2011-04-18 Comment expressing concerns about impact of higher efficiency transformer designs that will be larger and heavier than current designs, and the impact on the cost and resources required to perform transformer replacements due to pole loading, foundation limitations, vault space constraints, floor loading, and elevator load limitations.
View Attachment:
Title: 2011-04-18 Comment expressing concerns about impact of higher efficiency transformer designs that will be larger and heavier than current designs, and the impact on the cost and resources required to perform transformer replacements due to pole loading, foundation limitations, vault space constraints, floor loading, and elevator load limitations.
Details Information
Attachments:
2011-04-18 Comment expressing concerns about impact of higher efficiency transformer designs that will be larger and heavier than current designs, and the impact on the cost and resources required to perform transformer replacements due to pole loading, foundation limitations, vault space constraints, floor loading, and elevator load limitations.
View Attachment:Comments
Related Documents