Document ID: 
Document Type: 
Agency: 
Topics: No Topics associated with this document
View Document:  View as format xml

Details Information

Received Date: April 18 2011, at 12:00 AM Eastern Daylight Time

Attachments:

20110418 Comment citing concerns of the breakdown of analysis as peripheral costs rise, and the projected costs of materials as predicted in the analysis. APPA believes that the projected savings for the higher levels of efficiency might not be justifiable through a cost benefit analysis in the future.

View Attachment: View as format pdf

Comments

Total: 0
No comments posted.

Related Documents

Total: 0
No documents available.