2009-09-23 Submitter Information

Document ID: EERE-2008-BT-TP-0017-0023
Document Type: Public Submission
Agency: Energy Efficiency And Renewable Energy Office
Received Date: September 23 2009, at 12:00 AM Eastern Daylight Time
Date Posted: January 27 2011, at 12:00 AM Eastern Standard Time
Comment Start Date: July 14 2009, at 12:00 AM Eastern Standard Time
Comment Due Date: September 23 2009, at 11:59 PM Eastern Standard Time
Tracking Number: 80a4113d
View Document:  View as format xml

Attachments:

2009-09-23 Comment discussing the sampling procedure for metal halide ballasts and measurement standards for the Power Line Carrier Control Signal

Title:
2009-09-23 Comment discussing the sampling procedure for metal halide ballasts and measurement standards for the Power Line Carrier Control Signal

View Attachment: View as format pdf

Related Comments

   
Total: 2
2009-09-23 Submitter Information
Public Submission    Posted: 01/27/2011     ID: EERE-2008-BT-TP-0017-0023

Sep 23,2009 11:59 PM ET
2009-09-23 Submitter Information
Public Submission    Posted: 01/27/2011     ID: EERE-2008-BT-TP-0017-0024

Sep 23,2009 11:59 PM ET