E9-11792. Hydro Energy Technologies, LLC; Notice of Preliminary Permit Applications Accepted for Filing and Soliciting Comment, Motions To Intervene, and Competing Applications  

  • Start Preamble May 13, 2009.

    On May 5, 2009, Hydro Energy Technologies, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Pleasant Hill Hydroelectric Project, to be located on the Clear Fork of Mohican River, in Ashland County, Ohio.

    The proposed Pleasant Hill Hydroelectric Project would be located at: (1) The existing U.S. Army Corps of Engineers 775-foot-long, 113-foot-high Pleasant Hill Dam; and (2) an existing 2,600-acre reservoir with a normal water surface elevation of 1,020 feet mean sea level.

    The proposed project would consist of: (1) A new powerhouse containing a single turbine generating unit with an installed capacity of 1.5 megawatts; (2) a new 200-foot-long, 60-inch-diameter penstock; (3) a new switchyard; (4) a new 1-mile-long, 25-kilovolt transmission line; and (5) appurtenant facilities. The Pleasant Hill Project would have an estimated average annual generation of 5.4 gigawatt-hours, which would be sold to a local utility.

    Applicant Contact: Mr. Anthony J. Marra Jr., President, Hydro Energy Technologies, LLC, 31300 Solon Rd. Suite 12, Solon, OH 44139, (440) 498-1000.

    FERC Contact: John Ramer, (202) 502-8969.

    Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the “e-Filing” link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission's Web site located at http://Start Printed Page 23848www.ferc.gov/​filing-comments.asp. More information about this project can be viewed or printed on the “eLibrary” link of Commission's Web site at http://www.ferc.gov/​docs-filing/​elibrary.asp. Enter the docket number (P-13463) in the docket number field to access the document. For assistance, call toll-free 1-866-208-3372.

    Start Signature

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. E9-11792 Filed 5-20-09; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Comments Received:
0 Comments
Published:
05/21/2009
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
E9-11792
Pages:
23847-23848 (2 pages)
Docket Numbers:
Project No. 13463-000
EOCitation:
of 2009-05-13
PDF File:
e9-11792.pdf