R. L. Vernon

Document ID: FAA-2009-0789-0003
Document Type: Public Submission
Agency: Federal Aviation Administration
Received Date: September 23 2009, at 12:00 AM Eastern Daylight Time
Date Posted: September 23 2009, at 12:00 AM Eastern Standard Time
Comment Start Date: September 21 2009, at 12:00 AM Eastern Standard Time
Comment Due Date: November 5 2009, at 11:59 PM Eastern Standard Time
Tracking Number: 80a29fa3
View Document:  View as format xml

View Comment

Regarding the service information, minor discrepancies exist. Both A310 and A300-600 bulletins imply that configuration 1 inspection is one-time and the other configurations are repetitive [see step 3.B.(1)(b)1 of the SBs]. This is unimportant as the AD mandates the repetitive inspection. However, SB A300-54-6015 R02 paragraph 3.E. Close Up of the Accomplishment Instructions calls for the access panels to be removed, rather than being installed. I suggest that paragraph (f) (1) of the Final Rule be revised to state " ... perform a detailed visual inspection of the pylons 1 and 2 side panels (upper section) at rib 8, in accordance with ** paragraph 3.B. of ** the Accomplishment Instructions of the applicable service bulletin identified in Table 2 of this AD." Respectfully, R Vernon

Related Comments

   
Total: 3
R. L. Vernon
Public Submission    Posted: 09/23/2009     ID: FAA-2009-0789-0003

Nov 05,2009 11:59 PM ET
FedEx Express
Public Submission    Posted: 09/30/2009     ID: FAA-2009-0789-0004

Nov 05,2009 11:59 PM ET
American Airlines
Public Submission    Posted: 11/05/2009     ID: FAA-2009-0789-0005

Nov 05,2009 11:59 PM ET