E8-13533. Commission Information Collection Activities, Proposed Collection; Comment Request; Submitted for OMB Review
-
Start Preamble
June 10, 2008.
AGENCY:
Federal Energy Regulatory Commission.
ACTION:
Notice.
SUMMARY:
In compliance with the requirements of section 3507 of the Paperwork Reduction Act of 1995, 44 U.S.C. 3507, the Federal Energy Regulatory Commission (Commission) has submitted the information collection described below to the Office of Management and Budget (OMB) for review of this information collection requirement. Any interested person may file comments directly with OMB and should address a copy of those comments to the Commission as explained below. The Commission received no comments in response to an earlier Federal Register notice of March 13, 2008 (73 FR 13536-13537), and has made this notation in its submission to OMB.
DATES:
Comments on the collection of information are due by July 10, 2008.
ADDRESSES:
Address comments on the collection of information to the Office of Management and Budget, Office of Information and Regulatory Affairs, Attention: Federal Energy Regulatory Commission Desk Officer. Comments to OMB should be filed electronically, c/o oira_submission@omb.eop.gov and include the OMB Control No. (1902-0073) as a point of reference. The Desk Officer may be reached by telephone at 202-395-7345. A copy of the comments should also be sent to the Federal Energy Regulatory Commission, Office of the Executive Director, ED-34, Attention: Michael Miller, 888 First Street, NE., Washington, DC 20426. Comments may be filed either in paper format or electronically. Those persons filing electronically do not need to make a paper filing. For paper filings, such comments should be submitted to the Secretary of the Commission, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426 and should refer to Docket No. IC08-512-001. Documents filed electronically via the Internet must be prepared in an acceptable filing format and in compliance with the Federal Energy Regulatory Commission submission guidelines. Complete filing instructions and acceptable filing formats are available at (http://www.ferc.gov/help/submission-guide/electronic-media.asp). To file the document electronically, access the Commission's Web site and click on Documents & Filing, E-Filing (http://www.ferc.gov/docs-filing/efiling.asp), and then follow the instructions for each screen. First time users will have to establish a user name and password. The Commission will send an automatic acknowledgement to the sender's e-mail address upon receipt of comments.
All comments may be viewed, printed or downloaded remotely via the Internet through FERC's homepage using the “eLibrary” link. For user assistance, contact fercolinesupport@ferc.gov or toll-free at (866) 208-3676 or for TTY, contact (202) 502-8659.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Michael Miller may be reached by telephone at (202) 502-8415, by fax at (202) 273-0873, and by e-mail at michael.miller@ferc.gov.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Abstract: The information collected under the requirements of FERC-512, “Application for Preliminary Permit” (OMB No. 1902-0073) is used by the Commission to implement the statutory provisions of sections 4(f), 5 and 7 of the Federal Power Act (FPA), 16 U.S.C. sections 797, 798 & 800. The purpose of obtaining a preliminary permit is to maintain priority of the application for a license for a hydropower facility while the applicant conducts surveys to prepare maps, plans, specifications and estimates; conducts engineering, economic and environmental feasibility studies; and making financial arrangements. The conditions under which the priority will be maintained are set forth in each permit. During the term of the permit, no other application for a preliminary permit or application for a license submitted by another party can be accepted. The term of the permit is three years. The information collected under the designation FERC-512 is in the form of a written application for a preliminary permit which is used by Commission staff to determine an applicant's qualifications to hold a preliminary permit, review the proposed hydro development for feasibility and to issue a notice of the application in order to solicit public and agency comments. The Commission implements these mandatory filing requirements in the Code of Federal Regulations (CFR) under 18 CFR 4.31-33, 4.81-.83.
Action: The Commission is requesting a three-year extension of the current expiration date, with no changes to the existing collection of data.
Burden Statement: Public reporting burden for this collection is estimated as:
Start Printed Page 34281No. of respondents Annual responses per respondent Average burden hours per response Total annual burden hours (1) (2) (3) (1) × (2) × (3) 200 1 37 7,400 Estimated cost burden to respondents is $508,000; (i.e., 7 hours @$200 an hour (legal) + 30 hours @$39 an hour (technical) × 200) per year equals $514,000).
The reporting burden includes the total time, effort, or financial resources expended to generate, maintain, retain, or disclose or provide the information including: (1) Reviewing instructions; (2) developing, acquiring, installing, and utilizing technology and systems for the purposes of collecting, validating, verifying, processing, maintaining, disclosing and providing information; (3) adjusting the existing ways to comply with any previously applicable instructions and requirements; (4) training personnel to respond to a collection of information; (5) searching data sources; (6) completing and reviewing the collection of information; and (7) transmitting, or otherwise disclosing the information.
The estimate of cost for respondents is based upon salaries for professional and clerical support, as well as direct and indirect overhead costs. Direct costs include all costs directly attributable to providing this information, such as administrative costs and the cost for information technology. Indirect or overhead costs are costs incurred by an organization in support of its mission. These costs apply to activities which benefit the whole organization rather than anyone particular function or activity.
Comments are invited on: (1) Whether the proposed collection of information is necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency's estimate of the burden of the proposed collection of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information to be collected; and (4) ways to minimize the burden of the collection of information on those who are to respond, including the use of appropriate automated, electronic, mechanical, or other technological collection techniques or other forms of information technology, e.g., permitting electronic submission of responses.
Start SignatureKimberly D. Bose,
Secretary.
[FR Doc. E8-13533 Filed 6-16-08; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Comments Received:
- 0 Comments
- Published:
- 06/17/2008
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Action:
- Notice.
- Document Number:
- E8-13533
- Dates:
- Comments on the collection of information are due by July 10, 2008.
- Pages:
- 34280-34281 (2 pages)
- Docket Numbers:
- Docket No. IC08-512-001, FERC-512
- EOCitation:
- of 2008-06-10
- PDF File:
- e8-13533.pdf