It is respectfully submitted that having complied with Service Bulletin 150-25-055 the operator (or MRO) cannot know with certainty that the old seals have been removed or if new seals installed are in compliance with flammability requirements because neither the old nor the news seals are identified with a manufacturer's mark on the seal as stated in the SB. These seals are identical in size, shape, texture and color. In this instance it is argued that the new seals should be identifiable for future compliance confirmation by means other than a paper trail coming from the same aircraft manufacturer.
Jim Bynum
This is comment on Rule
Airworthiness Directives; Gulfstream Aerospace LP Model Gulfstream G150 Airplanes
View Comment
Related Comments
Public Submission Posted: 12/23/2009 ID: FAA-2009-1028-0003
Dec 21,2009 11:59 PM ET
Public Submission Posted: 12/23/2009 ID: FAA-2009-1028-0004
Dec 21,2009 11:59 PM ET