§ 451.7 - Metering requirements.  


Latest version.
  • § 451.7 Metering requirements.

    The net electric energy generated and sold (kilowatt-hours) by the owner or operator of a qualified renewable energy facility must be measured by a standard metering device that -

    (a) Meets generally accepted industry standards;

    (b) Is maintained in proper working order according to the instructions of its manufacturer; and

    (c) Is calibrated according to generally accepted industry standards.