2012-07-16 Joint response to NOPR strongly urging DOE to conduct additional analysis to allow the Department to determine the standard levels that represent the maximum levels that are technologically feasible and economically justified.

Document ID: EERE-2008-BT-STD-0005-0162
Document Type: Public Submission
Agency: Energy Efficiency And Renewable Energy Office
Received Date: July 16 2012, at 12:00 AM Eastern Daylight Time
Date Posted: July 17 2012, at 12:00 AM Eastern Standard Time
Comment Start Date: June 29 2012, at 12:00 AM Eastern Standard Time
Comment Due Date: July 16 2012, at 11:59 PM Eastern Standard Time
Tracking Number: 8109de81
View Document:  View as format xml

View Comment

See attached file(s)

Attachments:

20120716 Joint ASAP, ASE, ACEEE, CFA, NASEO, NRDC, NEEP, and NEEA Comment

Title:
20120716 Joint ASAP, ASE, ACEEE, CFA, NASEO, NRDC, NEEP, and NEEA Comment

View Attachment: View as format pdf

Related Comments

    View All
Total: 10
2012-07-10 Response to published NOPR.
Public Submission    Posted: 07/17/2012     ID: EERE-2008-BT-STD-0005-0156

Jul 16,2012 11:59 PM ET
2012-07-13 Response to published NOPR.
Public Submission    Posted: 07/17/2012     ID: EERE-2008-BT-STD-0005-0157

Jul 16,2012 11:59 PM ET
2012-07-16 Response to NOPR recommending that DOE revise its cost effectiveness analysis to support higher CSL’s for the product classes 2‐6.
Public Submission    Posted: 07/17/2012     ID: EERE-2008-BT-STD-0005-0158

Jul 16,2012 11:59 PM ET
2012-07-16 Response to NOPR urging DOE consideration of important issues.
Public Submission    Posted: 07/17/2012     ID: EERE-2008-BT-STD-0005-0160

Jul 16,2012 11:59 PM ET
2012-07-16 Joint response to NOPR recommending swift action to finalize the battery charger standards for product classes 2 through 4.
Public Submission    Posted: 07/17/2012     ID: EERE-2008-BT-STD-0005-0161

Jul 16,2012 11:59 PM ET