Japan Airlines

Document ID: FAA-2007-29110-0004
Document Type: Public Submission
Agency: Federal Aviation Administration
Received Date: December 10 2007, at 10:07 AM Eastern Standard Time
Date Posted: December 10 2007, at 12:00 AM Eastern Standard Time
Comment Start Date: October 10 2007, at 12:00 AM Eastern Standard Time
Comment Due Date: December 10 2007, at 11:59 PM Eastern Standard Time
Tracking Number: 80374d19
View Document:  View as format xml

View Comment

In paragraph (e)(2)(ii) in the "Compliance" section in the proposed AD, it is instructed that ====Quote==== (ii) For engines that do not have an ESV before the front turbine hub accumulates 9,370 CSN, remove the front turbine hub from service at the next ESV, or before the hub accumulates an additional 6,000 cycles-since-last high pressure turbine overhaul, whichever occurs first, but not to exceed 12,000 CSN. ====Unquote==== Japan Airlines (JAL) thinks that the terms "last high pressure turbine overhaul" in paragraph (e)(2)(ii) in the "Compliance" section should be clearly defined to comply with this proposed AD properly. JAL believes that "last FPI of the front turbine hub, P/N 53L601" satisfies the FAA's intention for this item, therefore, JAL would like to request FAA to change the terms from "last high pressure turbine overhaul" to "last FPI of the front turbine hub, P/N 53L601" in paragraph (e)(2)(ii) in the "Compliance" section.

Related Comments

   
Total: 5
Boeing Commerical Airplanes
Public Submission    Posted: 11/20/2007     ID: FAA-2007-29110-0002

Dec 10,2007 11:59 PM ET
Pratt & Whitney
Public Submission    Posted: 12/10/2007     ID: FAA-2007-29110-0003

Dec 10,2007 11:59 PM ET
Japan Airlines
Public Submission    Posted: 12/10/2007     ID: FAA-2007-29110-0004

Dec 10,2007 11:59 PM ET
Air Transport Association
Public Submission    Posted: 12/11/2007     ID: FAA-2007-29110-0005

Dec 10,2007 11:59 PM ET
U.S. DOT/FAA - See Attachments
Public Submission    Posted: 08/11/2008     ID: FAA-2007-29110-0006

Dec 10,2007 11:59 PM ET