the determination of Regulation and Frequency Response requirements, historical ancillary service information, and ancillary service capacity in order to ensure that rates for that service remain just, reasonable, and not unduly discriminatory.

    Internal Review: The Commission has reviewed the requirements pertaining to the USofA and the reports it prescribes and determined that the proposed amendments are necessary because the Commission needs to establish uniform accounting and reporting requirements for the costs of utility assets and expenses incurred for providing services as part of a utility's operations. The Commission has reviewed the requirements associated with the OATT, OASIS, and market power analysis and determined they are necessary to increase transparency and ensure that rates remain just, reasonable, and not unduly discriminatory.

    108. These requirements conform to the Commission's need for efficient information collection, communication, and management within the energy industry. The Commission has assured itself, through internal review, that there is specific, objective support for the burden estimates associated with the information collection requirements.

    109. Interested persons may obtain information on the reporting requirements by contacting the following: Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426 [Attention: Ellen Brown, Office of the Executive Director], email: DataClearance@ferc.gov, Phone (202) 502-8663, fax: (202) 273-0873.

    Comments on the collections of information and associated burden estimates in the proposed rule should be sent to the Commission in this docket and may also be sent to the Office of Information and Regulatory Affairs, Office of Management and Budget, Washington, DC 20503 [Attention: Desk Officer for the Federal Energy Regulatory Commission]. For security reasons, comments to OMB should be submitted by email to: oira_submission@omb.eop.gov. Please refer to OMB Control Nos. 1902-0021 (FERC Form No. 1); 1902-0029 (FERC Form No. 1-F); 1902-0205 (FERC Form No. 3-Q); 1902-0233 (FERC-917), 1902-0173 (FERC-717); and 1902-0234 (FERC-919) and Docket Number RM11-24.

    IV. Environmental Analysis

    110. The Commission is required to prepare an Environmental Assessment or an Environmental Impact Statement for any action that may have a significant adverse effect on the human environment.[118] The Commission concludes that neither an Environmental Assessment nor an Environmental Impact Statement is required for this Final Rule under section 380.4(a)(15) of the Commission's regulations, which provides a categorical exemption for approval of actions under sections 205 and 206 of the FPA relating to the filing of schedules containing all rates and charges for the transmission or sale subject to the Commission's jurisdiction, plus the classification, practices, contracts, and regulations that affect rates, charges, classifications, and services.[119]

    Start Printed Page 40432

    V. Regulatory Flexibility Act

    111. The Regulatory Flexibility Act of 1980 (RFA) [120] generally requires a description and analysis of proposed rules that will have significant economic impact on a substantial number of small entities. The RFA mandates consideration of regulatory alternatives that accomplish the stated objectives of a proposed rule and that minimize any significant economic impact on a substantial number of small entities. The Small Business Administration's (SBA's) Office of Size Standards develops the numerical definition of a small business.[121] The SBA has established a size standard for electric utilities, stating that a firm is small if, including its affiliates, it is primarily engaged in the transmission, generation and/or distribution of electric energy for sale and its total electric output for the preceding twelve months did not exceed four million megawatt hours.[122] Most companies regulated by the Commission do not fall within the RFA's definition of a small entity.[123] The proposed rule applies exclusively to public utilities that own, control, or operate facilities for transmitting electric energy in interstate commerce and not electric utilities per se. Based on the filers of the annual FERC Form No. 1 and Form No. 1-F, as well as the number of companies that have obtained waivers, we estimate that 6.8 percent of the filers affected by this proposed rule are “small.” The Commission believes this rule will not have a significant economic impact on a substantial number of small entities, and therefore no regulatory flexibility analysis is required.

    VI. Comment Procedures

    112. The Commission invites interested persons to submit comments on the matters and issues proposed in this notice to be adopted, including any related matters or alternative proposals that commenters may wish to discuss. Comments are due 60 days after publication in the Federal Register. Comments must refer to Docket No. RM11-24-000, and must include the commenter's name, the organization they represent, if applicable, and their address in their comments.

    113. The Commission encourages comments to be filed electronically via the eFiling link on the Commission's Web site at http://www.ferc.gov. The Commission accepts most standard word processing formats. Documents created electronically using word processing software should be filed in native applications or print-to-PDF format and not in a scanned format. Commenters filing electronically do not need to make a paper filing.

    114. Commenters that are not able to file comments electronically must send an original of their comments to: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE., Washington, DC 20426.

    115. All comments will be placed in the Commission's public files and may be viewed, printed, or downloaded remotely as described in the Document Availability section below. Commenters on this proposal are not required to serve copies of their comments on other commenters.

    VII. Document Availability

    116. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the Internet through the Commission's Home Page (http://www.ferc.gov) and in the Commission's Public Reference Room during normal business hours (8:30 a.m. to 5:00 p.m. Eastern time) at 888 First Street NE., Room 2A, Washington DC 20426.

    117. From the Commission's Home Page on the Internet, this information is available on eLibrary. The full text of this document is available on eLibrary in PDF and Microsoft Word format for viewing, printing, and/or downloading. To access this document in eLibrary, type the docket number excluding the last three digits of this document in the docket number field.

    118. User assistance is available for eLibrary and the Commission's Web site during normal business hours from the Commission's Online Support at 202-502-6652 (toll free at 1-866-208-3676) or email at ferconlinesupport@ferc.gov, or the Public Reference Room at (202) 502-8371, TTY (202) 502-8659. Email the Public Reference Room at public.referenceroom@ferc.gov.

    Start List of Subjects

    List of Subjects in 18 CFR Parts 35, 37, and 101

    • Electric power rates; Electric utilities
    End List of Subjects Start Signature

    By direction of the Commission. Commissioner Clark voting present.

    Nathaniel J. Davis, Sr.,

    Deputy Secretary.

    End Signature

    In consideration of the foregoing, the Commission proposes to amend Parts 35, 37, and 101, Chapter I, Title 18, Code of Federal Regulations, as follows.

    Start Part

    PART 35—FILING OF RATE SCHEDULES AND TARIFFS

    1. The authority citation for Part 35 continues to read as follows:

    Start Authority

    Authority: 16 U.S.C. 791a-825r, 2601-2645; 31 U.S.C. § 9701; 42 U.S.C. 7101-7352.

    End Authority

    2. Amend § 35.28 by adding a new paragraph (c)(1)(viii) as follows.

    Non-discriminatory open access transmission tariff.
    * * * * *

    (c)(1)(viii) Each public utility's open access transmission tariff, at Schedule 3—Regulation and Frequency Response Service, must include provisions explaining how it will determine its Regulation and Frequency Response reserve requirements. These provisions must take into account speed and accuracy of regulation resources and include a description of how the public utility transmission provider would make adjustments to the capacity requirement when a customer opts to purchase from third-parties or self-supply its requirements using resources with speed and accuracy characteristics that differ from the set of resources otherwise being used for Regulation and Frequency Response Service.

    * * * * *

    3. Amend § 35.37 as follows:

    a. Paragraph (c)(1) is revised.

    b. New paragraph (c)(5) is added.

    Market power analysis required.
    * * * * *

    (c)(1) There will be a rebuttable presumption that a Seller lacks horizontal market power with respect to sales of energy, capacity, energy imbalance service, and generation imbalance service if it passes two indicative market power screens: a pivotal supplier analysis based on annual peak demand of the relevant market, and a market share analysis applied on a seasonal basis. There will be a rebuttable presumption that a seller possesses horizontal market power with respect to sales of energy, capacity, energy imbalance service, and generation imbalance service if it fails either screen.

    * * * * *

    (c)(5) There will be a rebuttable presumption that a Seller of Operating Start Printed Page 40433Reserve—Spinning, Operating Reserve—Supplemental, Reactive Supply and Voltage Control, or Regulation and Frequency Response services lacks horizontal market power with respect to sales of the ancillary service in question if the amount of capacity in MWs (or, as applicable, MVARs) that it can dedicate to providing the ancillary service in the relevant geographic market, taking into account any reported historical locational requirements, is no more than 20 percent of the relevant reported aggregate requirement for that ancillary service as reported pursuant to § 37.6(k) of the Commission's Regulations.

    * * * * *

    4. Amend § 35.38 as follows:

    a. Paragraph (a) is revised.

    b. Paragraph (b) is revised.

    c. New paragraph (c) is added.

    Mitigation.

    (a) A Seller that has been found to have market power in generation or ancillary services, or that is presumed to have horizontal market power in generation or ancillary services by virtue of failing or foregoing the relevant market power screens, as described in 35.37(c), may adopt the default mitigation detailed in paragraph (b) of this section for sales of energy or capacity or paragraph (c) of this section for sales of ancillary services or may propose mitigation tailored to its own particular circumstances to eliminate its ability to exercise market power. Mitigation will apply only to the market(s) in which the Seller is found, or presumed, to have market power.

    (b) Default mitigation for sales of energy or capacity consists of three distinct products:

    * * * * *

    (c) Default mitigation for sales of ancillary services consists of: (1) A cost-based cap based on the relevant OATT ancillary service rate of the purchasing public utility transmission operator; (2) a cost-based cap based on the highest relevant public utility OATT ancillary service rate in the proposed trading area; or (3) the results of a competitive solicitation that meets the Commission's requirements for transparency, definition, evaluation, oversight, and adequate seller interest to ensure competitiveness.

    End Part Start Part

    PART 37—OPEN ACCESS SAME-TIME INFORMATION SYSTEMS

    5. The authority citation for Part 37 continues to read as follows:

    Start Authority

    Authority: 16 U.S.C. 791-825r, 2601-2645; 31 U.S.C. 9701; 42 U.S.C. 7101-7352.

    End Authority

    6. Amend § 37.6 by adding a new paragraph (k) as follows.

    Information to be posted on the OASIS.
    * * * * *

    (k) Posting data related to historical ancillary service requirements. The Transmission Provider must post on OASIS information as to the aggregate amount (MW or MVAR, as applicable) of Operating Reserve—Spinning, Operating Reserve—Supplemental, Reactive Supply and Voltage Control, and Regulation and Frequency Response services that it has historically required in order to serve its long-term firm obligations, including any geographic limitations it may face in meeting such ancillary service requirements.

    End Part Start Part

    PART 101—UNIFORM SYSTEM OF ACCOUNTS PRESCRIBED FOR PUBLIC UTILITIES AND LICENSEES SUBJECT TO THE PROVISIONS OF THE FEDERAL POWER ACT

    7. The authority citation for Part 101 continues to read as follows:

    Start Authority

    Authority: 16 U.S.C. 791a-825r, 2601-2645; 31 U.S.C. 9701; 42 U.S.C. 7101-7352, 7651-7651o.

    End Authority

    8. In Part 101, Electric Plant Chart of Accounts, Account 348 is added to the list:

    Electric Plant Chart of Accounts

    * * * * *

    2. PRODUCTION PLANT

    * * * * *

    D. OTHER PRODUCTION

    * * * * *

    348 Energy Storage Equipment—Production

    * * * * *

    9. In Part 101, Electric Plant Accounts, Account 351, the name of the account is amended and instructions are added to read as follows:

    Electric Plant Accounts

    * * * * *

    351 Energy Storage Equipment—Transmission

    A. This account shall include the cost installed of energy storage equipment used to store energy for load managing purposes. Where energy storage equipment can perform more than one function or purpose, the cost of the equipment shall be allocated among production, transmission, and distribution plant based on the services provided by the asset and the allocation of the asset's cost through rates approved by a relevant regulatory agency. Reallocation of the cost of equipment recorded in this account shall be in accordance with Electric Plant Instruction No. 12, Transfers of Property.

    B. Labor costs and power purchase and generation costs incurred to install and energize the equipment are includible on the first installation only. The cost of removing, relocating and resetting energy storage equipment shall not be charged to this account but to Account 562.1, Operation of Energy Storage Equipment, and Account 570.1, Maintenance of Energy Storage Equipment, as appropriate.

    C. The records supporting this account shall show, by months, the function(s) each energy storage asset supports or performs.

    ITEMS

    End Part

    1. Batteries/Chemical

    2. Compressed Air

    3. Flywheels

    4. Superconducting Magnetic Storage

    5. Thermal

    10. In Part 101, Electric Plant Accounts, Account 363, the name of the account and the instructions are amended and added to read as follows:

    Electric Plant Accounts

    * * * * *

    363 Energy Storage Equipment—Distribution

    A. This account shall include the cost installed of energy storage equipment used to store energy for load managing purposes. Where energy storage equipment can perform more than one function or purpose, the cost of the equipment shall be allocated among production, transmission, and distribution plant based on the services provided by the asset and the allocation of the asset's cost through rates approved by a relevant regulatory agency. Reallocation of the cost of equipment recorded in this account shall be in accordance with Electric Plant Instruction No. 12, Transfers of Property.

    B. Labor costs and power purchase and generation costs incurred to install and energize the equipment are includible on the first installation only. The cost of removing, relocating and resetting energy storage equipment shall not be charged to this account but to Account 582.1, Operation of Energy Storage Equipment, and Account 592.2, Maintenance of Energy Storage Equipment, as appropriate.

    C. The records supporting this account shall show, by months, the function(s) each energy storage asset supports or performs.Start Printed Page 40434

    ITEMS

    1. Batteries/Chemical

    2. Compressed Air

    3. Flywheels

    4. Superconducting Magnetic Storage

    5. Thermal

    11. In Part 101, Electric Plant Accounts, new primary plant account 348 is added to read as follows:

    Electric Plant Accounts

    * * * * *

    348 Energy Storage Equipment—Production

    A. This account shall include the cost installed of energy storage equipment used to store energy for load managing purposes. Where energy storage equipment can perform more than one function or purpose, the cost of the equipment shall be allocated among production, transmission, and distribution plant based on the services provided by the asset and the allocation of the asset's cost through rates approved by a relevant regulatory agency. Reallocation of the cost of equipment recorded in this account shall be in accordance with Electric Plant Instruction No. 12, Transfers of Property.

    B. Labor costs and power purchase and generation costs incurred to install and energize the equipment are includible on the first installation only. The cost of removing, relocating and resetting energy storage equipment shall not be charged to this account but to Account 548.1, Operation of Energy Storage Equipment, and Account 553.1, Maintenance of Energy Storage Equipment, as appropriate.

    C. The records supporting this account shall show, by months, the function(s) each energy storage asset supports or performs.

    ITEMS

    1. Batteries/Chemical

    2. Compressed Air

    3. Flywheels

    4. Superconducting Magnetic Storage

    5. Thermal

    Note:

    The cost of pumped storage hydroelectric plant shall be charged to hydraulic production plant. These are examples of items includible in this account. This list is not exhaustive.

    12. In Part 101, Operation and Maintenance Expense Chart of Accounts, Accounts 548.1, 553.1, 555.1, 562.1, 570.1, 582.1, and 592.2 are added to the list:

    Operation and Maintenance Expense Chart of Accounts

    * * * * *

    1. POWER PRODUCTION EXPENSES

    * * * * *

    D. OTHER POWER GENERATION

    * * * * *

    Operation

    * * * * *

    548.1 Operation of Energy Storage Equipment

    * * * * *

    Maintenance

    553.1 Maintenance of Energy Storage Equipment

    * * * * *

    E. OTHER POWER SUPPLY EXPENSES

    * * * * *

    555.1 Power Purchased for Storage Operations

    * * * * *

    2. TRANSMISSION EXPENSES

    * * * * *

    Operation

    * * * * *

    562.1 Operation of Energy Storage Equipment

    * * * * *

    Maintenance

    * * * * *

    570.1 Maintenance of Energy Storage Equipment

    * * * * *

    4. DISTRIBUTION EXPENSES

    * * * * *

    Operation

    * * * * *

    582.1 Operation of Energy Storage Equipment

    * * * * *

    Maintenance

    * * * * *

    592.2 Maintenance of Energy Storage Equipment

    13. In Part 101, Operation and Maintenance Expense Accounts, new operation expense account 548.1 is added to read as follows:

    Operation and Maintenance Expense Accounts

    * * * * *

    548.1 Operation of Energy Storage Equipment

    This account shall include the cost of labor, materials used and expenses incurred in the operation of energy storage equipment includible in Account 348, Energy Storage Equipment-Production, which are not specifically provided for or are readily assignable to other production operation expense accounts.

    14. In Part 101, Operation and Maintenance Expense Accounts, new maintenance expense account 553.1 is added to read as follows:

    Operation and Maintenance Expense Accounts

    * * * * *

    553.1 Maintenance of Energy Storage Equipment

    This account shall include the cost of labor, materials used and expenses incurred in the maintenance of energy storage equipment includible in Account 348, Energy Storage Equipment-Production, which are not specifically provided for or are readily assignable to other production maintenance expense accounts.

    15. In Part 101, Operation and Maintenance Expense Accounts, new power supply expense account 555.1 is added to read as follows:

    Operation and Maintenance Expense Accounts

    * * * * *

    555.1 Power Purchased for Storage Operations

    A. This account shall include the cost at point of receipt by the utility of electricity purchased for use in storage operations, including power purchased and consumed or lost in energy storage operations during the provision of services, including but not limited to energy purchased and stored for resale. It shall also include but not be limited to net settlements for exchange of electricity or power, such as economy energy, off-peak energy for on-peak energy, and spinning reserve capacity. In addition, the account shall include the net settlements for transactions under pooling or interconnection agreements wherein there is a balancing of debits and credits for energy, capacity, and possibly other factors. Distinct purchases and sales shall not be recorded as exchanges and net amounts only recorded merely because debit and credit amounts are combined in the voucher settlement.

    B. The records supporting this account shall show, by months, the kilowatt hours and prices thereof under each purchase contract and the charges and credits under each exchange or power pooling contract.Start Printed Page 40435

    16. In Part 101, Operation and Maintenance Expense Accounts, new operation expense account 562.1 is added to read as follows:

    Operation and Maintenance Expense Accounts

    * * * * *

    562.1 Operation of Energy Storage Equipment

    This account shall include the cost of labor, materials used and expenses incurred in the operation of energy storage equipment includible in Account 351, Energy Storage Equipment-Transmission, which are not specifically provided for or are readily assignable to other transmission operation expense accounts.

    17. In Part 101, Operation and Maintenance Expense Accounts, new maintenance expense account 570.1 is added to read as follows:

    Operation and Maintenance Expense Accounts

    * * * * *

    570.1 Maintenance of Energy Storage Equipment

    This account shall include the cost of labor, materials used and expenses incurred in the maintenance of energy storage equipment includible in Account 351, Energy Storage Equipment-Transmission, which are not specifically provided for or are readily assignable to other transmission maintenance expense accounts.

    18. In Part 101, Operation and Maintenance Expense Accounts, new operation expense account 582.1 is added to read as follows:

    Operation and Maintenance Expense Accounts

    * * * * *

    582.1 Operation of Energy Storage Equipment

    This account shall include the cost of labor, materials used and expenses incurred in the operation of energy storage equipment includible in Account 363, Energy Storage Equipment-Distribution, which are not specifically provided for or are readily assignable to other distribution operation expense accounts.

    19. In Part 101, Operation and Maintenance Expense Accounts, new maintenance expense account 592.2 is added to read as follows:

    Operation and Maintenance Expense Accounts

    * * * * *

    592.2 Maintenance of Energy Storage Equipment

    This account shall include the cost of labor, materials used and expenses incurred in the maintenance of energy storage equipment includible in Account 363, Energy Storage Equipment-Distribution, which are not specifically provided for or are readily assignable to other distribution maintenance expense accounts.

    Note:

    The following appendix will not be published in the Code of Federal Regulations.

    Appendix A: List of Short Names of Commenters on the Federal Energy Regulatory Commission's Notice of Inquiry on Third-Party Provision of Ancillary Services; Accounting and Financial Reporting for New Electric Storage Technologies—Docket No. RM11-24-000, June 2011

    Short Name or AcronymCommenter
    A123A123 Systems, Inc.
    AEPAmerican Electric Power Service Corporation.
    AES Energy StorageAES Energy Storage.
    APPAAmerican Public Power Association.
    Apparent Inc.Apparent Inc.
    Aquion Energy, Inc.Aquion Energy, Inc.
    AWEAAmerican Wind Energy Association.
    Beacon Power CorporationBeacon Power Corporation.
    BonnevilleBonneville Power Administration.
    BrightSourceBrightSource Energy, Inc.
    Business Council for Sustainable EnergyBusiness Council for Sustainable Energy.
    California PUCCalifornia Public Utilities Commission.
    California Storage AllianceCalifornia Energy Storage Alliance.
    CAREBSCoalition to Advance Renewable Energy Through Bulk Storage.
    EEIEdison Electric Institute.
    Electricity ConsumersElectricity Consumers Resource Council.
    ENBALAEnbala Power Networks.
    Environmental Defense FundEnvironmental Defense Fund.
    EPSAElectric Power Supply Association.
    ESAElectricity Storage Association.
    FirstEnergyThe Cleveland Electric Illuminating Company, Jersey Central Power & Light Company, Metropolitan Edison Company, Ohio Edison Company, Pennsylvania Electric Company, Pennsylvania Power Company, The Toledo Edison Company, Monongahela Power Company, The Potomac Edison Company, West Penn Power Company, FirstEnergy Solutions Corp., American Transmission Systems, Incorporated and Trans-Allegheny Interstate Line Company.
    FriiPwrFriiPwr USA.
    Hydro AssociationNational Hydropower Association.
    IIDImperial Irrigation District.
    Mark LivelyMark B. Lively.
    National GridNational Grid USA.
    National Park ServiceNational Park Service.
    NaturEnerNaturEner USA, LLC.
    NextStepNextStep Electric, LLC.
    NGK/TINGK Insulators, Ltd and Technology Insights.
    NGSANatural Gas Supply Association.
    Start Printed Page 40436
    Northwest GroupAvista Corporation, Bonneville Power Administration, Chelan County PUD, Clark Public Utilities, Cowlitz County PUD, Idaho Power Company, NorthWestern Energy, PacifiCorp, Public Power Council, Public Utility District No. 2 of Grant County, and Puget Sound Energy, Inc.
    Portland GeneralPortland General Electric Company.
    PowerexPowerex Corporation.
    PPL CompaniesPPL EnergyPlus, LLC and PPL Montana, LLC.
    Prudent EnergyPrudent Energy Corporation.
    Public Interest OrganizationsCenter for Rural Affairs, Clean Wisconsin, Climate + Energy Project, Conservation Law Foundation, Environment Northeast, Fresh Energy, Land Trust Alliance, Natural Resources Defense Council, Pace Energy and Climate Center, Project for Sustainable FERC Energy Policy, Sierra Club and Union of Concerned Scientists.
    RiverbankRiverbank Power Corporation.
    SaftSaft America, Inc.
    SDG&ESan Diego Gas & Electric Company.
    Shell EnergyShell Energy North America (US), L.P.
    Solar Energy AssociationSolar Energy Industries Association.
    SolarReserveSolarReserve LLC.
    Southern California EdisonSouthern California Edison Company.
    StarwoodStarwood Energy Group Global, LLC.
    SteffesSteffes Corporation.
    TAPSTransmission Access Policy Study Group.
    ViridityViridity Energy Inc.
    WADE/WartsilaWADE USA and Wartsila North America.
    WSPPWSPP, Inc.
    XtremeXtreme Power.

    Note:

    The following Appendix will not be published in the Code of Federal Regulations.

    Appendix B—New and Amended Form 1/1F/3Q Pages

    Start Printed Page 40437

    Start Printed Page 40438

    Start Printed Page 40439

    Start Printed Page 40440

    Start Printed Page 40441

    Start Printed Page 40442

    Start Printed Page 40443

    Start Printed Page 40444

    Start Printed Page 40445

    Start Printed Page 40446

    Start Printed Page 40447

    Start Printed Page 40448

    Start Printed Page 40449

    Start Printed Page 40450

    Start Printed Page 40451

    Start Printed Page 40452

    Start Printed Page 40453

    Start Printed Page 40454

    Start Printed Page 40455

    Start Printed Page 40456

    Start Printed Page 40457

    Start Printed Page 40458

    End Supplemental Information

    Footnotes

    1.  See Avista Corp., 87 FERC ¶ 61,223 (Avista), order on reh'g, 89 FERC ¶ 61,136 (1999).

    Back to Citation

    2.  Third-Party Provision of Ancillary Services; Accounting and Financial Reporting for New Electric Storage Technologies, 135 FERC ¶ 61,240 (2011) (NOI).

    Back to Citation

    3.  Frequency Regulation Compensation in the Organized Wholesale Power Markets, Order No. 755, FERC Stats. & Regs. ¶ 31,324 (2011), reh'g denied, Order No. 755-A, 138 FERC ¶ 61,123 (2012).

    Back to Citation

    4.  See Avista Corp., 87 FERC ¶ 61,223 (Avista), order on reh'g, 89 FERC ¶ 61,136 (1999) (Avista Rehearing Order).

    Back to Citation

    5.  Uniform System of Accounts Prescribed for Public Utilities and Licensees Subject to the Provisions of the Federal Power Act, 18 CFR part 101 (2011).

    Back to Citation

    9.  See, e.g., Promoting Wholesale Competition Through Open Access Non-Discriminatory Transmission Services by Public Utilities; Recovery of Stranded Costs by Public Utilities and Transmitting Utilities, Order No. 888, FERC Stats. & Regs. ¶ 31,036, at 31,781 (1996), order on reh'g, Order No. 888-A, FERC Stats. & Regs. ¶ 31,048, order on reh'g, Order No. 888-B, 81 FERC ¶ 61,248 (1997), order on reh'g, Order No. 888-C, 82 FERC ¶ 61,046 (1998), aff'd in relevant part sub nom. Transmission Access Policy Study Group v. FERC, 225 F.3d 667 (D.C. Cir. 2000), aff'd sub nom. New York v. FERC, 535 U.S. 1 (2002); Market-Based Rates for Wholesale Sales of Electric Energy, Capacity and Ancillary Services by Public Utilities, Order No. 697, FERC Stats. & Regs. ¶ 31,252, clarified, 121 FERC ¶ 61,260 (2007), order on reh'g, Order No. 697-A, FERC Stats. & Regs. ¶ 31,268, clarified, 124 FERC ¶ 61,055, order on reh'g, Order No. 697-B, FERC Stats. & Regs. ¶ 31,285 (2008), order on reh'g, Order No. 697-C, FERC Stats. & Regs. ¶ 31,291 (2009), order on reh'g, Order No. 697-D, FERC Stats. & Regs. ¶ 31,305 (2010), aff'd sub nom. Montana Consumer Counsel v. FERC, 659 F.3d 910 (9th Cir. 2011); Preventing Undue Discrimination and Preference in Transmission Service, Order No. 890, FERC Stats. & Regs. ¶ 31,241, order on reh'g, Order No. 890-A, FERC Stats. & Regs. ¶ 31,261 (2007), order on reh'g, Order No. 890-B, 123 FERC ¶ 61,299 (2008), order on reh'g, Order No. 890-C, 126 FERC ¶ 61,228 (2009), order on reh'g, Order No. 890-D, 129 FERC ¶ 61,126 (2009); Wholesale Competition in Regions with Organized Electric Markets, Order No. 719, FERC Stats. & Regs. ¶ 31,281 (2008), order on reh'g, Order No. 719-A, FERC Stats. & Regs. ¶ 31,292 (2009), order on reh'g, Order No. 719-B, 129 FERC ¶ 61,252 (2009).

    Back to Citation

    10.  Order No. 888, FERC Stats. & Regs. ¶ 31,036 at 31,781.

    Back to Citation

    11.  Order No. 888 required six Ancillary Services to be included in the OATT: (1) Scheduling, System Control and Dispatch; (2) Reactive Supply and Voltage Control from Generation Sources; (3) Regulation and Frequency Response; (4) Energy Imbalance; (5) Operating Reserve—Spinning; and (6) Operating Reserve—Supplemental. Order No. 890 later added a seventh OATT ancillary service: Generator Imbalance. See Order No. 890, FERC Stats. & Regs. ¶ 31,241 at P 85.

    Back to Citation

    12.  82 FERC ¶ 61,114, at 61,406-07 (1998) (Ocean Vista).

    Back to Citation

    13.  Avista, 87 FERC at 61,882.

    Back to Citation

    14.  These ancillary services included: Regulation and Frequency Response, Energy Imbalance, Operating Reserve—Spinning, and Operating Reserve—Supplemental. The Commission did not extend this Avista policy to Reactive Supply and Voltage Control from Generation Sources service, which means that third parties wishing to sell this ancillary service at market-based rates would remain subject to the pre-Avista market power screen requirement. The Commission also did not extend the Avista policy to Scheduling, System Control and Dispatch service. However, because only balancing area operators can provide this ancillary service, it does not lend itself to competitive supply.

    Back to Citation

    15.  One of the restrictions imposed in Avista was an obligation for sellers to establish an Internet-based Web site for providing information about and transacting ancillary services and on-going reports to the Commission detailing their activities in the ancillary services markets. See Avista, 87 FERC at 61,883. In Order No. 697, the Commission concluded that subsequent implementation of electric quarterly report (EQR) filing requirements justified eliminating these requirements under the Avista policy.

    Back to Citation

    16.  Subsequently, as the Commission recognized in Order No. 697, most RTOs and ISOs developed formal ancillary service markets, thus rendering this component of the Avista policy largely superfluous. See Order No. 697, FERC Stats. & Regs. ¶ 31,252 at n.1194 and P 1069.

    Back to Citation

    17.  Avista, 87 FERC ¶ 61,223 at n.12.

    Back to Citation

    18.  See Avista Rehearing Order, 89 FERC at 61,391-92 (stating that the Commission is “able to grant blanket authority for flexible pricing only because the price charged by the third-party supplier is disciplined by the obligation of the transmission provider to offer these services under cost-based rates. This discipline would be thwarted if the transmission provider could substitute purchases under non-cost-based rates for its mandatory service obligation.”)

    Back to Citation

    19.  Order No. 697, FERC Stats. & Regs. ¶ 31,252 at P 1052.

    Back to Citation

    20.  Id. P 1061.

    Back to Citation

    21.  WSPP, Inc., 134 FERC ¶ 61,169 (2011).

    Back to Citation

    22.  See, e.g., Integration of Variable Energy Resources, Order No. 755, FERC Stats. & Regs. ¶ 32,664 (2010); and Demand Response Compensation in Organized Wholesale Energy Markets, Order No. 745, 76 FR 16658 (Mar. 24, 2011), FERC Stats. & Regs. ¶ 31,322 (2011).

    Back to Citation

    23.  WSPP Comments at 7-10, ENBALA Comments at 2-3, California Storage Alliance Comments at 5-6, and ESA Comments at 8.

    Back to Citation

    24.  As noted above, most RTOs and ISOs have developed formal ancillary service markets, allowing for the sale of ancillary services at market-based rates in those regions.

    Back to Citation

    25.  PPL Companies Comments at 3, EPSA Comments at 5-6, and Portland General Comments at 3-4, Shell Energy Comments at 13-16, Powerex Comments at 38-40, and WSPP Comments at 11-12. While several commenters also support the idea of developing less challenging analyses for measuring ancillary service market power, none provides any concrete proposals. See, e.g., California PUC Comments at 5.

    Back to Citation

    26.  See, e.g., Southern California Edison Comments at 5-6 and WSPP Comments at 16.

    Back to Citation

    28.  Order No. 697, FERC Stats. & Regs. ¶ 31,252 at PP 13, 62. See also 18 CFR § 35.37(b), (c)(1) (2011).

    Back to Citation

    29.  Order No. 697, FERC Stats. & Regs. ¶ 31,252 at P 43.

    Back to Citation

    30.  Id. PP 43-44, 80, 89.

    Back to Citation

    32.  Order No. 697, FERC Stats. & Regs. ¶ 31,252 at P 42.

    Back to Citation

    34.  18 CFR 35.37(c)(2) (2011). For purposes of rebutting the presumption of horizontal market power, sellers may use the results of the DPT to perform pivotal supplier and market share analyses and market concentration analyses using the Herfindahl-Hirschman Index (HHI). The HHI is a widely accepted measure of market concentration, calculated by squaring the market share of each firm competing in the market and summing the results. The Commission has stated that a showing of an HHI less than 2,500 in the relevant market for all season/load periods for sellers that have also shown that they are not pivotal and do not possess a market share of 20 percent or greater in any of the season/load periods would constitute a showing of a lack of horizontal market power, absent compelling contrary evidence from intervenors. Order No. 697, FERC Stats. & Regs. ¶ 31,252 at P 111.

    Back to Citation

    36.  Order No. 697, FERC Stats. & Regs. ¶ 31,252 at P 15.

    Back to Citation

    37.  Order No. 697, FERC Stats. & Regs. ¶ 31,252 at P 268.

    Back to Citation

    38.  Studies of Simultaneous Transmission Import Limits (SIL) quantify a study area's simultaneous import capability from its aggregated first-tier area. SIL studies are used as a basis for calculating import capability to serve load in the relevant geographic market when performing market power analyses.

    Back to Citation

    39.  WSPP Comments at 7-10; ENBALA Comments at 2-3; California Storage Alliance Comments at 5-6; and, ESA Comments at 8. Several of these commenters request that new reporting requirements be imposed to facilitate sellers' ability to perform market power analyses for ancillary services markets.

    Back to Citation

    40.  PPL Companies Comments at 3, EPSA Comments at 5-6, and Portland General Comments at 3-4, Shell Energy Comments at 13-16, Powerex Comments at 38-40, and WSPP Comments at 11-12.

    Back to Citation

    41.  See, e.g., Order No. 890-A, FERC Stats. & Regs. ¶ 31,261, Pro Forma OATT at Schedule 6, Operating Reserve—Supplemental Reserve Service.

    Back to Citation

    42.  See, e.g., NERC Reliability Standard BAL-002-1, Disturbance Control Performance at R4.2, available at http://www.nerc.com/​files/​BAL-002-1.pdf.

    Back to Citation

    43.  Shell Energy Comments at 12.

    Back to Citation

    44.  See Order No. 890-A, FERC Stats. & Regs. ¶ 31,261 at P 309.

    Back to Citation

    45.  FERC, Principles for Efficient and Reliable Reactive Power Supply and Consumption, Docket No. AD05-1-000, at 18 (2005), available at http://www.ferc.gov/​EventCalendar/​Files/​20050310144430-02-04-05-reactive-power.pdf. (“Reactive power is difficult to transport. At high loadings, relative losses of reactive power on transmission lines are often significantly greater than relative real power losses * * * Losses in transmission lead to the expression that reactive power does not travel well.”).

    Back to Citation

    46.  See, e.g., California PUC Comments at 5.

    Back to Citation

    47.  See, e.g., NGSA comments at 5 and EPSA comments at 3-4.

    Back to Citation

    48.  The Commission envisions this optional screen being available as a voluntary alternative to the type of market power analyses described in Ocean Vista. The Commission also envisions permitting this optional screen to be used solely in connection with sales of Operating Reserve-Spinning, Operating Reserve-Supplemental, Reactive Supply and Voltage Control, and Regulation and Frequency Response services. Further, if our earlier proposal regarding application of the existing screens to Energy and Generator Imbalance services is not ultimately finalized, then we would envision permitting the application of this optional screen to those ancillary services as well.

    Back to Citation

    49.  This requirement would parallel the existing requirement for a seller that owns, operates or controls transmission to conduct simultaneous transmission import capability studies for its home control area and each of its directly-interconnected first-tier control areas in order to facilitate market power analyses by all sellers in the relevant market. Order No. 697, FERC Stats. & Regs. ¶ 31,252 at P 346. The Commission's existing requirements and policies with regard to submission of historical data would apply. Therefore, any concerns as to possible manipulation of this data should be ameliorated.

    Back to Citation

    50.  Id. P 1048.

    Back to Citation

    52.  For example, the Commission has allowed wind generating facilities that lack five years of operational data to use a five-year average regional wind capacity factor based on data reported by the Energy Information Administration to de-rate their capacity. See Golden Spread Electric Cooperative, Inc., 138 FERC ¶ 61,208 (2012). Additionally, in Order No. 697, the Commission stated that it will allow the capacity of energy-limited facilities to be set equal to their five-year average historical capacity factor. Order No. 697, FERC Stats. & Regs. ¶ 31,252 at P 344. The Commission also stated that it is willing to consider proxy amounts for simultaneous transmission import limits. Id. P 381.

    Back to Citation

    53.  Order No. 697, FERC Stats. & Regs. ¶ 31,252 at P 321.

    Back to Citation

    54.  See, e.g., Central Maine Power Company, 56 FERC ¶ 61,200, at 61,818-19 (1991) (“We are aware of the argument that, due to the need to respond quickly to market changes and opportunities for coordination, in some cases transactions must begin before the utility has a chance to file the rate reflecting the transaction with the Commission. While this argument has some merit, we note that many utilities have managed to avoid this problem by having tariffs on file that permit transactions to be negotiated subject to a cap of 100-percent contribution to fixed costs.” (emphasis added)).

    Back to Citation

    55.  Bonneville Comments at 8-9.

    Back to Citation

    56.  WSPP Comments at 21-22.

    Back to Citation

    57.  ESA Comments at 11-12, PPL Companies Comments at 9, IID Comments at 15, and CAREBS Comments at 6.

    Back to Citation

    58.  See, e.g., Allegheny Energy Supply Co. LLC, 108 FERC ¶ 61,082 (2004).

    Back to Citation

    59.  Order No. 755, FERC Stats. & Regs. ¶ 31,324 at P 68 (“faster-responding resources have the potential to lower frequency regulation capacity requirements, thereby improving market efficiencies”).

    Back to Citation

    60.  The WSPP Agreement was initially accepted by the Commission on a non-experimental basis in 1991, and provided for flexible pricing for coordination sales and transmission services. See Western Sys. Power Pool, 55 FERC ¶ 61,099, order on reh'g, 55 FERC ¶ 61,495 (1991), aff'd in relevant part and remanded in part sub nom. Environmental Action and Consumer Federation of America v. FERC, 996 F.2d 401, 302 U.S. App. D.C. 135 (D.C. Cir. 1992), order on remand, 66 FERC ¶ 61,201 (1994). Prior to 1991, the WSPP Agreement was used for three years on an experimental basis. See Pacific Gas and Electric Co., 50 FERC ¶ 61,339 (1990) (extending the initial two-year period of the WSPP Agreement for an additional year). The WSPP Agreement as it exists today permits sellers of electric energy to charge either an uncapped market-based rate (for public utility sellers, they must have obtained separate market-based rate authorization from the Commission to do this), or an “up to” cost-based ceiling rate. For sellers without market-based rate authority, the cost-based rate under the WSPP Agreement consists of an individual seller's forecasted incremental cost plus an “up to” demand charge based on the average fixed costs of a subset of the original parties to the WSPP Agreement, so long as the seller can justify the use of this charge based on its own fixed costs. Otherwise, the seller must file a separate stand-alone rate schedule that is cost-justified based on the individual seller's own costs. See Western Sys. Power Pool, 122 FERC ¶ 61,139 (2008) (finding that it is not just and reasonable to allow a seller to use the WSPP-wide “up to” demand charge as a ceiling rate in markets where the seller does not have market-based rate authority unless such a seller can cost-justify the use of the “up to” demand charge based on its own fixed costs). Currently, there are over 300 parties to the WSPP Agreement located throughout the United States and Canada, including private, public and governmental entities, financial institutions and aggregators, and wholesale and retail customers.

    Back to Citation

    61.  Frequency Regulation Compensation in the Organized Wholesale Power Markets, FERC Stats. & Regs. ¶ 32,672 (2011) (Frequency Regulation Compensation NOPR). Order No. 755 had not yet issued at the time of the NOI in this proceeding.

    Back to Citation

    62.  See, e.g., Bonneville Comments at 9-10, California Storage Alliance Comments at 14-19, ESA Comments at 27-28, Powerex Comments, Appendix A at 8, and A123 Comments at 2-4. Other comments included WSPP's suggestion that a rate cap proposal could use the two-part rate design described in the Frequency Regulation NOPR, but WSPP does not provide any details regarding how such a rate design could be structured. WSPP Comments at 26-27.

    Back to Citation

    63.  California Storage Alliance Comments at 14-17; ESA Comments at 27-28.

    Back to Citation

    64.  Powerex Comments, Appendix A at 8.

    Back to Citation

    65.  Bonneville Comments at 10.

    Back to Citation

    66.  See, e.g., Order No. 888, FERC Stats. & Regs. ¶ 31,036 at 31,716; pro forma OATT, Original Sheet Nos. 20-21 and Schedule 3, Original Sheet No. 113.

    Back to Citation

    67.  The Commission acknowledges that each balancing authority is responsible for determining its reserve requirements in order to comply with relevant NERC reliability standards, and that sometimes an individual OATT transmission provider may be its own balancing authority and other times it may be part of a larger balancing authority. The Commission also notes that a new standard, BAL-003-1 (Frequency Response and Frequency Bias Setting), is currently under development by NERC stakeholders and may assign a frequency response obligation to each balancing authority or reserve sharing group and require each balancing authority or reserve sharing group to use an appropriate frequency bias setting in its ACE equation and to achieve an adequate annual frequency response measure. While frequency response is distinguished from frequency regulation by the manner in which it is controlled (see, e.g., Order No. 755, FERC Stats. & Regs. ¶ 31,324 at n.5), this standard may also be relevant to a balancing authority's determination of its overall reserve requirements.

    Back to Citation

    68.  139 FERC ¶ 61,246.

    Back to Citation

    69.  NOI, 135 FERC ¶ 61,240 at P 25.

    Back to Citation

    72.  Electricity Consumers Comments at 8.

    Back to Citation

    73.  TAPS Comments at 13.

    Back to Citation

    74.  Id. at 12.

    Back to Citation

    75.  APPA Comments at 7.

    Back to Citation

    76.  Public Interest Organizations Comments at 12.

    Back to Citation

    77.  NGK/TI Comments at 10.

    Back to Citation

    78.  FirstEnergy Comments at 5.

    Back to Citation

    79.  SDG&E Comments at 4.

    Back to Citation

    80.  SolarReserve Comments at 5.

    Back to Citation

    81.  California Storage Alliance Comments at 29; and ESA Comments at 36.

    Back to Citation

    82.  EEI Comments at 10.

    Back to Citation

    84.  California PUC Comments at 7.

    Back to Citation

    85.  The term “public utility” means any person who owns or operates facilities subject to the jurisdiction of the Commission under the Federal Power Act. 18 CFR part 101 (2011) (Definition No. 29).

    Back to Citation

    86.  Applicants for market-based rate authority that do not sell under cost-based rates frequently seek and typically are granted waiver of many or all of these requirements.

    Back to Citation

    87.  NOI, 135 FERC ¶ 61,240 at P 25.

    Back to Citation

    89.  See, discussion of proposed amendments to Form Nos. 1 and 1-F at PP 101-106.

    Back to Citation

    90.  The Commission has not to date received any proposals from public utilities that simultaneously seek to recover costs under cost-based and market-based rate mechanisms using a single energy storage asset, but the Commission remains open to innovative solutions and will evaluate proposals on a case-by-case basis.

    Back to Citation

    91.  For example, a public utility with 90 percent of its service costs recovered under market-based rates and the remaining 10 percent recovered under cost-based rates.

    Back to Citation

    92.  Order No. 697, FERC Stats. & Regs. ¶ 31,252 at P 985.

    Back to Citation

    93.  Revised Public Utility Filing Requirements, Order No. 2001, FERC Stats. & Regs. ¶ 31,127 (2002), reh'g denied, Order 2001-A, 100 FERC ¶ 61,074 (2002), reh'g denied, Order No. 2001-B, 100 FERC ¶ 61,342 (2002), order directing filings, Order No. 2001-C, 101 FERC ¶ 61,314 (2002), order directing filings, Order No. 2001-D, 102 FERC ¶ 61,334, order refining filing requirements, Order No. 2001-E, 105 FERC ¶ 61,352 (2003), clarified, Order No. 2001-F, 106 FERC ¶ 61,060 (2004), order on reh'g, Order No. 2001-G, 120 FERC ¶ 61,270 (2007), order on reh'g, Order No. 2001-H, 121 FERC ¶ 61,289 (2007), order revising filing requirements, Order No. 2001-I, FERC Stats. & Regs. ¶ 31,282 (2008).

    Back to Citation

    94.  See Western Grid Development, LLC, 130 FERC ¶ 61,056, reh'g denied, 133 FERC ¶ 61,029 (2010) (Western Grid).

    Back to Citation

    95.  See FERC Account Nos. 330-337 and 535-545.1, 18 CFR part 101 (2011); and Form Nos. 1, 1-F, and 3-Q, 18 CFR part 141 (2011).

    Back to Citation

    96.  For example, as a distribution resource recorded in the account the asset could assist with voltage regulation which may require it to absorb electricity rather than only supply it at times.

    Back to Citation

    98.  See Electric Plant Instruction No. 9(D), Equipment, 18 CFR part 101 (2011).

    Back to Citation

    99.  See, e.g., Electric Plant Instruction No. 3(A)(18), Earnings and Expenses During Construction, 18 CFR Part 101 (2011).

    Back to Citation

    100.  These proposed energy storage O&M expense accounts are discussed in more detail below at section 1(c).

    Back to Citation

    101.  NOI, 135 FERC ¶ 61,240 at PP 38-44.

    Back to Citation

    102.  California Storage Alliance Comments at 32-34; ESA Comments at 39-41.

    Back to Citation

    103.  For example, purchased power may be consumed or lost during the conversion process where electric energy is received from the grid, stored as another form of energy and later transmitted to the grid as electric energy.

    Back to Citation

    104.  California Storage Alliance Comments at 34 and 37; ESA Comments at 41 and 45.

    Back to Citation

    105.  EEI Comments at 12. EEI indicated that in instances where energy storage assets provide a transmission function, the following O&M accounts associated with transmission can be used: Accounts 560, 561.5, 561.8, 562-564, 566-576.

    Back to Citation

    106.  For example, the procedures and practices involving repair of a flywheel that serves a transmission function may not be the same as the procedures and practices involving repair of a transmission line.

    Back to Citation

    107.  For example, certain O&M expenses for generator equipment used in storage operations that serves a transmission function are not well suited for recording in existing transmission O&M expense accounts. Such expenses are the type of expenses that would typically be incurred in production operations; however, because the generator equipment serves a transmission function, the nature of the expense is not production. In such cases, the O&M expenses for generator equipment should be recorded as a transmission expense using the appropriate energy storage equipment transmission O&M expense account.

    Back to Citation

    108.  See, e.g., TAPS Comments at 17-18; BrightSource Comments at 7; and Viridity Comments at 4.

    Back to Citation

    109.  See, e.g., California Storage Alliance Comments at 34; ESA Comments at 42; and FirstEnergy Comments at 5.

    Back to Citation

    110.  See, e.g., California Storage Alliance Comments at 41; ESA Comments at 49; and TAPS Comments at 16.

    Back to Citation

    111.  See, e.g., California Storage Alliance Comments at 39-42; and ESA Comments at 47-50.

    Back to Citation

    112.  The 10,000 kW threshold is currently applied to gas-turbine, internal combustion, nuclear, and conventional hydro and pumped storage plants. There is a separate 25,000 kW threshold for steam plants (e.g., coal, oil).

    Back to Citation

    113.  See Appendix B Proposed Amendments to Form Nos. 1, 1-F and 3-Q.

    Back to Citation

    116.  The Form No. 3-Q estimate is one hour since the information is already collected and will only require a minor separation of costs.

    117.  The burden in Year 1 is 1,320 hrs. The average annualized burden over Years 1-3 is 440 hr. (1,320/3).

    Back to Citation

    118.  Regulations Implementing the National Environmental Policy Act, Order No. 486, 52 FR 47,897 (Dec. 17, 1987), FERC Stats. & Regs., Regulations Preambles 1986-1990 ¶ 30,783 (1987).

    Back to Citation

    122.  13 CFR 121.201, Sector 22, Utilities.

    Back to Citation

    123.  See 5 U.S.C. 601(3) citing to section 3 of the Small Business Act, 15 U.S.C. 632. Section 3 of the Small Business Act defines a “small-business concern” as a business which is independently owned and operated and which is not dominant in its field of operation. The Small Business Size Standards component of the North American Industry Classification System defines a small electric utility as one that, including its affiliates, is primarily engaged in generation, transmission, and/or distribution of electric energy for sale and whose total electric output for the preceding fiscal years did not exceed 4 million MWh. 13 CFR 121.201 (2011).

    Back to Citation

    BILLING CODE 6717-01-P

    [FR Doc. 2012-15763 Filed 7-6-12; 8:45 am]

    BILLING CODE 6717-01-C

Document Information

Comments Received:
0 Comments
Published:
07/09/2012
Department:
Federal Energy Regulatory Commission
Entry Type:
Proposed Rule
Action:
Notice of Proposed Rulemaking.
Document Number:
2012-15763
Dates:
Comments are due 60 days after publication in the Federal
Pages:
40413-40458 (46 pages)
Docket Numbers:
Docket Nos. RM11-24-000 and AD10-13-000
Topics:
Electric power rates, Electric utilities
PDF File:
2012-15763.pdf
CFR: (4)
18 CFR 35.28
18 CFR 35.37
18 CFR 35.38
18 CFR 37.6