Anonymous - Comments

Document ID: FHWA-2009-0139-0005
Document Type: Public Submission
Agency: Federal Highway Administration
Received Date: May 04 2010, at 12:00 AM Eastern Daylight Time
Date Posted: May 5 2010, at 12:00 AM Eastern Standard Time
Comment Start Date: April 22 2010, at 12:00 AM Eastern Standard Time
Comment Due Date: August 20 2010, at 11:59 PM Eastern Standard Time
Tracking Number: 80ae6870
View Document:  View as format xml

View Comment

Comments: 1. Section 3A.03: Can clarification be provided on the two compliance years. Is 4-years for new installations of lines where none existed, and 6-years for replacement of existing lines? It is not intuitive on why there needs to be two different dates 2. Table 3A-1, Row #1: What's the definition of two-lane roads with centerline markings only? Are intersections where turn lanes exist included in this? Does centerline only mean that edge lines would disqualify a road in this category? 3. Table 3A-1, note B: What's the definition of "continuous roadway lighting"? Does this mean the entire area of the street segment with street lights must be illuminated (and to what levels?) 4. Guidance: How frequent do options A, B, and C need to be conducted? 5. Table 3A-1, note 1: To be consistant with using english units as the standard, all units should be english (units list meters squared as the area).

Related Comments

    View All
Total: 99
Bob Wagar
Public Submission    Posted: 04/26/2010     ID: FHWA-2009-0139-0004

Aug 20,2010 11:59 PM ET
Anonymous - Comments
Public Submission    Posted: 05/05/2010     ID: FHWA-2009-0139-0005

Aug 20,2010 11:59 PM ET
Robert P. LaJeunesse - Comments
Public Submission    Posted: 05/11/2010     ID: FHWA-2009-0139-0006

Aug 20,2010 11:59 PM ET
Anonymous - Comments
Public Submission    Posted: 05/11/2010     ID: FHWA-2009-0139-0007

Aug 20,2010 11:59 PM ET
Joe Bachman - Comments
Public Submission    Posted: 05/26/2010     ID: FHWA-2009-0139-0012

Aug 20,2010 11:59 PM ET