•Regarding Docket No. FAA-2008-1131; Directorate Identifier 2008-NE-37-AD.
•NPRM for AD implementation of PW2000 series engines
• FAA Proposed action:
“We have evaluated all pertinent information and identified an
unsafe condition that is likely to exist or develop on other products
of this same type design. We are proposing this AD, which would require
performing an FPI of the hub for cracks and an OCI of the blade retention slots on
the forward and aft sides of the HPT 2nd stage hub for conformance to dimensional
tolerances at the next HPT overhaul after the effective date of this AD.”
• FAA Summary of requirement;
You are responsible for having the actions required by this
AD performed at the next HPT overhaul, unless the actions have
already been done.
• FedEx Fleet Impact:
None, FedEx fleet of PW2000/757 aircraft will follow the Boeing AMM and Pratt &
Whitney Engine Manual for required maintenance and performance specifications.
At Next Engine Shop visit and HPT is dis-assembled to piece part level the AD will
be complied with.
FedEx
This is comment on Rule
Airworthiness Directives; Pratt and Whitney (PW) Models PW2037, PW2037(M), and PW2040 Turbofan Engines
View Comment
Related Comments
View AllPublic Submission Posted: 12/01/2008 ID: FAA-2008-1131-0002
Jan 13,2009 11:59 PM ET
Public Submission Posted: 01/14/2009 ID: FAA-2008-1131-0005
Jan 13,2009 11:59 PM ET
Public Submission Posted: 01/14/2009 ID: FAA-2008-1131-0006
Jan 13,2009 11:59 PM ET
Public Submission Posted: 03/12/2009 ID: FAA-2008-1131-0007
Jan 13,2009 11:59 PM ET
Public Submission Posted: 01/08/2009 ID: FAA-2008-1131-0003
Jan 13,2009 11:59 PM ET