Kevin Lorrigan

Document ID: FAA-2013-0478-0002
Document Type: Public Submission
Agency: Federal Aviation Administration
Received Date: June 10 2013, at 12:00 AM Eastern Daylight Time
Date Posted: June 10 2013, at 12:00 AM Eastern Standard Time
Comment Start Date: June 5 2013, at 12:00 AM Eastern Standard Time
Comment Due Date: August 5 2013, at 11:59 PM Eastern Standard Time
Tracking Number: 1jx-85th-wkvz
View Document:  View as format xml

View Comment

1. There should be a provision for credit for actions taken prior to the issue date of the AD. Removal, disassembly, reassembly and reinstallation of the tail rotor housing and slider group performed in accordance with the pertinent part of the relevant Agusta Bollettino Tecnico prior to the issue date of the AD should be treated as acceptable terminating action for the AD and fulfil the requirements of NPRM paragraph (e)(4). 2. The instructions contained in NPRM paragraph (e) pertaining to removal, disassembly, reassembly and reinstallation are not sufficiently clear in their scope and detail. By adding in a statement that the removal, disassembly, reassembly and reinstallation is to be done in accordance with the pertinent part of the relevant Agusta Bollettino Tecnico (i.e. using similar wording to EASA AD 2012-0195-E "Required actions and compliance times" paragraph (5)) the scope and detail of work required would become much clearer.

Related Comments

   
Total: 1
Kevin Lorrigan
Public Submission    Posted: 06/10/2013     ID: FAA-2013-0478-0002

Aug 05,2013 11:59 PM ET