Comment from DEAN SWANZY, PETROBRAS AMERICA

Document ID: BOEM-2010-0034-0006
Document Type: Public Submission
Agency: Bureau Of Ocean Energy Management, Regulation, And Enforcement
Received Date: November 01 2010, at 12:00 AM Eastern Daylight Time
Date Posted: November 2 2010, at 12:00 AM Eastern Standard Time
Comment Start Date: October 14 2010, at 12:00 AM Eastern Standard Time
Comment Due Date: December 13 2010, at 11:59 PM Eastern Standard Time
Tracking Number: 80b7d7bb
View Document:  View as format xml

View Comment

PLEASE SEE THE TWO QUESTIONS BELOW - CLARIFICATION NEEDS TO TAKE PLACE CONCERNING § 250.420 What well casing and cementing requirements must I meet? (b) * * * (3) For the final casing string (or liner if it is your final string), you must install dual mechanical barriers in addition to cement, to prevent flow in the event of a failure in the cement. These may include dual float valves, or one float valve and a mechanical barrier. You must submit documentation to BOEMRE 30 days after installation of the dual mechanical barriers. Question : Does the dual mechanical barrier requirement apply to just the inside of the casing or to both the inside and annulus flow paths ? We believe you are meaning the inside only. CONCERNINIG § 250.423 What are the requirements for pressure testing casing? (c) You must perform a negative pressure test on all wells to ensure proper casing installation. You must perform this test for the intermediate and production casing strings. Question : What is the definition of intermediate casing? The rule states a negative pressure test is required for intermediate and production casing. If drilling liners are set below intermediate casing is additional negative testing required ?

Related Comments

    View All
Total: 36
Jean Public 10-17-10
Public Submission    Posted: 10/19/2010     ID: BOEM-2010-0034-0005

Dec 13,2010 11:59 PM ET
Comment from DEAN SWANZY, PETROBRAS AMERICA
Public Submission    Posted: 11/02/2010     ID: BOEM-2010-0034-0006

Dec 13,2010 11:59 PM ET
Comment from Marc Young, PE, Self
Public Submission    Posted: 11/05/2010     ID: BOEM-2010-0034-0007

Dec 13,2010 11:59 PM ET
Comment from Marc Young, PE 11-8-10
Public Submission    Posted: 11/08/2010     ID: BOEM-2010-0034-0008

Dec 13,2010 11:59 PM ET
Comment from Ted Tupper, Self
Public Submission    Posted: 11/10/2010     ID: BOEM-2010-0034-0009

Dec 13,2010 11:59 PM ET