Southwest Airlines

Document ID: FAA-2009-0788-0005
Document Type: Public Submission
Agency: Federal Aviation Administration
Received Date: October 30 2009, at 12:00 AM Eastern Daylight Time
Date Posted: October 30 2009, at 12:00 AM Eastern Standard Time
Comment Start Date: September 15 2009, at 12:00 AM Eastern Standard Time
Comment Due Date: October 30 2009, at 11:59 PM Eastern Standard Time
Tracking Number: 80a4e8b9
View Document:  View as format xml

View Comment

Paragraph (i) states "Installing an external repair doubler along the chem-milled steps at stringers S-1 and S-2 right, between STA 827 and STA 847, constitutes terminating action for the repetitive inspections required by paragraph (g) of this AD for the repaired area only, provided all of the conditions specified in paragraphs (i)(1),(i)(2), and (i)(3) of this AD are met. The initial inspection required by paragraph (g) of this AD must be accomplished. (1) The repair is installed after September 3, 2009; (2) The repair was approved by the FAA or by a Boeing Company Authorized Representative who was authorized by the FAA to make such findings; and (3) The repair extends a minimum of three rows of fasteners on each side of the chem-mill line in the circumferential direction." We request that Condition (i)(1) be eliminated to allow repairs installed prior to September 3, 2009 meeting the conditions per (i)(2) and (1)(3) be terminating action for the inspections per (g).

Related Comments

   
Total: 3
Attached
Public Submission    Posted: 10/30/2009     ID: FAA-2009-0788-0004

Oct 30,2009 11:59 PM ET
Southwest Airlines
Public Submission    Posted: 10/30/2009     ID: FAA-2009-0788-0005

Oct 30,2009 11:59 PM ET
Boeing Commerical Airplane
Public Submission    Posted: 10/21/2009     ID: FAA-2009-0788-0003

Oct 30,2009 11:59 PM ET