Code of Federal Regulations (Last Updated: November 8, 2024) |
Title 40 - Protection of Environment |
Chapter I - Environmental Protection Agency |
SubChapter I - Solid Wastes |
Part 270 - EPA Administered Permit Programs: the Hazardous Waste Permit Program |
Subpart A - General Information |
§ 270.1 - Purpose and scope of the regulations in this part. |
§ 270.2 - Definitions. |
§ 270.3 - Considerations under Federal law. |
§ 270.4 - Effect of a permit. |
§ 270.5 - Noncompliance and program reporting by the Director. |
§ 270.6 - References. |
Subpart B - Permit Application |
§ 270.10 - General application requirements. |
§ 270.11 - Signatories to permit applications and reports. |
§ 270.12 - Confidentiality of information. |
§ 270.13 - Contents of part A of the permit application. |
§ 270.14 - Contents of part B: General requirements. |
§ 270.15 - Specific part B information requirements for containers. |
§ 270.16 - Specific part B information requirements for tank systems. |
§ 270.17 - Specific part B information requirements for surface impoundments. |
§ 270.18 - Specific part B information requirements for waste piles. |
§ 270.19 - Specific part B information requirements for incinerators. |
§ 270.20 - Specific part B information requirements for land treatment facilities. |
§ 270.21 - Specific part B information requirements for landfills. |
§ 270.22 - Specific part B information requirements for boilers and industrial furnaces burning hazardous waste. |
§ 270.23 - Specific part B information requirements for miscellaneous units. |
§ 270.24 - Specific part B information requirements for process vents. |
§ 270.25 - Specific part B information requirements for equipment. |
§ 270.26 - Special part B information requirements for drip pads. |
§ 270.27 - Specific Part B information requirements for air emission controls for tanks, surface impoundments, and containers. |
§ 270.28 - Part B information requirements for post-closure permits. |
§ 270.29 - Permit denial. |
Subpart C - Permit Conditions |
§ 270.30 - Conditions applicable to all permits. |
§ 270.31 - Requirements for recording and reporting of monitoring results. |
§ 270.32 - Establishing permit conditions. |
§ 270.33 - Schedules of compliance. |
Subpart D - Changes to Permit |
§ 270.40 - Transfer of permits. |
§ 270.41 - Modification or revocation and reissuance of permits. |
§ 270.42 - Permit modification at the request of the permittee. |
§ 270.43 - Termination of permits. |
Subpart E - Expiration and Continuation of Permits |
§ 270.50 - Duration of permits. |
§ 270.51 - Continuation of expiring permits. |
Subpart F - Special Forms of Permits |
§ 270.60 - Permits by rule. |
§ 270.61 - Emergency permits. |
§ 270.62 - Hazardous waste incinerator permits. |
§ 270.63 - Permits for land treatment demonstrations using field test or laboratory analyses. |
§ 270.64 - Interim permits for UIC wells. |
§ 270.65 - Research, development, and demonstration permits. |
§ 270.66 - Permits for boilers and industrial furnaces burning hazardous waste. |
§ 270.67 - RCRA standardized permits for storage and treatment units. |
§ 270.68 - Remedial Action Plans (RAPs). |
Subpart G - Interim Status |
§ 270.70 - Qualifying for interim status. |
§ 270.71 - Operation during interim status. |
§ 270.72 - Changes during interim status. |
§ 270.73 - Termination of interim status. |
Subpart H - Remedial Action Plans (RAPs) |
§ 270.79 - Why is this subpart written in a special format? |
Operating Under Your Rap |
§ 270.210 - What records must I maintain concerning my RAP? |
§ 270.215 - How are time periods in the requirements in this subpart and my RAP computed? |
§ 270.220 - How may I transfer my RAP to a new owner or operator? |
§ 270.225 - What must the State or EPA Region report about noncompliance with RAPs? |
General Information |
§ 270.80 - What is a RAP? |
§ 270.85 - When do I need a RAP? |
§ 270.90 - Does my RAP grant me any rights or relieve me of any obligations? |
Getting a Rap Approved |
§ 270.130 - What is the process for approving or denying my application for a RAP? |
§ 270.135 - What must the Director include in a draft RAP? |
§ 270.140 - What else must the Director prepare in addition to the draft RAP or notice of intent to deny? |
§ 270.145 - What are the procedures for public comment on the draft RAP or notice of intent to deny? |
§ 270.150 - How will the Director make a final decision on my RAP application? |
§ 270.155 - May the decision to approve or deny my RAP application be administratively appealed? |
§ 270.160 - When does my RAP become effective? |
§ 270.165 - When may I begin physical construction of new units permitted under the RAP? |
Applying for a Rap |
§ 270.95 - How do I apply for a RAP? |
§ 270.100 - Who must obtain a RAP? |
§ 270.105 - Who must sign the application and any required reports for a RAP? |
§ 270.110 - What must I include in my application for a RAP? |
§ 270.115 - What if I want to keep this information confidential? |
§ 270.120 - To whom must I submit my RAP application? |
§ 270.125 - If I submit my RAP application as part of another document, what must I do? |
How May My Rap Be Modified, Revoked and Reissued, or Terminated? |
§ 270.170 - After my RAP is issued, how may it be modified, revoked and reissued, or terminated? |
§ 270.175 - For what reasons may the Director choose to modify my final RAP? |
§ 270.180 - For what reasons may the Director choose to revoke and reissue my final RAP? |
§ 270.185 - For what reasons may the Director choose to terminate my final RAP, or deny my renewal application? |
§ 270.190 - May the decision to approve or deny a modification, revocation and reissuance, or termination of my RAP be administratively appealed? |
§ 270.195 - When will my RAP expire? |
§ 270.200 - How may I renew my RAP if it is expiring? |
§ 270.205 - What happens if I have applied correctly for a RAP renewal but have not received approval by the time my old RAP expires? |
Obtaining a Rap for an off-Site Location |
§ 270.230 - May I perform remediation waste management activities under a RAP at a location removed from the area where the remediation wastes originated? |
Subpart I - Integration with Maximum Achievable Control Technology (MACT) Standards |
Subpart J - RCRA Standardized Permits for Storage and Treatment Units |
Modifying a Standardized Permit |
§ 270.320 - How do I modify my RCRA standardized permit? |
General Information About Standardized Permits |
§ 270.250 - What is a RCRA standardized permit? |
§ 270.255 - Who is eligible for a standardized permit? |
§ 270.260 - What requirements of part 270 apply to a standardized permit? |
Information That Must Be Kept at Your Facility |
§ 270.290 - What general types of information must I keep at my facility? |
§ 270.300 - What container information must I keep at my facility? |
§ 270.305 - What tank information must I keep at my facility? |
§ 270.310 - What equipment information must I keep at my facility? |
§ 270.315 - What air emissions control information must I keep at my facility? |
Applying for a Standardized Permit |
§ 270.270 - How do I apply for a standardized permit? |
§ 270.275 - What information must I submit to the permitting agency to support my standardized permit application? |
§ 270.280 - What are the certification requirements? |