E9-20712. Annual Materials Report on New Bridge Construction and Bridge Rehabilitation  

  • Start Preamble

    AGENCY:

    Federal Highway Administration (FHWA), DOT.

    Start Printed Page 44438

    ACTION:

    Notice.

    SUMMARY:

    Section 1114 of the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) (Pub. L. 109-59; 119 Stat. 1144) continued the highway bridge program to enable States to improve the condition of their highway bridges over waterways, other topographical barriers, other highways, and railroads. Section 1114(f) amended 23 United State Code (U.S.C.) 144 by adding subsection (r), requiring the Secretary of Transportation to publish in the Federal Register a report describing construction materials used in new Federal-aid bridge construction and bridge rehabilitation projects. As part of the SAFETEA-LU Technical Corrections Act of 2008 (Pub. L. 110-244), 23 U.S.C. 144 subsection (r) became subsection (q), but the reporting requirement remained the same.

    ADDRESSES:

    The report is posted on the FHWA Web site at: http://www.fhwa.dot.gov/​bridge/​britab.htm.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Ms. Ann Shemaka, Office of Bridge Technology, HIBT-30, (202) 366-1575, or Mr. Thomas Everett, Office of Bridge Technology, HIBT-30, (202) 366-4675, Federal Highway Administration, 1200 New Jersey Ave., SE., Washington, DC 20590. Office hours are from 7:45 a.m. to 4:15 p.m., e.t., Monday through Friday, except Federal holidays.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    In conformance with 23 U.S.C. 144(q), the FHWA has produced a report that summarizes the types of construction materials used in new bridge construction and bridge rehabilitation projects. Data on Federal-aid and non-Federal-aid highway bridges are included in the report for completeness. The December 2008 National Bridge Inventory (NBI) dataset was used to identify the material types for bridges that were new or replaced within the defined time period. The FHWA's Financial Management Information System and the 2008 NBI were used to identify the material types for bridges that were rehabilitated within the defined time period. Currently preventative maintenance projects are included in the rehabilitation totals.

    The report, which is available at http://www.fhwa.dot.gov/​bridge/​britab.htm,, consists of the following tables:

    • Construction Materials for New and Replaced Bridges, a summary report which includes Federal-aid highways and non-Federal-aid highways built in 2007 and 2006.
    • Construction Materials for Rehabilitated Bridges, a summary report which includes Federal-aid and non-Federal-aid highways rehabilitated in 2007 and 2006.
    • Construction Materials for Combined New, Replaced and Rehabilitated Bridges, a summary report which combines the first two tables cited above.
    • Federal-aid Highways: Construction Materials for New and Replaced Bridges 2007, a detailed State-by-State report with counts and areas for Federal-aid bridges built or replaced in 2007.
    • Federal-aid Highways: Construction Materials for New and Replaced Bridges 2006, a detailed State-by-State report with counts and areas for Federal-aid bridges built or replaced in 2006.
    • Non-Federal-aid Highways: Construction Materials for New and Replaced Bridges 2007, a detailed State-by-State report with counts and areas for non-Federal-aid bridges built or replaced in 2007.
    • Non-Federal-aid Highways: Construction Materials for New and Replaced Bridges 2006, a detailed State-by-State report with counts and areas for non-Federal-aid bridges built or replaced in 2006.
    • Federal-aid Highways: Construction Materials for Rehabilitated Bridges 2007, a detailed State-by-State report with counts and areas for Federal-aid bridges rehabilitated in 2007.
    • Federal-Aid Highways: Construction Materials for Rehabilitated Bridges 2006, a detailed State-by-State report with counts and areas for Federal-aid bridges rehabilitated in 2006.
    • Non-Federal-aid Highways: Construction Materials for Rehabilitated Bridges 2007, a detailed State-by-State report with counts and areas for non-Federal-aid bridges rehabilitated in 2007.
    • Non-Federal-aid Highways: Construction Materials for Rehabilitated Bridges 2006, a detailed State-by-State report with counts and areas for non-Federal-aid bridges rehabilitated in 2006.
    • Federal-aid Highways: Construction Materials for New, Replaced and Rehabilitated Bridges 2007, which combines the 2007 reports on new, replaced and rehabilitated Federal-aid bridges.
    • Federal-aid Highways: Construction Materials for New, Replaced and Rehabilitated Bridges 2006, which combines the 2006 reports on new, replaced and rehabilitated Federal-aid bridges.
    • Non-Federal-aid Highways: Construction Materials for New, Replaced and Rehabilitated Bridges 2007, which combines the 2007 reports on new, replaced and rehabilitated non-Federal-aid bridges.
    • Non-Federal-aid Highways: Construction Materials for New Replaced and Rehabilitated Bridges 2006, which combines the 2006 reports on new, replaced and rehabilitated non-Federal-aid bridges.

    The tables provide data for 2 years: 2006 and 2007. The 2006 data is considered complete for new, replaced and rehabilitated bridges, with a minimal likelihood of upward changes in the totals. The 2007 data is considered partially complete for new bridges and complete for rehabilitated bridges, because many new bridges built in 2007 will not appear in the NBI until they are placed into service the following year. Therefore, next year's report will include 2007's data on new bridge construction, because the data will be complete.

    Each table displays simple counts of bridges and total bridge deck area. Total bridge deck area is measured in square meters, by multiplying the bridge length by the deck width out-to-out. Culverts under fill are included in the counts but not in the areas because a roadway width is not collected. The data is categorized by the following material types, which are identified in the NBI: Steel, concrete, pre-stressed concrete, and other. The category “other” includes wood, timber, masonry, aluminum, wrought iron, cast iron, and other. Material type is the predominate type for the main span(s).

    (Authority: 23 U.S.C. 144(q); Sec. 1114(f), Pub. L. 109-59, 119 Stat. 1144)

    Start Signature

    Issued on: August 19, 2009.

    Victor M. Mendez,

    Federal Highway Administrator.

    End Signature End Supplemental Information

    [FR Doc. E9-20712 Filed 8-27-09; 8:45 am]

    BILLING CODE 4910-22-P

Document Information

Comments Received:
0 Comments
Published:
08/28/2009
Department:
Federal Highway Administration
Entry Type:
Notice
Action:
Notice.
Document Number:
E9-20712
Pages:
44437-44438 (2 pages)
PDF File:
e9-20712.pdf