SEND YOUR COMMENTS BY MAY 3, 2013
• ONLINE: http://www.regulations.gov and search for Docket ID NRC–2013–0037. Click "Comment Now" to enter your comments.
• MAIL comments to: Cindy Bladey, Chief, Rules, Announcements, and Directives Branch (RADB), Office of Administration, Mail Stop: TWB–05–B01M,
U.S. Nuclear Regulatory Commission, Washington, DC 20555 0001.
• FAX comments:RADB at 301–492–3446
Nuclear Regulatory Commission:
It is important that TVA retire the permits on Sequoyah 1 & 2. The permits are already 10 years past their original (recommended) termination dates. We require that all nuclear material be interred in casks and left on site. Monies must be used to develop safer means of energy harvesting.
These Ice Condenser Reactors are out of date and dangerous. By no means will MOX fuel be made at these Tennessee Plants that are so close to Chattanooga. We look forward to a decline in Leukemia rates after all the spent fuel is in casks.
Thank you for retiring the permits,
Sign here:
Print Name:
Address:
Contact:
P.S. TVA will be required by the citizens of Tennessee to redirect the funds being taken from our electric bills into developing cleaner technology: sun come up solar, passive solar, insulation, smart grid, small wind, slow rivers. There are better ways to turn the wheel of energy generation. This generation will have it their way!
Comment (4) of Jeannie Hacker-Cerulean on FR Doc # 2013-05491
This is comment on Notice
License Renewal Application for Sequoyah Nuclear Plant, Units 1 and 2, Tennessee Valley Authority
View Comment
Related Comments
View AllPublic Submission Posted: 04/26/2013 ID: NRC-2013-0037-0005
May 03,2013 11:59 PM ET
Public Submission Posted: 05/06/2013 ID: NRC-2013-0037-0007
May 03,2013 11:59 PM ET
Public Submission Posted: 05/06/2013 ID: NRC-2013-0037-0008
May 03,2013 11:59 PM ET
Public Submission Posted: 05/23/2013 ID: NRC-2013-0037-0015
May 03,2013 11:59 PM ET
Public Submission Posted: 05/06/2013 ID: NRC-2013-0037-0010
May 03,2013 11:59 PM ET