Exhibit 55 - Legislative History of the Water Pollution Control Act Amendments of 1972
View Attachment:
Title: Exhibit 55 - Legislative History of the Water Pollution Control Act Amendments of 1972
Exhibit 56 - S. 2770 Report No. 92-414 - 92d Congress 1st Session
View Attachment:
Title: Exhibit 56 - S. 2770 Report No. 92-414 - 92d Congress 1st Session
Exhibit 57 - A Legislative History of the Water Pollution Control Act Amendments of 1972
View Attachment:
Title: Exhibit 57 - A Legislative History of the Water Pollution Control Act Amendments of 1972
Exhibit 58 - A Legislative History of the Water Pollution Control Act Amendments of 1972
View Attachment:
Title: Exhibit 58 - A Legislative History of the Water Pollution Control Act Amendments of 1972
Exhibit 59 - In the Matter of Entergy Nuclear Indian Point 2, LLC and Entergy Nuclear Indian Point 3, LLC - Interim Decision
View Attachment:
Title: Exhibit 59 - In the Matter of Entergy Nuclear Indian Point 2, LLC and Entergy Nuclear Indian Point 3, LLC - Interim Decision
Abstract: DEC No: 3-5522-00011/00004, SPDES No. NY-0004472
Exhibit 60 - Bay Shore Plant FirstEnergy Comments on Draft Permit
View Attachment:
Title: Exhibit 60 - Bay Shore Plant FirstEnergy Comments on Draft Permit
Abstract: Letter to Michael J. Jirousek, Manager, Environmental, FirstEnergy Generation Corp. from Naajy S. Abdullah, Division of Surface Water, Northwest District Office, Ohio Environmental Protection Agency
Exhibit 61 - Surplus Production Compensation and Impact Assesments of Power Plants [DCN 2-018A]
View Attachment:
Title: Exhibit 61 - Surplus Production Compensation and Impact Assesments of Power Plants [DCN 2-018A]
Abstract: This document can be viewed at the USEPA Docket Center, Public Reading Room.
Address:
USEPA West
1301 Constitution Ave, NW
Room 3334
Washington, DC 20004
Telephone:
202-566-1744
Email:
docket-customerservice@epa.gov
Exhibit 62 - Minimizing Adverse Environmental Impact: How Murky the Waters
View Attachment:
Title: Exhibit 62 - Minimizing Adverse Environmental Impact: How Murky the Waters
Abstract: This document can be viewed at the USEPA Docket Center, Public Reading Room.
Address:
USEPA West
1301 Constitution Ave, NW
Room 3334
Washington, DC 20004
Telephone:
202-566-1744
Email:
docket-customerservice@epa.gov
Exhibit 63 - Dayton Power & Light (DP&L) Comments
View Attachment:
Title: Exhibit 63 - Dayton Power & Light (DP&L) Comments
Abstract: Letter to Sean Ramach, USEPA- Region 5 from JoAnne Rau, Director, Environmental Safety and Management, Dayton Power & Light (DP&L)
Exhibit 64 - In the Matter of Millstone Power Station - Applicant Post-Hearing Submittal
View Attachment:
Title: Exhibit 64 - In the Matter of Millstone Power Station - Applicant Post-Hearing Submittal
Exhibit 65 - In the Matter of Dynegy Northeast Generation, Inc., on behalf of Dynegy Danskammer, LLC - Decision of the New York State Department of Environmental Conservation
View Attachment:
Title: Exhibit 65 - In the Matter of Dynegy Northeast Generation, Inc., on behalf of Dynegy Danskammer, LLC - Decision of the New York State Department of Environmental Conservation
Abstract: Permittee. DEC No.: 3-3346-00011/00002, SPDES No.: NY-0006262
Exhibit 66 - Post-Issues Conference Brief - In the Matter of Mirant Bowline, LLC
View Attachment:
Title: Exhibit 66 - Post-Issues Conference Brief - In the Matter of Mirant Bowline, LLC
Abstract: Letter to Honorable Molly T. McBride, Administrative Law Judge, Office of Hearings and Mediation Services, New York State Department of Environmental Conservation. DEC No.: 3-3922-00003/00003, SPDES No.: NY-0008010
Exhibit 67 - New York Department of Environmental Conservation Comments regarding Entergy Indian Point Nuclear Units 2 and 3 May 16, 2011
View Attachment:
Title: Exhibit 67 - New York Department of Environmental Conservation Comments regarding Entergy Indian Point Nuclear Units 2 and 3 May 16, 2011
Abstract: Letter to Honorable Maria E. Villa and Honorable Daniel P. O'Connell, Administrative Law Judges, Office of Hearings and Mediation Services, New York State Department of Environmental Conservation
Exhibit 68 - Letter from Entergy Nuclear Indian Point 2, LLC to Judge Maria E. Villa, Administrative Law Judge, Office of Hearing and Mediation Services, New York State Department of Environmental Conservation May 17, 2011
View Attachment:
Title: Exhibit 68 - Letter from Entergy Nuclear Indian Point 2, LLC to Judge Maria E. Villa, Administrative Law Judge, Office of Hearing and Mediation Services, New York State Department of Environmental Conservation May 17, 2011
Abstract: Letter regarding In the Matter of Entergy Nuclear Indian Point 2, LLC, Entergy Nuclear Indian Point 3, LLC and Entergy Operation Inc. Joint Application for CWA 401 Water Quality Certification (WQC)
Exhibit 69 - Letter from Dayton Power and Light July 11, 1989
View Attachment:
Title: Exhibit 69 - Letter from Dayton Power and Light July 11, 1989
Abstract: Letter regarding Dayton Power & Light Company, J. M. Stuart Electric Generating Station, NPDES Permit No. OH004316, Ohio EPA Permit No. IOB00049*DD
Exhibit 70 - Letter from William L. Patberg, Shumaker, Loop & Kendrick, LLP on behalf of Dayton Power and Light April 9, 2003
View Attachment:
Title: Exhibit 70 - Letter from William L. Patberg, Shumaker, Loop & Kendrick, LLP on behalf of Dayton Power and Light April 9, 2003
Abstract: Letter regarding J. M. Stuart Station Temperature Limits
Exhibit 71 - An Engineering and Cost Assessment of Retrofitting Closed-Cycle Cooling Technologies at E. F. Barrett Power Station September 2007
View Attachment:
Title: Exhibit 71 - An Engineering and Cost Assessment of Retrofitting Closed-Cycle Cooling Technologies at E. F. Barrett Power Station September 2007
Abstract: Report prepared by Alden Research Laboratory, Inc.
Exhibit 72 - Ohio EPA Response to Comments
View Attachment:
Title: Exhibit 72 - Ohio EPA Response to Comments
Abstract: This document contains the Agency response to selected public comments. Ohio EPA ID #: 2IB00000
Exhibit 73 - Indian Point Energy Center Closed Cycle Cooling Conversion Feasibility Study Visual Assessment July 1, 2009
View Attachment:
Title: Exhibit 73 - Indian Point Energy Center Closed Cycle Cooling Conversion Feasibility Study Visual Assessment July 1, 2009
Abstract: This document can be viewed at the USEPA Docket Center, Public Reading Room.
Address:
USEPA West
1301 Constitution Ave, NW
Room 3334
Washington, DC 20004
Telephone:
202-566-1744
Email:
docket-customerservice@epa.gov
Exhibit 74 - Engineering Feasibility and Costs of Conversion of Indian Point Units 2 and 3 to a Closed-Loop Condenser Cooling Water Configuration February 12, 2010
View Attachment:
Title: Exhibit 74 - Engineering Feasibility and Costs of Conversion of Indian Point Units 2 and 3 to a Closed-Loop Condenser Cooling Water Configuration February 12, 2010
Abstract: Report prepared by Enercon Services, Inc.
Exhibit 75 - Cortlandt Petition for Party Status in Joint Adjudicatory Hearing
View Attachment:
Title: Exhibit 75 - Cortlandt Petition for Party Status in Joint Adjudicatory Hearing
Abstract: DEC Application Numbers: 3-5522-00011/00030 (IP2) and 3-5522-00105/00031 (IP3)
Exhibit 76 - Memorandum of Law in Support of Cortlandt Petition for Party Status
View Attachment:
Title: Exhibit 76 - Memorandum of Law in Support of Cortlandt Petition for Party Status
Exhibit 77 - State Water Resources Control Board Once-Through Cooling Water Policy. Implementation Plan for Moss Landing Power Plant April 1, 2011
View Attachment:
Title: Exhibit 77 - State Water Resources Control Board Once-Through Cooling Water Policy. Implementation Plan for Moss Landing Power Plant April 1, 2011
Abstract: Report prepared by Dynegy Moss Landing, LLC
Exhibit 78 - Email from John Dennis regarding LADWP - Follow Up on Schedule and Costs
View Attachment:
Title: Exhibit 78 - Email from John Dennis regarding LADWP - Follow Up on Schedule and Costs
Abstract: Email regarding LADWP - Follow Up to 071610 Phone Discussion Schedule and Costs Due to Statewide OTC Policy
Exhibit 79 - Harbor Beach Michigan Department of Environmental Quality (MDEQ) Pre-Hearing Statement
View Attachment:
Title: Exhibit 79 - Harbor Beach Michigan Department of Environmental Quality (MDEQ) Pre-Hearing Statement
Abstract: NPDES No. MI00001856
Exhibit 80 - Evaluation of Alternative Intake Technologies at Indian Point Units 2 and 3 February 12, 2010
View Attachment:
Title: Exhibit 80 - Evaluation of Alternative Intake Technologies at Indian Point Units 2 and 3 February 12, 2010
Abstract: Report prepared by Enercon Services, Inc.
Exhibit 81 - Dayton Power and Light (DP&L) Public Fact Sheet: J.M. Stuart Station NPDES Permit Renewal
View Attachment:
Title: Exhibit 81 - Dayton Power and Light (DP&L) Public Fact Sheet: J.M. Stuart Station NPDES Permit Renewal
Details Information
Attachments:
Exhibit 55 - Legislative History of the Water Pollution Control Act Amendments of 1972
View Attachment:Exhibit 56 - S. 2770 Report No. 92-414 - 92d Congress 1st Session
View Attachment:Exhibit 57 - A Legislative History of the Water Pollution Control Act Amendments of 1972
View Attachment:Exhibit 58 - A Legislative History of the Water Pollution Control Act Amendments of 1972
View Attachment:Exhibit 59 - In the Matter of Entergy Nuclear Indian Point 2, LLC and Entergy Nuclear Indian Point 3, LLC - Interim Decision
View Attachment:Exhibit 60 - Bay Shore Plant FirstEnergy Comments on Draft Permit
View Attachment:Exhibit 61 - Surplus Production Compensation and Impact Assesments of Power Plants [DCN 2-018A]
View Attachment:Exhibit 62 - Minimizing Adverse Environmental Impact: How Murky the Waters
View Attachment:Exhibit 63 - Dayton Power & Light (DP&L) Comments
View Attachment:Exhibit 64 - In the Matter of Millstone Power Station - Applicant Post-Hearing Submittal
View Attachment:Exhibit 65 - In the Matter of Dynegy Northeast Generation, Inc., on behalf of Dynegy Danskammer, LLC - Decision of the New York State Department of Environmental Conservation
View Attachment:Exhibit 66 - Post-Issues Conference Brief - In the Matter of Mirant Bowline, LLC
View Attachment:Exhibit 67 - New York Department of Environmental Conservation Comments regarding Entergy Indian Point Nuclear Units 2 and 3 May 16, 2011
View Attachment:Exhibit 68 - Letter from Entergy Nuclear Indian Point 2, LLC to Judge Maria E. Villa, Administrative Law Judge, Office of Hearing and Mediation Services, New York State Department of Environmental Conservation May 17, 2011
View Attachment:Exhibit 69 - Letter from Dayton Power and Light July 11, 1989
View Attachment:Exhibit 70 - Letter from William L. Patberg, Shumaker, Loop & Kendrick, LLP on behalf of Dayton Power and Light April 9, 2003
View Attachment:Exhibit 71 - An Engineering and Cost Assessment of Retrofitting Closed-Cycle Cooling Technologies at E. F. Barrett Power Station September 2007
View Attachment:Exhibit 72 - Ohio EPA Response to Comments
View Attachment:Exhibit 73 - Indian Point Energy Center Closed Cycle Cooling Conversion Feasibility Study Visual Assessment July 1, 2009
View Attachment:Exhibit 74 - Engineering Feasibility and Costs of Conversion of Indian Point Units 2 and 3 to a Closed-Loop Condenser Cooling Water Configuration February 12, 2010
View Attachment:Exhibit 75 - Cortlandt Petition for Party Status in Joint Adjudicatory Hearing
View Attachment:Exhibit 76 - Memorandum of Law in Support of Cortlandt Petition for Party Status
View Attachment:Exhibit 77 - State Water Resources Control Board Once-Through Cooling Water Policy. Implementation Plan for Moss Landing Power Plant April 1, 2011
View Attachment:Exhibit 78 - Email from John Dennis regarding LADWP - Follow Up on Schedule and Costs
View Attachment:Exhibit 79 - Harbor Beach Michigan Department of Environmental Quality (MDEQ) Pre-Hearing Statement
View Attachment:Exhibit 80 - Evaluation of Alternative Intake Technologies at Indian Point Units 2 and 3 February 12, 2010
View Attachment:Exhibit 81 - Dayton Power and Light (DP&L) Public Fact Sheet: J.M. Stuart Station NPDES Permit Renewal
View Attachment:Comments
Related Documents