98-20997. Complaint Procedures  

  • [Federal Register Volume 63, Number 151 (Thursday, August 6, 1998)]
    [Proposed Rules]
    [Pages 41982-41991]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-20997]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    
    18 CFR Parts 1b, 343, and 385
    
    [Docket No. RM98-13-000]
    
    
    Complaint Procedures
    
    July 29, 1998.
    AGENCY: Federal Energy Regulatory Commission.
    
    ACTION: Notice of Proposed Rulemaking.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The Federal Energy Regulatory Commission (Commission) is 
    proposing to revise its regulations (Rule 206) governing complaints 
    filed with the Commission under the Interstate Commerce Act, the 
    Federal Power Act, the Natural Gas Act, the Natural Gas Policy Act, and 
    the Public Utility Regulatory Policies Act of 1978. The goals of the 
    proposed revisions are to encourage and support consensual resolution 
    of complaints, and to organize the complaint procedures so that all 
    complaints are handled in a timely and fair manner.
        The Commission also proposes to revise certain sections of its 
    procedural rules applicable to oil pipeline proceedings, to conform to 
    the proposed changes in the complaint procedures regulations. In 
    addition, the Commission proposes to revise its alternative dispute 
    resolution regulations to conform to the changes made by the 
    Administrative Dispute Resolution Act of 1996, and to codify its 
    current Enforcement Hotline procedures in the rules relating to 
    investigations.
    
    DATES: Comments are due October 5, 1998.
    
    ADDRESSES: Federal Energy Regulatory Commission, 888 First Street, 
    N.E., Washington, D.C. 20426.
    
    FOR FURTHER INFORMATION CONTACT: David Faerberg, Office of the General 
    Counsel, Federal Energy Regulatory Commission, 888 First Street, N.E., 
    Washington, D.C. 20426, (202) 208-1275.
    
    SUPPLEMENTARY INFORMATION: In addition to publishing the full text of 
    this document in the Federal Register, the Commission also provides all 
    interested persons an opportunity to inspect or copy the contents of 
    this document during normal business hours in the Public Reference Room 
    at 888 First Street, N.E., Room 2A, Washington, D.C. 20426.
        The Commission Issuance Posting System (CIPS) provides access to 
    the texts of formal documents issued by the Commission. CIPS can be 
    accessed via
    
    [[Page 41983]]
    
    Internet through FERC's Homepage (http://www.ferc.fed.us) using the 
    CIPS Link or the Energy Information Online icon. The full text of this 
    document will be available on CIPS in ASCII and WordPerfect 6.1 format. 
    CIPS is also available through the Commission's electronic bulletin 
    board service at no charge to the user and may be accessed using a 
    personal computer with a modem by dialing 202-208-1397, if dialing 
    locally, or 1-800-856-3920, if dialing long distance. To access CIPS, 
    set your communications software to 19200, 14400, 12000, 9600, 7200, 
    4800, 2400, or 1200 bps, full duplex, no parity, 8 data bits and 1 stop 
    bit. User assistance is available at 202-208-2474 or by E-mail to 
    [email protected]
        This document is also available through the Commission's Records 
    and Information Management System (RIMS), an electronic storage and 
    retrieval system of documents submitted to and issued by the Commission 
    after November 16, 1981. Documents from November 1995 to the present 
    can be viewed and printed. RIMS is available in the Public Reference 
    Room or remotely via Internet through FERC's Homepage using the RIMS 
    link or the Energy Information Online icon. User assistance is 
    available at 202-208-2222, or by E-mail to [email protected]
        Finally, the complete text on diskette in WordPerfect format may be 
    purchased from the Commission's copy contractor, La Dorn System 
    Corporation. La Dorn Systems Corporation is located in the Public 
    Reference Room at 888 First Street, N.E., Washington, D.C. 20426.
    
    Notice of Proposed Rulemaking
    
        The Federal Energy Regulatory Commission (Commission) is proposing 
    to revise section 385.206 of its regulations (Rule 206) 1 
    governing complaints filed with the Commission under the Interstate 
    Commerce Act, the Federal Power Act, the Natural Gas Act, the Natural 
    Gas Policy Act, and the Public Utility Regulatory Policies Act of 1978. 
    The goals of the proposed revisions are to encourage and support 
    consensual resolution of complaints, and to organize the complaint 
    procedures so that all complaints are handled in a timely and fair 
    manner.
    ---------------------------------------------------------------------------
    
        \1\ 18 CFR 385.206 (1998).
    ---------------------------------------------------------------------------
    
        The Commission also proposes to revise certain sections of Part 
    343, Procedural Rules Applicable to Oil Pipeline 
    Proceedings,2 to conform to the proposed changes in the 
    Commission's complaint procedures in Part 385 of the regulations. In 
    addition, the Commission proposes to revise its alternative dispute 
    resolution (ADR) regulations (Rules 604, 605 and 606) 3 to 
    conform to the changes made by the Administrative Dispute Resolution 
    Act of 1996,4 and to codify its current Enforcement Hotline 
    procedures in Part 1b, Rules Relating to Investigations.5
    ---------------------------------------------------------------------------
    
        \2\ 18 CFR Part 343 (1998).
        \3\ 18 CFR 385.604-606 (1998).
        \4\ Pub. L. 104-320, 110 Stat. 3870 (October 19, 1996).
        \5\ 18 CFR Part 1b (1998).
    ---------------------------------------------------------------------------
    
    I. Background
    
        The Commission first received requests to change its complaint 
    procedures in filings arising out of a proceeding concerning interstate 
    natural gas pipelines. The Pipeline Customer Coalition 6 
    filed a proposal for expedited procedures for the consideration and 
    resolution of complaints filed with respect to natural gas pipeline 
    rates, services, or practices.7 The Interstate Natural Gas 
    Association Of America (INGAA) filed its own proposal and comments in 
    opposition to the Coalition's proposal.8
    ---------------------------------------------------------------------------
    
        \6\ The Pipeline Customer Coalition consists of the American 
    Iron and Steel Institute, the LDC Caucus of the American Gas 
    Association, American Public Gas Association, Associated Gas 
    Distributors, Georgia Industrial Group, Independent Petroleum 
    Association of America, Natural Gas Supply Association, Process Gas 
    Consumers, and United Distribution Companies.
        \7\ Comments and Petition of the Pipeline Customer Coalition, 
    and Amended Petition of the Pipeline Customer Coalition for Proposed 
    Rulemaking filed on May 31, 1996, and April 3, 1997, respectively, 
    in Regulation of Negotiated Transportation Services of Natural Gas 
    Pipelines, et al., Docket Nos. RM96-7-000 and RM96-12-000.
        \8\ Comments and Petition of the Interstate Natural Gas 
    Association of America filed on April 10, 1997, in Regulation of 
    Negotiated Transportation Services of Natural Gas Pipelines, et al., 
    Docket Nos. RM96-7-000, RM96-12-000, and RM97-4-000.
    ---------------------------------------------------------------------------
    
        On March 30, 1998, in Docket No. PL98-4-000, the Commission held a 
    symposium on the Commission's complaint procedures to determine (1) how 
    well the Commission's current complaint procedures are working, (2) 
    whether changes to the current complaint procedures are appropriate, 
    and (3) what type of changes should be made.9 Whereas the 
    Coalition's and INGAA's proposals were restricted to complaints against 
    pipelines, the purpose of the symposium was to discuss the Commission's 
    complaint procedures on a generic basis. The Commission obtained a 
    cross section of views from all segments of the gas, electric, and oil 
    pipeline industries, as well as state regulatory agencies and members 
    of the energy bar. The Commission received a number of comments 
    following the symposium representing a broad range of interests from 
    the natural gas pipeline, electric, and oil pipeline industries.
    ---------------------------------------------------------------------------
    
        \9\ Symposium on Process and Reform: Commission Complaint 
    Procedures, Docket No. PL98-4-000.
    ---------------------------------------------------------------------------
    
        As a result of a commitment made by representatives of various 
    segments of the electric industry at the March 30, 1998 symposium, the 
    Electric Industry Dispute Resolution Working Group (Electric Working 
    Group) 10 filed, in Docket No. PL98-4-000, recommendations 
    and proposed procedures for dispute resolution.11
    ---------------------------------------------------------------------------
    
        \10\ The Electric Working Group includes representatives from 
    American Public Power Association, Coalition for a Competitive 
    Electric Market, Edison Electric Institute, Electric Power Supply 
    Association, Illinois Municipal Electric Agency, National Rural 
    Electric Cooperative Association and Transmission Access Policy 
    Study Group, working with the assistance and support of the American 
    Arbitration Association.
        \11\ Electric Industry Dispute Resolution Working Group 
    Recommendations and Proposed Procedures for Dispute Resolution filed 
    on June 23, 1998, in Symposium on Process and Reform: Commission 
    Complaint Procedures, Docket No. PL98-4-000.
    ---------------------------------------------------------------------------
    
        In addition, a team comprised of Staff from different offices 
    within the Commission (called FERC First) recommended an initiative 
    that focuses on revising internal procedures for a more timely 
    resolution of contested matters and complaints. That proposal would 
    accomplish this goal in two ways: (1) significantly expand use of 
    consensual decision-making by greater emphasis on ADR techniques; and 
    (2) use aggressive time limits for the issuance of decisions on matters 
    that are not resolved in a consensual manner. The initiative also 
    proposes new complaint processes for all types of issues and 
    complaints.
    
    II. Discussion
    
    A. Overview
    
        The natural gas and electric industries have undergone and will 
    continue to undergo significant transformations as a result of changes 
    to the Commission's regulatory policies. These industries are now 
    operating in an environment which is increasingly driven by competitive 
    market forces. Because of the short-term transactional nature of the 
    electric and gas markets, and the fact that competitive changes happen 
    quickly, timely and effective resolution of complaints has become more 
    crucial. If the Commission is to use lighter-handed forms of 
    regulation, to maintain balance and equity it must have an organized 
    and fair complaint process to ensure that complainants will receive 
    adequate protection and redress under the statutes administered and 
    enforced by the Commission. An effective complaint
    
    [[Page 41984]]
    
    process would better enable the Commission to monitor activities in the 
    marketplace and provides an early warning system for identifying 
    potential problems. It is in this context that the Commission is 
    proposing changes to its complaint procedures. Revised complaint 
    procedures are necessary to provide assurance to the public that 
    complaints will receive appropriate consideration and that complaints 
    that require expedited consideration will receive it.
        The Commission has received a number of proposals concerning its 
    complaint procedures. These proposals are summarized below, and the 
    Commission invites interested parties to comment on these proposals. 
    The Commission has constructed its own proposal, incorporating what 
    appeared to be the best, and most practical elements of the various 
    proposals and the principles recommended by the Staff initiative. The 
    goals of the Commission's proposed revisions are to encourage and 
    support the resolution of disputes by the parties themselves prior to 
    the filing of a formal complaint, to organize the complaint procedures 
    so that all complaints are handled in a timely, fair manner based upon 
    an appropriate record, and to assure those complaints deserving of 
    expedition receive it, recognizing that the appropriate process to be 
    used for a particular complaint depends on many factors including the 
    parties involved, the harm alleged, and the facts and circumstances 
    surrounding the complaint. The Commission's proposal furthers the goals 
    of promoting early resolution of contested matters and complaints, and 
    focusing on consensual decisionmaking, ADR, and expeditious 
    decisionmaking.
    
    B. Complaint Procedures
    
    1. Proposed Revisions to the Complaint Procedures
        Many disputes can be resolved by parties on an informal basis. 
    Therefore, prior to employing any formal procedures, the Commission 
    strongly encourages potential complainants to use informal procedures 
    to resolve disputes to the extent possible. These informal procedures 
    could include those contained in the tariffs of the pipelines and 
    electric utilities, the Commission's Enforcement Hotline, or other 
    types of voluntary ADR techniques. The Commission believes that 
    informal resolution of disputes will be such an important element to 
    the success of the Commission's revised complaint procedures, that it 
    is prepared to make available resources for parties to call upon to aid 
    their attempts to informally resolve disputes. For example, parties can 
    employ the Commission's Enforcement Hotline to receive information, 
    informal Staff opinions, or assistance in reaching a consensual 
    resolution of a dispute. The Commission requests comments on other 
    types of professional assistance the Commission might provide to 
    facilitate informal dispute resolution. The Commission also requests 
    comments on whether informal procedures prior to filing a formal 
    complaint should be mandatory.
        To the extent potential complaints can be resolved, or the number 
    of issues in a potential complaint can be reduced informally, the 
    Commission can then focus its attention on those complaints concerning 
    the most difficult and contentious issues. Therefore, in the proposed 
    rules the Commission proposes to require complaints to contain a 
    statement of (1) whether informal procedures, including ADR or the 
    Commission's Enforcement Hotline, were used or why they were not used 
    and (2) whether the complainant believes that informal procedures, such 
    as ADR, could successfully resolve the complaint if it were under 
    Commission supervision.
        Under the proposed revisions in this NOPR, the process at the 
    Commission would begin with the filing of a formal complaint pursuant 
    to Rule 206 of the Commission's Rules of Practice and Procedure.
        The Commission proposes to revise Rule 206 to require that a 
    complaint must satisfy certain informational requirements. 
    Specifically, a complaint would have to: (1) clearly identify the 
    action or inaction which is alleged to be unjust, unreasonable, unduly 
    discriminatory or preferential, or otherwise unlawful, or is contrary 
    to a certificate or license condition, a tariff provision, or the terms 
    of an exemption, (2) provide an explanation of the reasons why the 
    action or inaction is unjust, unreasonable, unduly discriminatory or 
    preferential, or otherwise unlawful, or is contrary to a condition in a 
    certificate or license, a tariff provision, or the terms of an 
    exemption, (3) set forth the business, commercial, economic or other 
    issues presented by the action or inaction, service or practice as such 
    relate to or affect the complainant, or, where applicable, the 
    environmental or safety issues presented by the action or inaction, (4) 
    quantify the financial impact or burden (if any) created for the 
    complainant as a result of the action or inaction, or, where 
    applicable, the environmental or safety impacts of the action or 
    inaction, (5) indicate the practical and operational impacts imposed 
    upon the complainant as a result of the action or inaction, or, where 
    applicable, the environmental or safety impacts of the action or 
    inaction, (6) state whether the issues presented are pending in an 
    existing Commission proceeding or a proceeding in any other forum in 
    which the complainant is a party, and if so, provide an explanation why 
    timely resolution cannot be achieved in that forum, (7) state the 
    specific relief requested, including interim relief to preserve the 
    status quo, and in cases of interim relief, a detailed explanation why 
    such relief is required addressing (a) the likelihood of success on the 
    merits, (b) the nature and extent of the harm if interim relief is 
    denied, (c) the balance of the relevant interests, i.e., the hardship 
    to nonmovant if interim relief is granted contrasted with the hardship 
    to the movant if interim relief is denied, and (d) the effect, if any, 
    of the decision on the public interest, (8) include all documents that 
    support the facts in the complaint, including, but not limited to, 
    contracts, affidavits, and testimony, and (9) state whether the 
    Enforcement Hotline or other informal procedures were used, whether the 
    complainant believes that ADR under the Commission's supervision could 
    successfully resolve the complaint, and describe the formal or 
    consensual process the complainant proposes for resolving the 
    complaint.
        In addition, the Commission proposes to revise Rule 206 to require 
    a complainant to serve a copy of the complaint on the respondent and 
    all others who the complainant knows will be affected simultaneously 
    with filing at the Commission. Simultaneous service can be accomplished 
    through electronic mail, fax, express delivery, or messenger. This 
    would be a change from current Commission rules on service for other 
    types of pleadings. The Commission is particularly interested in 
    receiving comments on whether simultaneous service to affected parties 
    is practical.
        The Commission proposes to strictly enforce the filing requirements 
    of Rule 206. Requiring a complainant to set forth its case in some 
    detail should ensure that the respondent, interested parties, and the 
    Commission have adequate information early in the complaint process so 
    that each party may begin analyzing the complaint and consider proposed 
    courses of action.
        After a complaint is filed with the Commission, a public notice of 
    the complaint would be issued within 2 days to give interested parties 
    an opportunity to intervene and be heard.
    
    [[Page 41985]]
    
    This will be a ministerial action. The Commission does not propose to 
    screen the complaint for sufficiency at that point. After an answer is 
    filed, the Commission will consider any alleged deficiencies in the 
    complaint. The Commission will exercise its discretion to determine the 
    sufficiency of a complaint. However, a complainant who fails to meet 
    the Commission's filing requirements runs the risk that its complaint 
    will be dismissed for a failure to meet its burden unless it adequately 
    explains why the information was not presented. The Commission also 
    proposes to revise Rule 206 to provide that answers to complaints, 
    comments, and interventions must be filed no later than 10 days after 
    the complaint is filed. This process is patterned after the interstate 
    natural gas pipeline rate rules where intervention and answer dates are 
    triggered by the filing date and not the notice date.12 This 
    would be a change from the current complaint rules. The Commission 
    requests comment as to whether 10 days from the date of filing of the 
    complaint is adequate in all circumstances to file answers, comments, 
    and interventions.
    ---------------------------------------------------------------------------
    
        \12\ 18 CFR 154.210 (1998).
    ---------------------------------------------------------------------------
    
        Certain sections of Part 343, Procedural Rules Applicable to Oil 
    Pipeline Proceedings, will need to be revised to conform with the 
    proposed changes to the Commission's complaint procedures. Therefore, 
    the Commission proposes to revise paragraph (c)(3) of Sec. 343.2 of the 
    Commission's regulations to require that complaints involving non-rate 
    matters must also comply with Rule 206. The Commission also proposes to 
    revise Sec. 343.4(a) to require that answers must be filed in 
    accordance with Rule 206. Thus, the time for answers for oil pipeline 
    complaints will be reduced from 30 days to 10 days after the filing of 
    the complaint.
        As a corollary to the more detailed filing requirements for a 
    complaint, the Commission proposes to strictly enforce Rule 213 of the 
    Commission's Rules of Practice and Procedure, which requires that an 
    answer to a complaint ``admit or deny, specifically and in detail, each 
    material allegation of the pleading answered'' and ``set forth every 
    defense relied on.'' 13 This would help to define the 
    controverted issues early and thus provide a framework for the 
    Commission to decide on a procedure for resolving the dispute as 
    quickly as possible. In addition, the Commission is proposing to revise 
    Rule 213 to require that answers to complaints must include all 
    documents that support the facts in the answer, including, but not 
    limited to contracts, affidavits, and testimony. To the extent that a 
    respondent does not comply with Rule 213, the Commission will consider 
    granting the relief requested by the complainant based upon the 
    pleadings alone. Respondents filing what is in essence a general denial 
    would do so at their own peril. The respondent should also describe the 
    formal or consensual process it proposes for resolving the complaint.
    ---------------------------------------------------------------------------
    
        \13\ 18 CFR 385.213(c)(1998).
    ---------------------------------------------------------------------------
    
        Once an answer has been filed, there are basically three different 
    procedures that the Commission proposes to use to resolve issues raised 
    in complaints. This is not a comprehensive list and the Commission asks 
    for comments on others that might be appropriate. The objective in all 
    instances would be selection of a fair and equitable process that would 
    allow a resolution of the complaint as expeditiously as possible given 
    the issues, parties, and circumstances. The Commission does not propose 
    to establish any overall time limits within which complaints must be 
    resolved, given the variability of possible issues and the limited 
    extent of the Commission's resources. The Commission, however, would be 
    committed to resolving complaints in the most expeditious manner 
    possible. In this regard, therefore, the Commission indicates below 
    some target time frames for the resolution of complaints depending on 
    the type of procedure used.
        The first possible procedural path for a complaint would be for a 
    complaint to be decided by the Commission based upon the pleadings 
    alone. In cases where the complaint is to be decided based upon the 
    pleadings alone, the Commission would endeavor to issue an order on the 
    complaint within 60-90 days after the answer is filed. The length of 
    time in which an order could be issued would depend on the complexity 
    of the complaint. A complaint concerning a straightforward 
    interpretation of a tariff or contract should be resolved in 60 days or 
    less, while a complaint concerning policy issues closely intertwined 
    with difficult interpretation issues might take longer.
        If a complaint does not lend itself to a decision on the merits 
    based upon the pleadings, the Commission could order an expedited 
    hearing before an ALJ, convene a conference, or assign the complaint to 
    an ADR procedure, where appropriate. If the Commission takes one of 
    these procedural paths, the intention is to issue an order selecting 
    one of these paths within approximately 30 days after the answer is 
    filed. The second possible procedural path for a complaint is an 
    expedited hearing. In cases where the complaint is set for an expedited 
    hearing before an ALJ, the objective would be to have an initial 
    decision rendered within 60 days. The Commission's objective then would 
    be to issue its order on an appeal from the initial decision concerning 
    a complaint within 90 days after briefs opposing exceptions are filed. 
    The overall time in which it would take to issue an order on exceptions 
    from an initial decision could be reduced to the extent that parties 
    can agree on reducing the time currently allowed for the filing of 
    briefs on an opposing exceptions.14 If there are no 
    exceptions to the initial decision, then under Rule 712 15 
    the ALJ's decision would become the final agency action.
    ---------------------------------------------------------------------------
    
        \14\ Pursuant to Rule 711, 18 CFR 385.711 (1998), briefs on 
    exceptions are due not later than 30 days after service of the 
    initial decision and briefs opposing exceptions are due 20 days 
    thereafter.
        \15\ 18 CFR 385.712 (1998).
    ---------------------------------------------------------------------------
    
        Where the parties have agreed that ADR under the Commission's 
    auspices would be beneficial, the Commission could issue an order 
    directing that the complaint be resolved through alternative dispute 
    resolution techniques such as mediation, arbitration, mini trial, or 
    proceeding before a settlement judge. This is the third procedural path 
    a complaint may take. Since ADR is a voluntary process, the time period 
    in which a decision can be rendered is largely in the control of the 
    affected parties. The Commission's objective, however, would be to 
    issue any subsequent orders on complaints resolved through ADR in a 
    meaningful time period.
        It is important for parties to have a role in determining the 
    process that should be used for resolving a complaint. If parties are 
    unable to resolve their dispute through informal procedures, the 
    Commission encourages them to at least agree on the procedures for 
    resolving a formal complaint filed with the Commission. The parties 
    should also inform the Commission when a decision is needed in order to 
    satisfy their business needs. Under the proposed revisions, if the 
    parties reach agreement concerning the procedures to be used and the 
    requested time for action, every effort would be made to honor the 
    proposal of the parties. Parties need to understand that the 
    Commission's ability to resolve a complaint in a timely and meaningful 
    manner will be enhanced if the parties can at least agree on a process 
    if not the substance. Parties should also recognize that the more 
    formal the complaint procedure the more time it is likely to
    
    [[Page 41986]]
    
    take the Commission to render a decision.
        There is undoubtedly a category of case that would require 
    immediate action by the Commission. To the extent the Commission has 
    the authority, the Commission could issue an order expeditiously to 
    preserve the status quo pending a final resolution of the complaint on 
    the merits.
        In its proposal the Electric Working Group suggested that relief 
    should be granted based on the following factors: (1) likelihood of 
    success on the merits; (2) whether irreparable injury to complainant 
    will occur if the relief is not granted; (3) whether the injury 
    outweighs harm to the respondent or other parties to the proceeding if 
    the relief is granted; and (4) other public interest considerations. 
    These are the standards used by Courts of Appeal when considering 
    requests to stay administrative orders, as well as deciding whether to 
    grant preliminary relief,16 but are not the standards 
    currently used by the Commission to decide whether to stay its own 
    orders. 17 The Commission proposes to adopt the standards 
    proposed by the Electric Working Group but requests comments on whether 
    other standards should be established for granting such interim relief.
    ---------------------------------------------------------------------------
    
        \16\ See Virginia Petroleum Jobbers Ass'n v. FPC, 259 F.2d 921, 
    925 (D.C. Cir. 1958).
        \17\ In acting on requests for stay, the Commission applies the 
    standard set forth in section 705 of the Administrative Procedure 
    Act, 5 USC 705 (1988), i.e., the stay will be granted if ``justice 
    so requires.''
    ---------------------------------------------------------------------------
    
    2. Alternative Complaint Procedures
        The procedures proposed here must be viewed against a background of 
    a more complex energy market where regulated and unregulated companies 
    are driven increasingly by competitive market forces. The dynamics of 
    competitive markets and lighter-handed Commission regulation can be 
    expected to change the nature of the complaints received. The 
    Commission will be faced both with unusual commercial problems and with 
    requests for relief in the context of rapidly moving competitive 
    circumstances. The Commission therefore anticipates that greater 
    demands will be placed upon it to respond expeditiously to resolve 
    disputes.
        The question the Commission now confronts is how to structure its 
    processes to ensure rapid response to market issues. One of the 
    elements of the Staff's proposal was for certain disputes to be 
    assigned to Office Directors for resolution by Letter Order. The 
    Electric Working Group also suggested that, where appropriate, a 
    complaint could be assigned to an Office Director who would prepare a 
    Letter Order for issuance by the Commission. It may be helpful to 
    employ a Letter Order or delegation of some complaint responsibilities 
    to staff or ALJs to achieve expedition where possible. Complaints 
    represent an important source of information that allows the Commission 
    to monitor activities in the marketplace. Based on complaints, the 
    Commission is often able to identify instances where there is a need 
    for policy change or development. Complaints frequently plow new legal 
    ground as well. Thus, delegation of complaint authority would not be 
    implemented in a way that would impair the Commission's growing 
    monitoring role or exclude Commissioners from decisions involving 
    complex fact issues, new policy concerns, or unresolved law or other 
    important issues. In a limited and well-defined category of cases, 
    perhaps delegations could be adopted that handle more routine 
    commercial issues with real expedition, subject to rehearing before the 
    Commission.
        The Commission is therefore interested in comment on whether there 
    may be a limited category of cases which could be handled by delegation 
    or Commission letter order to expedite resolution without compromising 
    the full Commission's oversight responsibility. In seeking comment in 
    this area, the Commission is preparing itself for types and numbers of 
    cases that are likely to arise from the competitive market and 
    reinforcing its commitment to be more responsive to the evolving 
    market. The Commission may also achieve expedition through deadlines 
    for completing specific processes.
        One avenue for resolving requests for interim relief expeditiously 
    might be assignment to an administrative law judge. An ALJ could hold 
    oral argument to determine whether to issue an order that would 
    preserve the status quo pending a final decision on the merits of the 
    complaint. In cases where such interim relief is requested, the ALJ 
    could issue an order shortly after the oral argument. The ALJ would 
    have the discretion to determine an appropriate time for action based 
    upon the nature of the complaint. The Commission requests comment on 
    whether this procedure would be an advantage in expediting the 
    resolution of requests for immediate relief.
        In addition to the procedures discussed above, the Commission would 
    like to receive comments on whether there should be special procedures 
    established in cases where small customers allege harm or there is a 
    small amount of money in controversy. The Commission envisions that 
    such procedures could be akin to a small claims court. The Commission 
    requests comments on how it should define a small customer, and what 
    could be an appropriate ceiling level for the amount in controversy.
        The Commission requests comments on whether a complainant filing 
    under a small claims court type procedure should be required to satisfy 
    all the informational requirements contained in revised Rule 206. The 
    Commission, for example, could create a standard short-form complaint 
    in which the complainant would state why it is eligible for the 
    procedure, provides a brief description of the facts and circumstances 
    surrounding the complaint, and states the requested relief. The 
    Commission could make such a short-form complaint available in both 
    paper and electronic format and could even provide for the electronic 
    filing of such a complaint. Similarly, the Commission could reduce the 
    requirements for an answer under this procedure. There are a number of 
    ways in which the Commission could handle a short-form complaint. An 
    Office Director, acting under delegated authority, could issue an order 
    based upon the pleadings. An ALJ could be assigned to issue orders on 
    such complaints and where necessary hear arguments. Finally, a single 
    Commissioner could be designated to decide such complaints, similar to 
    the Motions Commissioner under the existing rules for interlocutory 
    appeals.18 In any of these instances, the Commission 
    envisions that an order would be issued within 30 days after the 
    complaint is filed. The order could be appealable to the Commission. 
    The Commission requests comments on these proposals and other 
    procedures that could be used in lieu of the proposed small claims 
    court type process.
    ---------------------------------------------------------------------------
    
        \18\ 18 CFR 385.715 (1998).
    ---------------------------------------------------------------------------
    
    3. Other Approaches
        The Commission has formulated proposed changes in its complaint 
    procedures that incorporate what appeared to be the best and most 
    practical elements from the various proposals it has received. Among 
    those was one from the staff initiative. The FERC First Staff proposed 
    a multi-disciplinary Commission team that would identify one of four 
    potential resolution paths for a complaint: (1) ADR, if settlement is 
    likely; (2) injunctive type relief from an
    
    [[Page 41987]]
    
    administrative law judge (ALJ) if the complaint is time sensitive; (3) 
    an order issued by the Commission or an office director by delegation 
    where clear precedent exists and where there are no genuine issues of 
    material fact in dispute; and (4) hearing for a fact intensive dispute 
    that would benefit from the development of an evidentiary record.
        The Commission also has received three comprehensive industry 
    proposals concerning revisions to the Commission's complaint 
    procedures. These proposals, which are summarized below, were filed by 
    the Coalition, INGAA, and the Electric Working Group. Their complete 
    proposals can be found in their respective pleadings. The Commission 
    requests parties to comment on these industry proposals. Given that the 
    proposals are industry specific, the comments should include the extent 
    to which such proposals, with modifications, could be adopted by the 
    Commission on a generic basis, as well as what aspects of such 
    proposals could be incorporated into the Commission's proposal 
    discussed above. Although comments have been filed on the Coalition's, 
    the Electric Working Group's, and INGAA's proposals, the Commission 
    believes that parties may wish to formally comment given the 
    Commission's plan to revise its complaint procedures on a generic 
    basis.
        a. The Coalition's Proposal. The Coalition's proposal would require 
    natural gas pipelines' tariffs to contain a complaint procedure and 
    would formalize procedures for use of the Commission's Hotline. A 
    complainant's use of the Hotline and a pipeline's complaint procedure 
    would be a prerequisite to using the expedited complaint procedures 
    contained in the Commission's regulations.
        A complaint would qualify for the expedited procedure if it 
    concerns (1) an interpretation of the terms and conditions of a 
    pipeline's tariff, a pipeline's executed service agreement, or a 
    Commission approved settlement agreement, (2) an allegation that a 
    pipeline is engaging in activities involving undue preference, undue 
    discrimination, or unfair competition or which involve violations of 
    law or Commission regulations, and (3) a proposal by the complainant to 
    revise an executed service agreement, an existing pipeline tariff other 
    than a change in the pipeline's approved rates or rate structure, or an 
    operating practice not mentioned or defined in the pipeline tariff.
        Each of the categories would require the Commission to meet strict 
    time deadlines. For example, the Commission would have a total of 90 
    days to rule on complaints concerning interpretation issues.
        Complaints concerning rates or rate structure would not qualify for 
    the expedited procedure. The Commission would still have to summarily 
    dispose of such complaints, as well as other complaints not eligible 
    for the expedited procedures, within 120 days of the notice date or 
    prescribe further procedures with a time for final action.
        A complaint would have to contain a statement of the complaint with 
    business reasons (including financial impact), indicate the absence of 
    other regulatory relief, the specific relief or remedy requested, and a 
    notice. Prior to issuing a notice, the Commission could send the 
    complaint back to the filing party if it was deficient.
        A notice would have to be issued in 15 days. The Coalition proposal 
    would give a total of 45 days for interventions, answers and replies. 
    Interventions would be due 12 days from the notice, answers would be 
    due 30 days from the notice, and replies would be due 45 days from the 
    notice. After all the pleadings are received, the Commission would have 
    30 to 120 days to act on the complaint depending on the type of 
    complaint and the procedural mechanism chosen by the Commission, that 
    is, summary disposition, a technical conference, hearing, etc.
        b. INGAA's Proposal. Under INGA's proposal complaints eligible for 
    expedited consideration are those for the interpretation of the terms 
    and conditions of a natural gas company's tariff or service agreements. 
    Included would also be complaints alleging undue discrimination in 
    providing transportation and storage services. Complaints to change a 
    pipeline's tariff or executed service agreement would not fall under 
    this procedure, but under the existing Rule 206 procedure.
        INGAA's proposal consists initially of informal negotiations 
    between designated representatives of the pipeline and the complainant. 
    If these negotiations are unsuccessful within a time certain, usually 
    four business days, the complainant can seek informal advice from 
    designated FERC Staff through a codified hotline procedure. If the 
    parties with the help of the Staff cannot resolve the dispute within a 
    time certain, usually nine days after initial contact of the pipeline 
    by the Staff, the complainant has two options.
        The complainant and the pipeline may agree to arbitration. The 
    proposed procedures are similar to those already in place, but would 
    provide for a direct appeal to the Commission of the arbitrator's 
    decision if it is inconsistent with Commission orders, policies, 
    regulations, or jeopardizes the operational integrity of the pipeline. 
    These procedures would be subject to time limits.
        The other option would be for the complainant to proceed directly 
    from the hotline informal advice to the Commission under the formal 
    complaint procedures under Rule 206. The Staff person who handled the 
    Hotline procedure would indicate to the Commission the need for 
    expediting the decision based on the materials that came out during the 
    informal advice stage. No deadlines would be suggested to the 
    Commission so as to assure the discretion it needs for dealing with 
    such complaints.
        The informal procedures, however, would not be prerequisites for a 
    party to file a complaint under Rule 206.
        c. The Electric Working Group's Proposal. Under the Electric 
    Working Group's proposal, parties may agree at any time to ADR, 
    including binding arbitration, of commercial disputes and issues that 
    do not involve challenges to the justness and reasonableness of the 
    rates, terms and conditions of filed contracts, tariffs or other rate 
    schedules.
        The disputing parties may initiate unilateral or bilateral contacts 
    with a Dispute Resolution Task Force or the Enforcement Hotline.
        For a fifteen month pilot period, complainant must submit a dispute 
    to mediation prior to filing a complaint (other than complaints seeking 
    to change filed rates, terms and conditions of service, or seeking 
    expedited relief on the grounds of irreparable harm). The parties must 
    engage in mediation efforts for a period not to exceed thirty days, 
    with the objective of either settling the dispute or narrowing the 
    policy issues and factual disputes remaining to be resolved.
        The Electric Working Group suggested that the Commission create a 
    Division of Dispute Resolution (DDR) that will determine which of 
    several dispute resolution mechanisms will be employed to resolve those 
    disputes not resolved by the pre-complaint procedures.
        The DDR would select the appropriate procedure depending upon the 
    issues presented by the complaint: (1) assignment to an Office Director 
    who will prepare a Letter Order, for issuance by the Commission where 
    required, that resolves the matter; (2) assignment to ADR procedures; 
    (3) assignment to an ALJ who will set a schedule for cross motions for 
    summary judgment and will issue a recommended decision; (4) assignment 
    to an ALJ for hearing on an
    
    [[Page 41988]]
    
    expedited basis or a schedule to be determined by the ALJ; and (5) 
    referral to the Commission.
    
    C. Proposed Revisions to the ADR Regulations
    
        In addition to revising the Commission's complaint procedures, the 
    Commission is also proposing revisions to its ADR regulations in Rules 
    604, 605, and 606 of the Commission's Rules of Practice and Procedure. 
    The Commission's ADR regulations, which were promulgated in Order No. 
    578, are based on the provisions of the Administrative Dispute 
    Resolution Act (ADRA) of 1990.19 In comments filed in Docket 
    No. PL98-4-000, the American Arbitration Association (AAA) submits that 
    several of the ADRA procedures adopted in the Commission's regulations 
    actually impede the use of ADR. AAA states that under the 1990 Act, the 
    disclosure requirements of the Freedom of Information Act (FOIA) 
    preempted the confidentiality provisions of the ADRA. AAA states that 
    materials in the government's possession or in the possession of a 
    neutral who was a government employee were subject to release under 
    FOIA unless a FOIA exemption applied. AAA contends that since 
    confidentiality is essential to the effective use of mediation, the 
    disclosure requirements contained in the 1990 ADRA and adopted by the 
    Commission has a chilling effect upon the voluntary use of mediation.
    ---------------------------------------------------------------------------
    
        \19\ 5 U.S.C. 571-83 (1988), as amended by Pub. L. 102-354, 106 
    Stat. 944 (Aug. 26, 1992.)
    ---------------------------------------------------------------------------
    
        AAA also asserts that voluntary use of arbitration has been 
    curtailed by the inclusion of opt-out provisions in Rules 604 and 605. 
    AAA states that the 1990 ADRA allowed an agency to terminate the 
    arbitration proceeding at any point prior to the issuance of an award. 
    In addition, an agency could vacate or opt-out of an arbitration award 
    within 30 days after the service of the award. This 30 day opt-out 
    period could be extended another 30 days at the discretion of the 
    agency.
        In 1996 Congress passed the Administrative Dispute Resolution Act 
    of 1996. 20 The ADRA of 1996 provides that the 
    confidentiality provisions of the Act pre-empt the disclosure 
    requirements of the FOIA. In addition, the termination and opt-out 
    provisions are eliminated. AAA submits that the Commission should amend 
    its Rules of Practice and Procedure to bring existing Rules 604, 605, 
    and 606 into compliance with the confidentiality, termination and opt-
    out provisions of the 1996 ADRA.
    ---------------------------------------------------------------------------
    
        \20\ Pub. L. 104-320, 110 Stat. 3870 (October 19, 1996).
    ---------------------------------------------------------------------------
    
        In addition, AAA asserts that the Commission should reverse the 
    current requirement that any settlement agreement reached during an ADR 
    process will be subject to the notice and comment provisions of Rule 
    602 ``unless the decisional authority, upon motion or otherwise, orders 
    a different procedure.'' 21 AAA submits that the provision 
    should indicate that agreements reached through mediation are not 
    subject to notice and comment unless the Commission takes affirmative 
    action within a set period of time (30 days). AAA believes that 
    voluntary submission to ADR would increase if the procedural 
    protections discussed above were enacted.
    ---------------------------------------------------------------------------
    
        \21\ 18 CFR 385.604(a)(5)(1998).
    ---------------------------------------------------------------------------
    
        The Commission is proposing revisions to its regulations to address 
    these concerns and requests parties to comment on them and any other 
    related issues. The Commission proposes to revise Rules 604, 605 and 
    606 to conform to the 1996 ADRA by eliminating the termination and opt-
    out provisions, and providing that the confidentiality provisions of 
    the 1996 ADRA pre-empt the disclosure requirements of the FOIA. The 
    Commission is not proposing to revise the regulations to indicate that 
    settlement agreements reached through ADR are not subject to the notice 
    and comment requirements of Rule 602 unless the Commission takes 
    affirmative action within 30 days, as suggested by the AAA. Such a 
    change is not required to conform to the 1996 ADRA. Further, because in 
    many instances settlements entered into by regulated companies can 
    affect parties who were not part of the ADR process, it appears 
    appropriate for the Commission to receive public comments on settlement 
    agreements reached through ADR processes. However, the Commission 
    requests comments on this issue.
    
    D. Codification of Enforcement Hotline Procedures
    
        To make the Enforcement Hotline easier to use, the Commission is 
    proposing to codify the current Hotline procedures in a new Section 
    1b.21. The proposed procedures provide that the Hotline procedures may 
    be used to address quickly and informally any matter within the 
    Commission's jurisdiction, including disputes concerning natural gas 
    pipelines, oil pipelines, electric utilities and hydroelectric 
    projects. The Hotline Staff is authorized to provide information to the 
    public and to give informal staff opinions that do not bind the General 
    Counsel or the Commission. Any person may seek information or the 
    informal resolution of a dispute by calling or writing to the Hotline. 
    The Hotline Staff will informally seek information from the caller and 
    any respondent, as appropriate. The Hotline Staff will attempt to 
    resolve disputes without litigation or other formal proceedings. The 
    Hotline Staff may not resolve matters that are before the Commission in 
    docketed proceedings.
        The proposed procedures also state that all information and 
    documents obtained through the Hotline shall be treated as non-public 
    by the Commission and its staff consistent with the provisions of 
    section 1b.9. Calls to the Hotline may be made anonymously. Self-
    identification by the complainant makes it easier to provide a speedier 
    resolution. Any person who contacts the Hotline is not precluded from 
    filing a formal action with the Commission if discussions are 
    unsuccessful at resolving the matter. A caller may terminate use of the 
    Hotline procedures at any time.
        The Hotline currently operates according to the procedures 
    described above. The Commission proposes to codify them to alert the 
    public to the availability of the Hotline and to provide information on 
    the scope of the service.
    
    III. Information Collection Statement
    
        The following collection of information contained in this proposed 
    rule is being submitted to the Office of Management and Budget (OMB) 
    for review under Section 3507(d) of the Paperwork Reduction Act of 
    1995.22 FERC identifies the information provided under 18 
    CFR Part 385 as FERC-600. FERC-600 consolidates certain existing 
    information collection requirements from the various FERC program 
    offices into one information collection number and accounts for the 
    incremental burden placed on persons filing under the proposed 
    regulations.
    ---------------------------------------------------------------------------
    
        \22\ 44 U.S.C. 3507(d) (1988).
    ---------------------------------------------------------------------------
    
        Comments are solicited on the Commission's need for this 
    information, whether the information will have practical utility, the 
    accuracy of the provided burden estimates, ways to enhance the quality, 
    utility, and clarity of the information to be collected, and any 
    suggested methods for minimizing the burden on persons filing under the 
    revised complaint procedures, including the use of automated 
    information techniques.
    
    [[Page 41989]]
    
        Estimated Annual Burden: The burden estimates for complying with 
    this proposed rule are as follows:
    
    ----------------------------------------------------------------------------------------------------------------
                                                                Number of     Number of     Hours per   Total annual
                         Data collection                       respondents    responses     response        hours   
    ----------------------------------------------------------------------------------------------------------------
    FERC-600................................................           75            75            14         1,050 
    ----------------------------------------------------------------------------------------------------------------
    
        Total Annual Hours for Collection (Reporting + record keeping, if 
    appropriate) = 1,050.
        Based on the Commission's experience with complaints, it is 
    estimated that about 75 filings per year will be made over the next 
    three years at a burden of 14 hours per filing, for a total annual 
    burden of 1,050 hours under the proposed regulations. As described in 
    this proposed rule, the Commission's expectation is that receiving more 
    information in the complaint will lessen the subsequent burden on 
    parties and will shorten the time for resolving a complaint. There is 
    no annual reporting burden under the current regulations.
        Information Collection Costs: The Commission seeks comments on the 
    costs to comply with these requirements. It has projected the average 
    annualized cost for all respondents to be:
        Annualized Capital/Startup Costs--$55,260 Annualized 
    Costs(Operations and Maintenance) ____________ Total Annualized Costs 
    $55,260. Average cost per Respondent $736.80.
        The OMB regulations require OMB to approve certain information 
    collection requirements imposed by agency rule.23 
    Accordingly, pursuant to OMB regulations, the Commission is providing 
    notice of its proposed information collection to OMB.
    ---------------------------------------------------------------------------
    
        \23\ 5 CFR 1320.11
    ---------------------------------------------------------------------------
    
        Title: FERC-600, Rules of Practice and Procedure
        Action: Proposed Data Collection.
        OMB Control No. 1902-____________
        The respondent shall not be penalized for failure to respond to 
    this collection of information unless the collection of information 
    displays a valid OMB control number.
        Respondents: Business or other for profit, including small 
    businesses.
        Frequency of Responses: Infrequent.
        Necessity of Information: The proposed rule requires persons filing 
    complaints and answers to complaints with the Commission to satisfy 
    certain informational requirements, and to provide supporting 
    documentation for the allegations in a complaint and answer to a 
    complaint. The information will allow the Commission to properly 
    evaluate a complaint and resolve it in a timely manner.
        Internal Review: The Commission has assured itself, by means of its 
    internal review, that there is specific, objective support for the 
    burden estimates associated with the information collection 
    requirements. The Commission's Offices of General Counsel, Pipeline 
    Regulation, Electric Power Regulation, and Hydropower Licensing, will 
    use the data to make decisions with respect to the merits of a 
    complaint. This internal review determination involves among, other 
    things, an examination of adequacy of design, cost, reliability, 
    redundancy of the information to be required. These requirements 
    conform to the Commission's plan for efficient information collection, 
    communication, and management within the interstate natural gas 
    pipeline, oil pipeline, electric and hydroelectric industries.
        Interested persons may obtain information on the reporting 
    requirements by contacting the following: Federal Energy Regulatory 
    Commission, 888 First Street, NE, Washington, DC 20426, [Attention: 
    Michael Miller, Office of the Chief Information Officer, Phone: (202) 
    208-1415, fax: (202) 273-0873, e-mail: michael.miller@ferc.fed.us].
        For submitting comments concerning the collection of information 
    and the associated burden estimate, please send your comments to the 
    contact listed above and to the Office of Management and Budget, Office 
    of Information and Regulatory Affairs, Washington, DC, 20503. 
    [Attention: Desk Officer for the Federal Energy Regulatory Commission, 
    phone: (202) 395-3087, fax: (202) 395-7285.
    
    IV. Environmental Analysis
    
        The Commission is required to prepare an Environmental Assessment 
    or an Environmental Impact Statement for any action that may have a 
    significant adverse effect on the human environment.24 The 
    Commission has categorically excluded certain actions from these 
    requirements as not having a significant effect on the human 
    environment.25 The actions proposed to be taken here fall 
    within categorical exclusions in the Commission's regulations for rules 
    that are clarifying, corrective, or procedural, for information 
    gathering, analysis, and dissemination, and for sales, exchange, and 
    transportation of natural gas that requires no construction of 
    facilities. 26 Therefore, an environmental assessment is 
    unnecessary and has not been prepared in this rulemaking.
    ---------------------------------------------------------------------------
    
        \24\ Order No. 486, Regulations Implementing the National 
    Environmental Policy Act, 52 FR 47897 (Dec. 17, 1987), FERC Stats. & 
    Regs. Preambles 1986-1990 para. 30,783 (1987).
        \25\ 18 CFR 380.4.
        \26\ See 18 CFR 380.4(a)(2)(ii), 380.4(a)(5), 380.4(a)(27).
    ---------------------------------------------------------------------------
    
    V. Regulatory Flexibility Act Certification
    
        The Regulatory Flexibility Act (RFA) requires agencies to prepare 
    certain statements, descriptions and analyses of proposed rules that 
    will have a significant economic impact on a substantial number of 
    small entities. 27 The Commission is not required to make 
    such analyses if a rule would not have such an effect.28
    ---------------------------------------------------------------------------
    
        \27\ 5 U.S.C. 601-612 (1988).
        \28\ 5 U.S.C. 605(b)(1988).
    ---------------------------------------------------------------------------
    
        The Commission does not believe that this rule would have such an 
    impact on small entities. The majority of complaints filed with the 
    Commission have been by companies who do not meet the RFA's definition 
    of a small entity whether or not they are under the Commission's 
    jurisdiction.29 Further, the Commission is proposing to 
    speed up the complaint process in general and in particular for those 
    cases where small business entities have been the subject of an alleged 
    detriment. This proposed rule will be beneficial to small entities. 
    Therefore, the Commission certifies that this rule will not have a 
    significant economic impact on a substantial number of small entities.
    ---------------------------------------------------------------------------
    
        \29\ 5 U.S.C. 601(3)(1988).
    ---------------------------------------------------------------------------
    
    VI. Comment Procedures
    
        The Commission invites interested persons to submit written 
    comments on the matters and issues proposed in this notice to be 
    adopted, including any related matters or alternative proposals that 
    commenters may wish to discuss. An original and 14 copies of comments 
    must be filed with the Commission no
    
    [[Page 41990]]
    
    later than October 5, 1998. Comments should be submitted to the Office 
    of the Secretary, Federal Energy Regulatory Commission, 888 First 
    Street, NE, Washington, DC 20426, and should refer to Docket No. RM98-
    13-000. All written comments will be placed in the Commission's public 
    files and will be available for inspection in the Commission's Public 
    Reference Room at 888 First Street, NE, Washington, DC 20426, during 
    regular business hours.
        Additionally, comments should be submitted electronically. 
    Commenters are encouraged to file comments using Internet E-Mail. 
    Comments should be submitted through the Internet by E-Mail to 
    comment.rm@ferc.fed.us in the following format: on the subject line, 
    specify Docket No. RM98-13-000; in the body of the E-Mail message, 
    specify the name of the filing entity and the name, telephone number 
    and E-Mail address of a contact person; and attach the comment in 
    WordPerfect 6.1 or lower format or in ASCII format as an 
    attachment to the E-Mail message. The Commission will send a reply to 
    the E-Mail to acknowledge receipt. Questions or comments on electronic 
    filing using Internet E-Mail should be directed to Marvin Rosenberg at 
    202-208-1283, E-Mail address marvin.rosenberg@ferc.fed.us.
        Commenters also can submit comments on computer diskette in 
    WordPerfect 6.1 or lower format or in ASCII format, with 
    the name of the filer and Docket No. RM98-13-000 on the outside of the 
    diskette.
    
    List of subjects
    
    18 CFR Part 1b
    
        Investigations.
    
    18 CFR Part 343
    
        Pipelines, Reporting and recordkeeping requirements.
    
    18 CFR Part 385
    
        Administrative practice and procedure, Electric power, Penalties, 
    Pipelines, Reporting and recordkeeping requirements.
    
        By direction of the Commission.
    David P. Boergers,
    Acting Secretary.
    
        In consideration of the foregoing, the Commission proposes to amend 
    Parts 1b, 343, and 385, Chapter I, Title 18, Code of Federal 
    Regulations, as set forth below.
    
    PART 1b--RULES RELATING TO INVESTIGATIONS
    
        1. The authority citation for part 1b is amended to read as 
    follows:
    
        Authority: 15 U.S.C. 717 et seq.; 16 U.S.C. 792 et seq.; 49 
    U.S.C. 60502; 49 App. U.S.C. 1-85; 42 U.S.C. 7101-7352; E.O. 12009, 
    42 FR 46267.
    
        2. In Sec. 1b.1, new paragraph (d) is added to read as follows:
    * * * * *
        (d) Enforcement Hotline is a forum in which to address quickly and 
    informally any matter within the Commission's jurisdiction concerning 
    natural gas pipelines, oil pipelines, electric utilities and 
    hydroelectric projects.
        3. In part 1b, new section 1b.21 is added to read as follows:
    
    
    Sec. 1b.21  Enforcement Hotline.
    
        (a) The Hotline Staff may provide information to the public and 
    give informal staff opinions. The opinions given are not binding on the 
    General Counsel or the Commission.
        (b) Any person may seek information or the informal resolution of a 
    dispute by calling or writing to the Hotline at the telephone number 
    and address in paragraph (f) of this section. The Hotline Staff will 
    informally seek information from the caller and any respondent, as 
    appropriate. The Hotline Staff will attempt to resolve disputes without 
    litigation or other formal proceedings. The Hotline Staff may not 
    resolve matters that are before the Commission in docketed proceedings.
        (c) All information and documents obtained through the Hotline 
    Staff shall be treated as non-public by the Commission and its staff 
    consistent with the provisions of Sec. 1b.9 of this part.
        (d) Calls to the Hotline may be made anonymously.
        (e) Any person who contacts the Hotline is not precluded from 
    filing a formal action with the Commission if discussions are 
    unsuccessful at resolving the matter. A caller may terminate use of the 
    Hotline procedure at any time.
        (f) The Hotline may be reached by calling (202) 208-1390 or toll 
    free (877) 303-4340 or writing to: Enforcement Hotline, Federal Energy 
    Regulatory Commission, 888 First Street, N.E. Washington, D.C. 20426.
    
    PART 343--PROCEDURAL RULES APPLICABLE TO OIL PIPELINE PROCEEDINGS
    
        1. The authority citation for part 343 continues to read as 
    follows:
    
        Authority: 5 U.S.C. 571-583; 42 U.S.C. 7101-7352; 49 U.S.C. 
    60502; 49 App. U.S.C. 1-85.
    
        2. In Sec. 343.2 paragraph (c)(3) is revised to read as follows:
    
    
    Sec. 343.2  Requirements for filing interventions, protests and 
    complaints.
    
    * * * * *
        (c) * * *
        (3) Non-rate matters. A protest or complaint filed against a 
    carrier's operations or practices, other than rates, must allege 
    reasonable grounds for asserting that the operations or practices 
    violate a provision of the Interstate Commerce Act, or of the 
    Commission's regulations. In addition to meeting the requirements of 
    this paragraph, a complaint must also comply with the requirements of 
    Rule 206.
    * * * * *
        3. In Sec. 343.4 paragraph (a) is revised to read as follows:
    
    
    Sec. 343.4  Procedures on complaints.
    
        (a) Responses. The carrier must file an answer to a complaint filed 
    pursuant to section 13(1) of the Interstate Commerce Act within 10 days 
    after the filing of the complaint in accordance with Rule 206.
    * * * * *
    
    PART 385--RULES OF PRACTICE AND PROCEDURE
    
        1. The authority citation for part 385 continues to read as 
    follows:
    
        Authority: 5 U.S.C. 551-557; 15 U.S.C. 717-717z, 3301-3432; 16 
    U.S.C. 791a-825r, 2601-2645; 31 U.S.C. 9701; 42 U.S.C. 7101-7352; 49 
    U.S.C. 60502; 49 App. U.S.C. 1-85.
    
        2. In Sec. 385.206, existing paragraph (b) is redesignated 
    paragraph (e) and is revised, existing paragraph (c) is redesignated 
    paragraph (g), and new paragraphs (b), (c), (d), and (f) are added to 
    read as follows:
    
    
    Sec. 385.206  Complaints (Rule 206).
    
    * * * * *
        (b) Contents. A complaint must:
        (1) Clearly identify the action or inaction which is alleged to be 
    unjust, unreasonable, unduly discriminatory or preferential, or 
    otherwise unlawful, or is contrary to a certificate or license 
    condition, a tariff provision, or the terms of an exemption;
        (2) Provide an explanation of the reasons why the action or 
    inaction is unjust, unreasonable, unduly discriminatory or 
    preferential, or otherwise unlawful, or is contrary to a certificate or 
    license condition, a tariff provision, or the terms of an exemption;
        (3) Set forth the business, commercial, economic or other issues 
    presented by the action or inaction, service or practice as such relate 
    to or affect the complainant, or, where applicable, the environmental 
    or safety issues presented by the action or inaction;
        (4) Quantify the financial impact or burden (if any) created for 
    the
    
    [[Page 41991]]
    
    complainant as a result of the action or inaction, or, where 
    applicable, the environmental or safety impacts of the action or 
    inaction;
        (5) Indicate the practical and operational impacts imposed upon the 
    complainant as a result of the action or inaction, or, where 
    applicable, the environmental or safety impacts of the action or 
    inaction;
        (6) State whether the issues presented are pending in an existing 
    Commission proceeding or a proceeding in any other forum in which the 
    complainant is a party, and if so, provide an explanation why timely 
    resolution cannot be achieved in that forum;
        (7) State the specific relief, including interim relief to preserve 
    the status quo, or remedy requested, and in cases seeking interim 
    relief, a detailed explanation of why such relief is required 
    addressing:
        (i) The likelihood of success on the merits;
        (ii) The nature and extent of the harm if interim relief is denied;
        (iii) The balance of the relevant interests, i.e., the hardship to 
    nonmovant if interim relief is granted contrasted with the hardship to 
    the movant if interim relief is denied; and
        (iv) The effect, if any, of the decision on the public interest;
        (8) Include all documents that support the facts in the complaint, 
    including, but not limited, to contracts, affidavits, and testimony;
        (9) State:
        (i) Whether the Enforcement Hotline or other informal procedures 
    were used;
        (ii) Whether the complainant believes that alternative dispute 
    resolution (ADR) under the Commission's supervision could successfully 
    resolve the complaint;
        (iii) What types of ADR procedures could be used; and
        (iv) Describe any process that has been agreed on for resolving the 
    complaint.
        (c) Service. Any person filing a complaint must serve a copy of the 
    complaint on the respondent and others the complainant knows will be 
    affected simultaneously with filing at the Commission and must so 
    affirm in the complaint. Simultaneous service can be accomplished 
    through electronic mail, fax, express delivery, or messenger.
        (d) Notice. A public notice of the complaint will be issued.
        (e) Answers, interventions and comments. (1) Unless otherwise 
    ordered by the Commission, any respondent to a complaint must file an 
    answer with the Commission within 10 days after the complaint is filed.
        (2) Interventions and comments are also due within 10 days after 
    the complaint is filed.
        (f) Complaint resolution procedures. One of the following 
    procedures may be used to resolve complaints:
        (1) The Commission may issue an order on the merits based upon the 
    pleadings;
        (2) In cases where the affected parties consent, the Commission may 
    assign a case to be resolved through alternative dispute resolution 
    procedures in accordance with Secs. 385.603 through 385.606; or
        (3) The Commission may convene a conference or establish a hearing, 
    including an expedited hearing, before an ALJ.
        3. In Sec. 385.213 paragraph (c)(4) is added to read as follows:
    
    
    Sec. 385.213  Answers (Rule 213).
    
    * * * * *
        (c) * * *
        (4) An answer to a complaint must include all documents that 
    support the facts in the answer, including, but not limited to, 
    contracts, affidavits and testimony.
    * * * * *
        4. In Sec. 385.604, paragraph (d)(3) is removed, paragraphs (d)(4), 
    (d)(5), and (d)(6) are redesignated paragraphs (d)(3), (d)(4), and 
    (d)(5), paragraph (g) is removed, and paragraph (d)(2) is revised to 
    read as follows:
    
    
    Sec. 385.604  Alternative means of dispute resolution (Rule 604).
    
    * * * * *
        (d) * * *
        (2) For matters set for hearing under subpart E of this part, a 
    proposal to use alternative means of dispute resolution must be filed 
    with the presiding administrative law judge.
    * * * * *
        5. In Sec. 385.605, paragraph (f) is removed, and paragraphs (a)(4) 
    and (e)(2) are revised to read as follows:
    
    
    Sec. 385.605  Arbitration (Rule 605).
    
        (a) * * *
        (4) An arbitration proceeding under this rule may be monitored as 
    provided in Rule 604(f).
    * * * * *
        (e) * * *
        (2) The award in an arbitration proceeding will become final 30 
    days after it is served on all parties.
    * * * * *
        6. In Sec. 385.606 paragraph (d) is redesignated paragraph (d)(1) 
    and paragraphs (d)(2) and (l) are added:
    
    
    Sec. 385.606  Confidentiality in dispute resolution proceedings (Rule 
    606).
    
    * * * * *
        (d) * * *
        (2) To qualify for the exemption established under paragraph (l) of 
    this section, an alternative confidential procedure under this 
    paragraph may not provide for less disclosure than confidential 
    procedures otherwise provided under this rule.
    * * * * *
        (l) A dispute resolution communication that may not be disclosed 
    under this rule shall also be exempt from disclosure under 5 U.S.C. 
    552(b)(3).
    
    [FR Doc. 98-20997 Filed 8-5-98; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
08/06/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Proposed Rule
Action:
Notice of Proposed Rulemaking.
Document Number:
98-20997
Dates:
Comments are due October 5, 1998.
Pages:
41982-41991 (10 pages)
Docket Numbers:
Docket No. RM98-13-000
PDF File:
98-20997.pdf
CFR: (8)
18 CFR 1b.21
18 CFR 343.2
18 CFR 343.4
18 CFR 385.206
18 CFR 385.213
More ...