Subpart E - Oil and Gas Well-Completion Operations  


§ 250.500 - General requirements.
§ 250.501 - Definition.
§ 250.502 - [Reserved]
§ 250.503 - Emergency shutdown system.
§ 250.504 - Hydrogen sulfide.
§ 250.505 - Subsea completions.
§ 250.506 - Crew instructions.
§ 250.507 - Welding and burning practices and procedures.
§ 250.508 - Electrical requirements.
§ 250.509 - Well-completion structures on fixed platforms.
§ 250.510 - Diesel engine air intakes.
§ 250.511 - Traveling-block safety device.
§ 250.512 - Field well-completion rules.
§ 250.513 - Approval and reporting of well-completion operations.
§ 250.514 - Well-control fluids, equipment, and operations.
§ 250.515 - What BOP information must I submit?
§ 250.516 - Blowout prevention equipment.
§ 250.517 - Blowout preventer system tests, inspections, and maintenance.
§ 250.518 - Tubing and wellhead equipment.
Casing Pressure Management
§ 250.519 - What are the requirements for casing pressure management?
§ 250.520 - How often do I have to monitor for casing pressure?
§ 250.521 - When do I have to perform a casing diagnostic test?
§ 250.522 - How do I manage the thermal effects caused by initial production on a newly completed or recompleted well?
§ 250.523 - When do I have to repeat casing diagnostic testing?
§ 250.524 - How long do I keep records of casing pressure and diagnostic tests?
§ 250.525 - When am I required to take action from my casing diagnostic test?
§ 250.526 - What do I submit if my casing diagnostic test requires action?
§ 250.527 - What must I include in my notification of corrective action?
§ 250.528 - What must I include in my casing pressure request?
§ 250.529 - What are the terms of my casing pressure request?
§ 250.530 - What if my casing pressure request is denied?
§ 250.531 - When does my casing pressure request approval become invalid?
§§ 250.515--250.517 - [Reserved]
§§ 250.506--250.508 - [Reserved]
§§ 250.507--250.508 - [Reserved]