Nicolas Cordeau

Document ID: FAA-2009-0433-0003
Document Type: Public Submission
Agency: Federal Aviation Administration
Received Date: May 18 2009, at 11:36 AM Eastern Daylight Time
Date Posted: May 19 2009, at 12:00 AM Eastern Standard Time
Comment Start Date: May 13 2009, at 12:00 AM Eastern Standard Time
Comment Due Date: June 12 2009, at 11:59 PM Eastern Standard Time
Tracking Number: 8099c77c
View Document:  View as format xml

View Comment

Docket No. FAA-2009-0433; Directorate Identifier 2009-NM-003-AD; AD 2009-10-07 Good Morning, With ref to the above mentioned FAA AD issued against Airbus A380 - Flap Track Fairing #6, I have the following comments for which I need your advise: Paragraph 3 states (a) the required action in case of findings and (b) the repetitive inspection requirement ---QUOTE--- (3) If any cracking or delamination is found during any inspection required by paragraph (f)(1) or (f)(2) of this AD, before further flight, replace the MFTF6 with a new or serviceable part, in accordance with the Accomplishment Instructions of Airbus Service Bulletin A380-57-8014, dated November 21, 2008, and repeat the inspections specified in paragraph (f)(1) of this AD at the applicable time defined in paragraph (f)(2) of this AD. ---UNQUOTE--- About the repetitive inspection requirements after fairings being replaced, I understand that operators have to repeat inspection of (f)(1) at time specified in (f) (2), that is to say at intervals (50 FC or 10 FC) when it should be repeat inspections at threshold (500FC or 100FC). If my understanding is correct, there might be a need to amend the AD. Best regards Nicolas CORDEAU Continued Airworthiness Engineer A380 Certification - EAN AIRBUS Central Entity Phone: +33 (0)5 62 11 02 53 Fax: +33 (0)5 62 11 03 07 Mailto:nicolas.cordeau@airbus.com

Related Comments

   
Total: 1
Nicolas Cordeau
Public Submission    Posted: 05/19/2009     ID: FAA-2009-0433-0003

Jun 12,2009 11:59 PM ET