Indiana Department of Transportation - Comments

Document ID: FRA-2011-0007-0010
Document Type: Public Submission
Agency: Federal Railroad Administration
Received Date: November 29 2012, at 12:00 AM Eastern Standard Time
Date Posted: December 3 2012, at 12:00 AM Eastern Standard Time
Comment Start Date: November 16 2012, at 12:00 AM Eastern Standard Time
Comment Due Date: January 31 2013, at 11:59 PM Eastern Standard Time
Tracking Number: 1jw-8297-cl8i
View Document:  View as format xml

View Comment

Two comments Under the existing system the Districts in the state do the highway part of the survey, type it up and submit it to the central state agency. They in turn retype the same information for submission. The retyping is a waste and the need for it should be eliminated in the new system. There should be a place available in the inventory to note if the crossing has a rigid pad (such as asphalt or concrete) either under the railroad ties or under the track ballast. This is important because some road owners pay to have such pads installed since it improves the longevity of the crossing and the long term ride comfort for highway users.

Related Comments

   
Total: 2
Indiana Department of Transportation - Comments
Public Submission    Posted: 12/03/2012     ID: FRA-2011-0007-0010

Jan 31,2013 11:59 PM ET
Bruce F. George - Comments
Public Submission    Posted: 12/28/2012     ID: FRA-2011-0007-0014

Jan 31,2013 11:59 PM ET