-
Start Preamble
July 1, 2009.
In accordance with the National Environmental Policy Act (NEPA) of 1969 and the Federal Energy Regulatory Commission's (Commission) regulations, 18 CFR part 380 (Order No. 486, 52 FR 47879), the Office of Energy Projects has reviewed the application for a new major license for the Start Printed Page 32910Packwood Lake Hydroelectric Project (project), located on Lake Creek in Lewis County, Washington, and has prepared a final Environmental Assessment (EA). In the final EA, Commission staff analyze the potential environmental effects of licensing the project and conclude that issuing a license for the project, with appropriate environmental measures, would not constitute a major federal action significantly affecting the quality of the human environment.
A copy of the final EA is on file with the Commission and is available for public inspection. The final EA may also be viewed on the Commission's Web site at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659.
Start SignatureKimberly D. Bose,
Secretary.
[FR Doc. E9-16161 Filed 7-8-09; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Comments Received:
- 0 Comments
- Published:
- 07/09/2009
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- E9-16161
- Pages:
- 32909-32910 (2 pages)
- Docket Numbers:
- Project No. 2244-022
- EOCitation:
- of 2009-07-01
- PDF File:
- e9-16161.pdf