Document ID: 
Document Type: 
Agency: 
Topics: No Topics associated with this document
View Document:  View as format xml

Details Information

Document Subtype: Company/Organization Comment
Received Date: August 18 2011, at 12:00 AM Eastern Daylight Time
Page Count: 1

Attachments:

AKRF 2008a - H.A. Wagner and Brandon Shoers Generating Stations Report in support of Best Professional Judgment Best Technology Available Determination

View Attachment: View as format pdf

AKRF 2008b - Calvert Cliffs Nuclear Power Plant: Report in Support of Best Professional Judgment Best Technology Available Determination - September 2008

View Attachment: View as format pdf

Alden 2010a - Supplemental Report - Wagner

View Attachment: View as format pdf

Alden 2010b - Supplemental Report - Calvert Cliffs

View Attachment: View as format pdf

Alden and Electric Power Research Institute (EPRI) 2008a - Potential Alternative Fish Protection Options for the Calvert Cliffs Nuclear Power Plant with Respect to 316(b) BPJ Compliance

View Attachment: View as format pdf

Alden and Electric Power Research Institute (EPRI) 2008b - Potential Alternative Fish Protection Options for the H.A. Wagner Power Plant with Respect to 316(b) BPJ Compliance

View Attachment: View as format pdf

Comment

View Attachment: View as format pdf

EA 2008a - Comprehensive Impingement Mortality and Entrainment Characterization for C.P. Crane Generating Station

View Attachment: View as format pdf

EA 2008b - Comprehensive Impingement Mortality and Entrainment Characterization for Ginna Nuclear Power Plant

View Attachment: View as format pdf

EA 2008c - Entrainment Characterization Data Report for Calvert Cliffs Nuclear Power Plant

View Attachment: View as format pdf

EA 2010a - Comprehensive Assessment of Impingement Mortality and Entrainment to Support Determination of BTA Under the Clear Water Act Section 316(b) for the Nine Mile Point Nuclear Station Units 1 and 2

View Attachment: View as format pdf

EA 2010b - Proposal for Information Collection in Support of Best Professional Judgment Determination for Best Technology Available in Compliance with Clean Water Act Section 316(b) and Code of Maryland Regulations Riverside Generating Station

View Attachment: View as format pdf

Finfish and Blue Crab Impingement and Survival at the H.A. Wagner Generating Station for Baltimore Gas and Electric Company Final Report

View Attachment: View as format pdf

Hartman and Brandt 1995 - Page 520 only, Trophic Resource Partitioning, Diets, and Growth of Sympatric Estuarine Predators

View Attachment:

McLean et al. 2002 - Maryland Power Plant Cooling Water Intake Regulations and their Application in Evaluation of Adverse Environmental Implact

View Attachment: View as format pdf

North American Electric Reliability Corporation (NERC) 2010a - 2010 Special Reliability Scenario Assessment: Resoruce Adequacy Impacts of Potential U.S. Environmental Regulations

View Attachment: View as format pdf

North American Electric Reliability Corporation (NERC) 2010b - Long Term Reliability Assessment

View Attachment: View as format pdf

Reliability First Corporation 2010 - Long-term Resource Assessment, 2010-2019

View Attachment: View as format pdf

Shaw 2006 - Proposal for Information Collection, Cleanwater Act Section 316b

View Attachment: View as format pdf

The Seasonal Dynamics of the Chesapeake Bay Ecosystem

View Attachment:

Comments

Total: 0
No comments posted.

Related Documents

Total: 0
No documents available.