Code of Federal Regulations (Last Updated: November 8, 2024) |
Title 14 - Aeronautics and Space |
Chapter I - Federal Aviation Administration, Department of Transportation |
SubChapter G - Air Carriers and Operators for Compensation or Hire: Certification and Operations |
Part 121 - Operating Requirements: Domestic, Flag, and Supplemental Operations |
Subpart V - Records and Reports |
§ 121.705 - Mechanical interruption summary report.
-
§ 121.705 Mechanical interruption summary report.
Each certificate holder shall submit to the Administrator, before the end of the 10th day of the following month, a summary report for the previous month of:
(a) Each interruption to a flight, unscheduled change of aircraft en route, or unscheduled stop or diversion from a route, caused by known or suspected mechanical difficulties or malfunctions that are not required to be reported under § 121.703.
(b) The number of engines removed prematurely because of malfunction, failure or defect, listed by make and model and the aircraft type in which it was installed.
(c) The number of propeller featherings in flight, listed by type of propeller and engine and aircraft on which it was installed. Propeller featherings for training, demonstration, or flight check purposes need not be reported.
[Doc. No. 6258, 29 FR 19226, Dec. 31, 1964, as amended by Amdt. 121-10, 30 FR 10025, Aug. 12, 1965; Amdt. 121-319, 70 FR 76979, Dec. 29, 2005]